Village of Red Hook Water & Wastewater Treatment Monthly Report — May 2, 2023

1 versions2023-05-08attached document

Document

Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571

==> picture [36 x 6] intentionally omitted <==

----- Start of picture text -----

05/02/2023 ----- End of picture text -----

==> picture [458 x 318] intentionally omitted <==

----- Start of picture text -----

Water System Water System Notes: Monthly Total Coliform All monthly coliform tests were completed with no presence of coliform or e. coli Deficiencies Well Control Issues Waiting for SCADA update Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in place. Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells 14 & Well Level/Flow 15 as there is a short in wiring between the plant and the wells Van Hangers Van Hangers for water pipe & Chlorine analyzer are corroded. Verify if Village or C3ND is going to replace Gases Chlorine gases gettnig into control room. Dicussed potentially moving door to outside of chlorine room andblocking off existing door. Control Room Heat Control room heater. Discuss if permamnent heating or purchase of small space heater is better suited. For Future Notes: ----- End of picture text -----

Wastewater System Wastewater System Notes: Sample results for March 2023, with reporting submitted on or before April 28, 2023.

==> picture [422 x 168] intentionally omitted <==

----- Start of picture text -----

Required Samples Result Compliance BOD <4.0 March 2023 TSS <10 10 mg/L NH3 <0.5 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Anoxic Mixers Currently a Medora mixer in place to keep Anoxic tank solids moving. May need to consider this in future updates. Sand Filter Rebuild Sand Filters have never been rebuilt or media replaced. Should price and schedule for the near future. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sent for review. Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and Pump Station pump station pump outs. Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. Van Hangers Van Hangers for water pipe & Chlorine analyzer are corroded. Verify if Village or C3ND is going to replace ----- End of picture text -----

References

This document cites or incorporates the following separate documents:

  • 2023-05-08NYS DEC Wastewater Facility Operation Report — March 2023
    Document A is a Village internal monthly report on water/wastewater operations; Document B is the NYS DEC regulatory compliance report for the same facility for the same month—two separate documents serving different institutional purposes (internal operations vs. state regulatory filing).

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: