Red Hook WatchIndependent Community Resource

WWTP Upgrade and STEP Sewer System - Phase 2 Preliminary Engineering Report

1 versions2024-06-10working document

Document

Original file not available online (local: data/sources/village_docs/dc_1285_village_of_red_hook_wwtp_capacity_upgrad.pdf)View version history →Meeting on 2024-06-10 →

==> picture [262 x 698] intentionally omitted <==

DRAFT June 10, 2024

Engineering Report

WWTP Upgrade and STEP Sewer System - Phase 2

VILLAGE OF RED HOOK

Dutchess County, New York

JUNE 2024

SPDES #NY0271420 CWSRF #C3-5387-01-01

==> picture [612 x 52] intentionally omitted <==

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

Table of Contents

I. Executive Summary ........................................................................... 4 II. Project Background and History ................................................. 5 2.1 SITE INFORMATION ............................................................................................. 5 2.1.1 Location .....................................................................................................................5 2.1.2 Geologic Conditions .................................................................................................7 2.1.3 Environmental Resources ..........................................................................................8 2.1.4 Floodplain Considerations ...................................................................................... 12 2.1.5 Impacts to Environmental Justice Areas and Disadvantaged Communities ...... 13 2.2 OWNERSHIP AND SERVICE AREA ...................................................................... 13 2.2.1 Outside Users ........................................................................................................... 13 2.2.2 Industrial Discharges ............................................................................................... 14 2.2.3 Hauled Waste .......................................................................................................... 14 2.2.4 Population Trends and Growth ............................................................................... 14 2.3 EXISTING FACILITIES AND PRESENT CONDITION ............................................... 16 2.3.1 General Description and History of Major System Components .......................... 16 2.3.2 Significant Operations, and Maintenance History and Preventative Maintenance History ........................................................................................................ 19 2.3.3 Failure History and Component Limitations ........................................................... 19 2.3.4 Ability to Meet Current Design Standards for Treatment ...................................... 19 2.3.5 Planned, Current, or Future Improvements Outside Project Scope ..................... 19 2.3.6 Security and Cybersecurity ..................................................................................... 19 2.3.7 Hydraulic Capacity Analysis of Existing Sewers where Expansion or Increased Flow is Proposed ............................................................................................................... 19 2.3.8 Current or Future Projects on the Same Site .......................................................... 20 2.3.9 SPDES Permit Conditions and Effluent Discharge Limits ........................................ 20 2.3.10 Publicly Owned Sewer System Identification Number ........................................ 21 2.3.11 Documented Compliance Issues ......................................................................... 21 2.3.12 Design Flows and Waste Loads ............................................................................. 21 2.3.13 Analyses of Production Rates for Processing or Manufacturing Operations ...... 21 2.3.14 Existing Energy Consumption ................................................................................ 21 2.3.15 Photographs .......................................................................................................... 21 2.3.16 History of Damage due to Storm or Flood Impacts ............................................. 21

1

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.4 DEFINITION OF THE PROBLEM & NEED FOR THE PROJECT .................................. 22 2.4.1 Health, Sanitation, Security and Cybersecurity .................................................... 22 2.4.2 Short-term Asset Needs as supported by a Capital Improvement Plan or Asset Management Plan ........................................................................................................... 22 2.4.3 Aging Infrastructure ................................................................................................. 22 2.4.4 Need for Redundancy ............................................................................................ 23 2.4.5 Infiltration and Inflow, CSOs and SSOs ................................................................... 23 2.4.6 Reasonable Growth ................................................................................................ 23 2.4.7 County-Wide or Regional Planning Efforts ............................................................. 23 2.4.8 Water, Energy and Waste Considerations ............................................................. 24 2.4.9 Suitability for Continued Use ................................................................................... 24 2.4.10 Physical Risk due to Climate Change .................................................................. 24 2.4.11 Compliance with Current Standards .................................................................... 24 2.5 FINANCIAL STATUS ........................................................................................... 25 III. Phase 2 Sewer Service Area ...................................................... 26 IV. Alternative Analysis .................................................................. 29 4.1 ALTERNATIVE 1. UPGRADE EXISTING WWTP WITH ADDITIONAL 190,000 GPD MBR PLANT ..................................................................................................................... 29 4.1.1 Description ............................................................................................................... 29 4.1.2 Cost Estimate ........................................................................................................... 30 4.1.3 Non-Monetary Factors ............................................................................................ 30 4.2 ALTERNATIVE 2. UPGRADE EXISTING WWTP WITH ADDITIONAL 250,000 GPD MBR PLANT ..................................................................................................................... 31 4.2.1 Description ............................................................................................................... 31 4.2.2 Cost Estimate ........................................................................................................... 32 4.2.3 Non-Monetary Factors ............................................................................................ 32 4.3 ALTERNATIVE 3. UPGRADE EXISTING WWTP TO FULL BUILD OUT 750,000 GPD MBR PLANT ............................................................................................................. 33 4.3.1 Description ............................................................................................................... 33 4.3.2 Cost Estimate ........................................................................................................... 34 4.3.3 Non-Monetary Factors ............................................................................................ 34

2

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

4.4 ALTERNATIVE 4. NO-ACTION ALTERNATIVE ....................................................... 35 4.5 REGIONAL CONSOLIDATION OPPORTUNITIES ................................................... 35 V. Summary and Comparison of Alternatives ............................... 36 5.1 COMPARISON OF FEASIBLE ALTERNATIVES ....................................................... 36 5.2 LIFE-CYCLE COST ANALYSIS ............................................................................. 37 VI. Recommended Alternative ......................................................... 37 6.1 BASIS OF SELECTION ......................................................................................... 37 6.2 COST ESTIMATE ................................................................................................. 38 6.3 PROJECT SCHEDULE AND NEXT STEPS ............................................................... 38 6.4 ENVIRONMENTAL REVIEW, PERMITS AND APPROVALS ...................................... 39 VII. Engineering Report Certification ........................................... 39 VIII. Smart Growth ............................................................................ 40

List of Appendices:

Appendix A NRCS Soil Reports Appendix B NY Heritage Program Determination/Environmental Resource Mapper Appendix C IPaC Consultation Appendix D FEMA Flood Maps Appendix E Hydraulic Grade Line Analysis Appendix F SPDES Permit Appendix G Photographs Appendix H EDU Count and Charges (April 2023) Appendix I Operation and Maintenance Budget 2023/2024 Appendix J Septic Tank Technical Data Sheets Appendix K Cost Estimates

Appendix L WWTP Upgrade Alternative Drawings

Appendix M Proposed Service Area and Collection System Map

Appendix N Engineering Report Certification

3

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

I. Executive Summary

The Village of Red Hook is a community located in northern Dutchess County, along the eastern shore of the Hudson River, in the Central Hudson region of New York State. The entire Village and portions of the surrounding Town are currently served by a municipal water supply; however, public wastewater treatment has only just been established within portions of the Village. The remaining properties within the Village are served by on-site treatment systems that are known to be substandard or failing, polluting the Village’s water supply.

The Village is considered a Potential Environmental Justice Area, and as such, its citizens can be disproportionally impacted by failing septic systems and polluted public water supplies. The Village has recognized the need to protect the environment, potable water supply and the health and safety of its citizens.

Phase 1 of the Village’s wastewater project included purchasing a private wastewater treatment plant rated for 25,000 gpd. The Village expanded the treatment capacity to 75,000 gpd by constructing a new wastewater treatment plant in 2023. The Phase 1 sewer service area connected the commercial and residential properties along Route 9 and Route 199.

This engineering report covers Phase 2 of the Village’s wastewater system. The proposed alternatives consider equipment/process upgrades, reuse or replacement and the construction of a new wastewater treatment plant along with the expansion of the existing collection system. Alternatives were evaluated based on capital improvement costs, lifecycle costs, constructability, operation and maintenance considerations and property owner burden.

The proposed alternative adds nearly 170 properties and expands the total treatment capacity to 300,000 gpd allowing for additional interconnections. The total probable cost for the proposed work is $19.5M. To finance the project, the Village will need to pursue all available funding options.

4

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

II. Project Background and History

2.1 SITE INFORMATION

2.1.1 Location

The Village of Red Hook (Village) is in the Town of Red Hook and northern Dutchess County, New York along the eastern shore of the Hudson River, in the Central Hudson Region of New York State. The Village is just over 1 square mile in size and is bisected by Route 9 running north and south and Route 199 running east and west.

The wastewater treatment plant (WWTP), owned, operated, and maintained by the Village, is in the southwestern portion of the Village, off US Route 9 and O’Callaghan Lane. The WWTP discharges to a sub tributary of the Saw Kill, a NYS Department of Environmental Conservation (DEC) Class C(T) stream, through Outfall 001 (41° 59’ 29” N, 73° 53’ 05” W). A USGS topographic location map depicting the WWTP location is included below ( Figure 2 ).

According to 2021 Census data estimates, the community has a median household income (MHI) of $88,482, population of 1,921 and a family poverty rate of 4.3%. The WWTP currently serves approximately 127 developed properties (150 hook-ups) and an additional 15 undeveloped lots within the Village.

==> picture [346 x 225] intentionally omitted <==

Figure 1. Village of Red Hook Existing Sewer Service Area

5

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

==> picture [471 x 609] intentionally omitted <==

Figure 2. Village of Red Hook USGS Quadrangle Location Map

6

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.1.2 Geologic Conditions

There are no unique geologic features within the Village. The area has gently rolling to moderately hilly topography with fast draining coarse sand and gravel. According to the NRCS Custom Soil Resource Report for the WWTP site, the land is comprised of Canandaigua silt loam (Ca) and Haven-Urban land complex (Hf). The Village is made up of over 10 different soil types, summarized in the table below. Appendix A contains the NRCS Soil Surveys for the WWTP site and the entire Village.

Table 1. Village of Red Hook Soil Characteristics

Table 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil CharacteristicsTable 1. Village of Red Hook Soil Characteristics
Soil
SymbolSoil NameDrainage
ClassSlopeDepth to
BedrockDepth to
Water
TableFarmland
Class.Hydric
SoilsHydrologic
Soil Group
CaCanadaigua
silt loam,
neutral
substratumPoorly
Drained0-3%>80
inches0 inchesStatewide
ImportanceYesC/D
DwBDutchess-
Cardigan
complex,
undulating,
rockyWell
Drained1-6%>80
inches>80
inchesPrime
FarmlandNoB
FrFredon silt
loamPoorly
Drained0-3%>80
inches6-18
inchesPrime
FarmlandNoB/D
HaHalsey mucky
silt loamPoorly
Drained0-3%>80
inches0-6
inchesN/AYesB/D
HeAHaven loam,
nearly levelWell
Drained0-3%>80
inches>80
inchesPrime
FarmlandNoB
HeBHaven loam,
undulatingWell
Drained3-8%>80
inches>80
inchesPrime
FarmlandNoB
HfHaven-Urban
land complexWell
Drained0-3%>80
inches>80
inchesN/ANoB
HsAHoosic
gravelly loam,
nearly levelExcessively
Drained0-3%>80
inches>80
inchesStatewide
ImportanceNoA
HsBHoosic
gravelly loam,
undulatingExcessively
Drained1-6%>80
inches>80
inchesStatewide
ImportanceNoA
NwCNassau-
Cardigan
complex,
rolling, very
rockyExcessively
Drained5-15%10-20
inches>80
inchesN/ANoD
NwDNassau-
Cardigan
complex, hilly,
veryrockyExcessively
Drained15-30%10-20
inches>80
inchesN/ANoD
WyWayland Silt
LoamPoorly
Drained0-3%>80
inches0 inchesN/AYesC/D

7

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

Bedrock Geology of the Village is Austin Glen Formation (Oag). More information on the composition of the area is shown in the table below.

Table 2. Bedrock GeologyTable 2. Bedrock Geology
State:NY
Name:Austin Glen Formation(Oag)
Geologic Age:Middle Ordovician
Lithologic Constituents:MajorSedimentary> Clastic > Mudstone > Shale
Sedimentary> Clastic > Sandstone > Graywacke

Surficial Geology of the Village includes the following:

  • Kame Deposits (k), including coarse to fine gravel and sand, kames, eskers, kame terraces kame deltas, ice contact or ice cored deposition, with lateral variability in sorting, texture and permeability, it may be firmly cemented with calcareous cement.

  • Till (t), including Glacial till, is the dominant overburden throughout. It also contains variable texture and usually poorly sorted sand-rich diamect which was deposited beneath glacier ice.

It is not anticipated that geologic conditions will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits.

2.1.3 Environmental Resources

Waterbodies: Several streams/rivers are located in and around the Village which is in the Lower and Middle Hudson River Drainage Basin. The WWTP discharges to a Tributary of the Saw Kill Creek (PWL 1301-0085), a NYSDEC Class C(T) stream at the point of discharge. There are no other classified waterbodies within the Village. The Saw Kill as a whole is a NYSDEC Class B(T), C(T) and C stream with no use impairments.

The Rhinebeck Kill and tributaries (1301-0210) are located just south of the Village along Old Farm Road. The Rhinebeck Kill is a NYSDEC Class C stream. It is best used for fishing, which is considered stressed due to pH.

According to the Environmental Resource Mapper, there are no Mussel Screening Streams or Ponded Waters within the Village. The Saw Kill Creek, located in the Town of Red Hook

8

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

is a NYSDEC Mussel Screening Stream and a classified as Class B(T) in that section of the waterbody.

There are no Coastal Areas or Designated Inland Waterways near the Village. The project is not located within a designated river corridor under the Wild, Scenic and Recreational Rivers program.

The Village is located within the Lakes Kill-Saw Kill (020200061104) NYS Hydrologic Unit Code (HUC)12. Dutchess County is part of the Hudson River Basin and also the Housatonic River basin in Connecticut. Most surface drainage in the area flows to the Hudson River through creeks and streams. The Saw Kill and Stony Creek drain the majority of the Town and Village of Red Hook.

It is not anticipated that nearby waterbodies will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits. The Village of Red Hook will work closely with NYSDEC and other applicable agencies to ensure that waterbodies are protected throughout the life of the project.

Wetlands: There are no Regulatory Tidal Wetlands near the Village. NYSDEC Freshwater Wetlands and Check Zones can be found throughout the Village, including on the existing WWTP parcel. NWI Classified Wetlands can also be found throughout the Village, including the existing WWTP parcel.

It is not anticipated that nearby wetlands will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits. The Village of Red Hook will work closely with NYSDEC, US Army Corps. Of Engineers (ACOE) and other applicable agencies to ensure that wetlands are protected throughout the life of the project.

9

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

==> picture [450 x 319] intentionally omitted <==

Figure 3. Village of Red Hook Wetlands Map

Aquifers: According to NYSDEC data, there are no Primary Aquifers near the Village. The Village is located over a principal aquifer. This sole source aquifer has been shown to be negatively impacted by substandard septic tanks located throughout the Village.

It is not anticipated that aquifers will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits. The Village will work closely with NYSDEC and other applicable agencies to ensure that aquifers are protected throughout the life of the project.

Endangered Species: There are no Critical Environmental Areas, Significant Natural Communities or National Natural Landmarks near the Village. Rare Plants and/or Rare Animals may occur in the northern portion of the Village. A NY Heritage Program Determination for the project areas is included as Appendix B .

10

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

According to the US Fish and Wildlife Service (FWS) Information for Planning and Consultation (IPaC) online application ( Appendix C ), the following species may be found in the Village:

  • Indiana Bat (E)

  • Northern Long-Eared Bat (E)

  • Monarch Butterfly (C)

  • Bald Eagle

  • Golden Eagle

It is not anticipated that endangered or threatened species will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits. The Village of Red Hook will work closely with NYSDEC, US FWS, ACOE and other applicable agencies to ensure that species are protected throughout the life of the project.

Archeologically Sensitive Areas: According to NY SHPO CRIS online mapping application, there are no Historic Districts or Building Districts within the Village. While the WWTP is located outside of Archaeologically Sensitive Areas, the majority of the Village is located within those sensitive areas. The WWTP site and sewer service area went through a consultation with NY State Historic Preservation Office (SHPO) in 2016 (16PR00149) and many of the Village streets were included in a Phase 1A/1B archaeological survey when the water system was installed in 2012 (12SR61052).

It is not anticipated that archaeological resources will be negatively impacted by the WWTP upgrade project. The Village will work closely with NY SHPO to ensure that archaeological resources are protected throughout the life of the project.

Agricultural Districts: According to the Dutchess County Agricultural District Viewer, small portions of the Village are in an agricultural district (DUTC020). These areas occur on the outskirts of the Village. The WWTP site is not located in the vicinity of any agricultural districts or agricultural resources.

It is not anticipated that agricultural lands will be negatively impacted by the WWTP upgrade project. The elimination of additional substandard septic systems and seepage pits will have many environmental, health and safety benefits. The Village of Red Hook will

11

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

work closely with applicable agencies to ensure that important agricultural resources are protected throughout the life of the project.

2.1.4 Floodplain Considerations

The WWTP site is not subject to flooding and is located outside of flood prone areas as shown in Figure 4 below. There is a small area in the northern portion of the Village that is located in Zone AE and the Regulatory Floodway. Base Flood Elevations (BFE) in that area are 183 feet. Appendix D contains FEMA flood maps for the entire Village.

==> picture [451 x 349] intentionally omitted <==

Figure 4. Village of Red Hook WWTP FEMA Flood Map

It is not anticipated that flood prone areas will be impacted by the WWTP upgrade project. The Village will work closely with FEMA and other applicable agencies to ensure that infrastructure is protected throughout the life of the project and all project aspects meet NYS Community Risk and Resiliency Act (CRRA) guidance where applicable.

12

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.1.5 Impacts to Environmental Justice Areas and Disadvantaged Communities

The Village of Red Hook is comprised of a large Potential Environmental Justice Area (PEJA), as shown in Figure 5 below. There are no Disadvantaged Communities (DAC) in the immediate vicinity. The proposed project will not have adverse impacts on any PEJAs or DACs. The elimination of substandard septic systems and seepage pits will have many environmental, health and safety benefits, especially to the low income and minority populations found in PEJAs.

==> picture [469 x 362] intentionally omitted <==

Figure 5. Village of Red Hook PEJA and DAC Map

2.2 OWNERSHIP AND SERVICE AREA

2.2.1 Outside Users

There are no existing/required inter-municipal or industrial agreements. The WWTP serves only sewer users within the Village of Red Hook sewer service area.

13

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.2.2 Industrial Discharges

There are no industrial discharges associated with the WWTP.

2.2.3 Hauled Waste

The Village is responsible for sludge removal at the WWTP and in each individual septic tank and grease trap. Sludge is trucked off-site by a sludge pumping and hauling contractor.

2.2.4 Population Trends and Growth

According to 2021 Census data estimates, the Village of Red Hook has an MHI of $88,482, population of 1,921 and a family poverty rate of 4.3%. Dutchess County has an MHI of $87,112, population of 296,012 and a family poverty rate of 5.8%. The following population trends and growth were compiled using data obtained from the US Census Bureau for the Village of Red Hook and Dutchess County. Population data from 1970 to 2020 was analyzed to estimate the population for each year up to the year 2060, or an approximate period of probable usefulness (PPU) of 30 years.

Table 3. Village of Red Hook Population Growth

Table 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population GrowthTable 3. Village of Red Hook Population Growth
Year1970198019902000201020202030204020502060
Village of Red
Hook
Population1,6801,6921,7941,8051,9611,975est.
2,035est.
2,097est.
2,160est.
2,225
% Change-0.7%6.0%0.6%8.6%0.7%est. 3%est. 3%est. 3%est. 3%
Town of Red
Hook
Population7,5488,3519,56510,40811,3199,953est.
10,551est.
11,184est.
11,855est.
12,566
% Change-10.6%14.5%8.8%8.8%-12.1%est. 6%est. 6%est. 6%est. 6%
Dutchess
County
Population222,295245,055259,462280,150297,488295,911est.
313,666est.
332,486est.
352,435est.
373,581
% Change-10.2%5.9%8.0%6.2%-0.5%est. 6%est. 6%est. 6%est. 6%

The sewer system does not serve the entire Village. There are currently 150 sewer hook-ups, which include 127 developed properties and 15 undeveloped properties. A map of the

14

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

current sewer service area is included above ( Figure 1 ). The project proposed herein would expand on the existing sewer service area and increase treatment capacity at the WWTP.

Anderson Commons Development: The Anderson Commons project has been in development for about 10 years. It includes 51 residences and one commercial building. The residences would include a mix of multifamily and single-family homes on traditional lots. The area is located in the southeastern corner of the Village, below Fisk Street. Any plans for development will be subject to review by the Village Planning Board. Population growth has been estimated for the Anderson Commons Development and is shown in the table below.

Table 4. Anderson Commons Population Growth

Table 4. Anderson Commons Population GrowthTable 4. Anderson Commons Population GrowthTable 4. Anderson Commons Population Growth
No.Type**Population Estimate1 **
12-Bedroom Apartment3
442-Bedroom Townhome104
1Single Family Residence (3 Bedrooms)3
1Single Family Residence (4 Bedrooms)3
Total Estimated Population Growth =113

1.Assumes average household size of 2.36 persons for the Village of Red Hook

38 Cookingham Lane Development: This parcel has been cleared for the development of much needed affordable housing. About 90% of the land will be set aside into a conservation easement. Around 12 acres will be set aside for a 40-unit affordable/workforce housing development. This land will be purchased by a private developer. Any plans for development will be subject to review by the Village Planning Board. Population growth has been estimated for the Cookingham Lane Development and is shown in the table below.

Table 5. Cookingham Lane Population GrowthTable 5. Cookingham Lane Population GrowthTable 5. Cookingham Lane Population Growth
No.TypePopulation Estimate1
40Affordable Housing Units95
Total Estimated Population Growth =95
  • 1.Assumes average household size of 2.36 persons for the Village of Red Hook

Ross Development: This infill development project is anticipated to create 40 market rate apartment units.

15

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.3 EXISTING FACILITIES AND PRESENT CONDITION

2.3.1 General Description and History of Major System Components

WWTP: The original WWTP was built in 2006 to serve the Red Hook Commons, a senior housing complex, located within the Village. The original plant was a 25,000 gpd package activated sludge plant with flow equalization, sand filtration and UV disinfection, although, it was only treating between 6,000 to 13,000 gpd. The original WWTP still serves Red Hook Commons and only receives flow from Red Hook Commons. The WWTP is operated by C3ND Enviro Inc., a third-party operating company.

During evaluations of the original WWTP, it was found that treatment is inefficient and although it is only 18 years old, many of the processes and equipment do not work to the fullest extent and most have reached the end of their useful life early. The following deficiencies have been noted:

  • Sand filters are original and need to be re-built or rehabbed. The sand media has reached the end of its useful life. The underdrains no longer drain properly.

  • One of the two aeration trains has a dead spot in the corner. The diffusers have reached the end of their useful life and require replacement.

  • The equalization pumps clog with rags frequently.

  • Grease build-up is often found at the pump station and there are no mixers or other equipment employed to eradicate the problem. Grease build-up interferes with the floats.

  • The anoxic tank mixers have been out of service for at least 10 years. Currently, potable/movable mixers are used.

  • Neighboring property owners complain about sewage odors from the WWTP parcel. Mitigation may be needed at the outfall and surrounding area.

==> picture [366 x 160] intentionally omitted <==

Figure 6. SPDES Permit Process Flow Diagram (applies to both existing WWTPs)

16

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The 10-acre WWTP parcel was purchased/conveyed by/to the Village in 2018 and a 50,000 gpd activated sludge package plant was added to the site, directly adjacent to the original WWTP. The WWTP currently meets all regulatory requirements and design standards. This WWTP appears to be functioning well. The newer 50,000 gpd WWTP contains the following:

  • Flow Meter

  • EQ Tank

  • Surge Tank

  • Extended Air Activated Sludge Treatment

  • Secondary Clarification

  • Sand Filtration Treatment

  • UV Disinfection

  • Sludge Holding Tank

  • Back-Up Generator

  • Odor Control

==> picture [471 x 306] intentionally omitted <==

Figure 7. WWTP Design Drawings

17

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

Because the collection system is a septic tank effluent pump (STEP) low pressure sewer system, there is no need for headworks or primary treatment at the WWTP. Both WWTPs are currently in service and discharge to the same Outfall (001).

Sanitary Sewer Collection System: There are currently 150 sewer hook-ups, which include 127 developed properties and 15 undeveloped properties. The sanitary sewer collection system is a STEP low pressure sewer system. Each customer has a separate septic tank with pump and individual electric service. The tanks collect solids while the liquid waste is pumped into the sewer main and eventually ends up at the WWTP. Small diameter HDPE force main piping is installed at each site and throughout the Village.

The septic tanks are pumped out on a regular basis by a private sludge hauler, coordinated and paid for by the Village. The Village owns all the infrastructure and holds an easement for maintenance of each septic tank and grease trap.

The STEP system was designed to accommodate the current service area with the ability for expansion to the rest of the Village in the future. Village restaurants also have grease traps to intercept cooking grease from entering the STEP system.

==> picture [222 x 166] intentionally omitted <==

==> picture [224 x 166] intentionally omitted <==

Figure 8. Pictures of STEP Tank and Electric Panel (Source: Red Hook STEP Poster/Flyer)

The Red Hook Commons, part of the original private sewer service area, is connected to the WWTP via gravity sewers and does not contain STEP systems or force mains. All flow from this community enters a pump station that serves as the influent pump station to the WWTP. This area discharges to the original 25,000 gpd WWTP.

18

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.3.2 Significant Operations, and Maintenance History and Preventative Maintenance History

The original 25,000 gpd package plant has deteriorated and causes significant operational issues. The maintenance issues with the sand filter, pumps, mixers, and diffusers are beyond repair and need to be replaced.

2.3.3 Failure History and Component Limitations

The system has troubles meeting its ammonia limits on occasion. Because of this, the SPDES permit required a performance evaluation that addresses the ammonia removals.

2.3.4 Ability to Meet Current Design Standards for Treatment

The existing treatment plant needs to be upgraded to reliably meet its discharge limits. The ammonia limits are a particular issue. Oder complaints are also an issue.

The flow capacity of the treatment plant has also exceeded 90% of the design flow on various months. Since the plant has reached this threshold number and additional infill development is occurring, a capacity upgrade is needed.

2.3.5 Planned, Current, or Future Improvements Outside Project Scope

This project is Phase 2 of the Village’s plan to provide sewer service to the whole Village.

2.3.6 Security and Cybersecurity

Not Applicable. There are no security or cyber security concerns for the WWTP or collection at this time, since the WWTP is not connected to the internet.

2.3.7 Hydraulic Capacity Analysis of Existing Sewers where Expansion or

Increased Flow is Proposed

The existing low pressure sewer system was designed for a flow of 50,000 gpd but is readily expandable for this next phase of the project. The collection system consists of a network of low pressure 2-inch, 3-inch, and 4-inch mains that ultimately connect to a common 6- inch that reaches the WWTP. The network is expandable and additional 6-inch mains can be connected to the WWTP as part of this and future phases.

19

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

A Preliminary Hydraulic Grade Line Analysis of the sewer system was performed in 2021 and is attached to this report ( Appendix E ). The analysis included current flows and future flows.

2.3.8 Current or Future Projects on the Same Site

This project is Phase 2 of the Village’s WWTP and sewer collection system. Ultimately, the WWTP site will be expanded to treat the flows from the whole Village.

2.3.9 SPDES Permit Conditions and Effluent Discharge Limits

The WWTP is governed by SPDES Permit NY0271420 ( Appendix F ). Historic and Current Permit limits are summarized in the tables below. The WWTP discharges to a tributary of the Saw Kill. The facility is permitted to discharge 75,000 gpd via Outfall 001, which is divided in subOutfalls 01A (50,000 gpd) and 01B (25,000 gpd). Effluent disinfection has been required all year at this facility. There are currently no phosphorus limits.

Table 6. SPDES Effluent Discharge Limits

Table 6. SPDES Effluent Discharge LimitsTable 6. SPDES Effluent Discharge LimitsTable 6. SPDES Effluent Discharge Limits
ParameterOutfall 01AOutfall 01B
Flow50,000gpd25,000gpd
BOD5
(June 1 - Oct 31)
5 mg/l
Ultimate Oxygen Demand (UOD)
(Nov 1 - May 31)
34 mg/l
Total Suspended Solids(TSS)10 mg/l
Ammonia (as N) (June 1 - Oct 31)0.98 mg/l
Ammonia (as N) (Nov 1 - May 31)1.81 mg/l
Dissolved Oxygen7 mg/l
pH6.5-8.5
Settleable Solids0.1 ml/l
Temperature70 Deg F
Fecal Coliform,
30-day Geometric mean200 No./100 ml
Fecal Coliform,
7-day Geometric mean400 No./100 ml
Chlorine, Total Residual0.3 mg/l

20

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.3.10 Publicly Owned Sewer System Identification Number

The Publicly Owned Sewer System (POSS) number for the Village of Red Hook is NY0027073 (NYCDEP).

2.3.11 Documented Compliance Issues

Because of the dense development within the Village and the presence of substandard seepage pits and septic systems, the Village’s water supply is at risk of contamination.

There are some documented compliance issues associated with the WWTP due to mechanical failures, which have caused exceedance of its ammonia limits.

2.3.12 Design Flows and Waste Loads

The WWTP discharges to a tributary of the Saw Kill. The facility is permitted to discharge 75,000 gpd via Outfall 001, which is divided in sub outfalls 01A (50,000 gpd) and 01B (25,000 gpd). Effluent disinfection has been required all year at this facility.

2.3.13 Analyses of Production Rates for Processing or Manufacturing Operations

Not Applicable.

2.3.14 Existing Energy Consumption

Energy audits are not available at this time.

2.3.15 Photographs

Photographs of the current facilities are included in Appendix G .

2.3.16 History of Damage due to Storm or Flood Impacts

There has been no damage to the system due to storm or flood impacts. The facility is located outside of flood-prone areas. The STEP sewer collection system and proposed service areas are also located outside of flood-prone areas.

21

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

2.4 DEFINITION OF THE PROBLEM & NEED FOR THE PROJECT

2.4.1 Health, Sanitation, Security and Cybersecurity

The Village of Red Hook water system sources water from a shallow unconfined gravel aquifer and a deeper bedrock aquifer underlying the unconfined system. Because of the very dense development found throughout the Village, failing and substandard septic systems can be a very large threat to groundwater quality as they can introduce nitrates, viruses and bacteria into local waterways. Some of the buildings in the Village core business district are served by seepage pits only.

In order to protect the drinking water supply further, a sanitary sewer collection system was established. Phase 1 of the plan to eliminate the failing septic systems was completed in 2023 and it provides municipal sewers to the core center of the Village. Now, the Village is proposing to proceed with Phase 2 of the sewer project and provide sewer service to additional areas.

Additionally, the flow capacity of the WWTP that was constructed in Phase 1 has reached its limits due to infill development. Additional treatment capacity is needed to prevent discharge violations and water quality issues in the receiving stream.

The original 25,000 gpd package treatment plant built in 2006 has reached the end of its useful life and replacement or significant repair is needed to prevent discharge violations and water quality issues in the receiving stream.

2.4.2 Short-term Asset Needs as supported by a Capital Improvement Plan or Asset Management Plan

Not Applicable.

2.4.3 Aging Infrastructure

The original WWTP was built in 2006 and the new WWTP was built in 2023. The original WWTP has reached the end of its useful life. It has many mechanical components that are not functioning such as pumps, mixers and diffusers. The 2023 WWTP does not have any mechanical deficiencies, however, it is at its flow capacity.

22

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The existing septic systems and seepage pits throughout the Village (located outside of the current sewer service area) are over 50-years old and were built before the modern standards for on-site subsurface systems. Many systems are seepage pits without any septic tank or leach fields.

2.4.4 Need for Redundancy

The WWTP does not have the required redundancy. The original WWTP is at capacity and the plant needs some additional treatment units for redundancy.

2.4.5 Infiltration and Inflow, CSOs and SSOs

Not Applicable. The sewer system is new and there are no CSOs or SSOs. There is limited infiltration and inflow (I&I) within the system. Rain gutters and storm drains are prohibited by Village Ordinance from being connected to any STEP systems within the service area as these connections reduce the tank capacity as well as a capacity of the collection system and WWTP.

2.4.6 Reasonable Growth

As shown in section 2.2.4 above, the population of the Village, Town and County as a whole has been increasing steadily. three new developments could add over 300 persons to the already growing population. Only a portion of the Village is currently sewered and the long-term plan is to provide sewer service to the whole Village.

2.4.7 County-Wide or Regional Planning Efforts

The Joint Town and Village Comprehensive Plan (1969) specifies the extremely serious situation that dense development poses to the environment when it comes to private septic systems. The Comprehensive Plan recommends establishing a sewer district that could serve both the Village and densely developed areas in the Town of Red Hook.

The 2009 Intermunicipal Task Force Centers and Greenspaces report also specifies the need for a municipal sewer system to serve the dense development in Red Hook, discussing the need for sewers in terms of cost effectiveness and economic development.

23

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

In addition, multiple engineering reports and studies have been conducted which all conclude that the Village would benefit from a municipal sewer collection and treatment system.

The Town of Red Hook is concurrently evaluating creating a new sewer district for the developed area adjacent to the Village. From a regional planning perspective, it would be more efficient for their sewer to be connected to the Village’s system and treated at the Village’s WWTP.

2.4.8 Water, Energy and Waste Considerations

No audits are available at this time.

2.4.9 Suitability for Continued Use

The facility is suitable for continued use with the current extent of the service area. If the service area were to expand, the facility would require upgrades to accommodate the increased flows.

2.4.10 Physical Risk due to Climate Change

The facility and site as a whole is not subject to sea level rise, storm surge, potential for flooding impacts or other extreme weather events.

2.4.11 Compliance with Current Standards

The existing septic systems do not comply with current standards for on-site subsurface systems. Most Village septic systems consist of a seepage tank. They do not have septic tanks or leach fields.

The WWTP and service area are in compliance with current standards. The WWTP does not have any of the following: Notice of Violation, Consent Order, Judicial or EPA Orders. All system components are generally suitable for continues use. There have been no instances where sewer users were without sewer service.

24

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The WWTP and collection system have adequate technical, managerial and financial capabilities to provide continued sewer service. A certified wastewater operator is employed to run and maintain the WWTP.

2.5 FINANCIAL STATUS

Most sewer users in the current service area are single family homes. Typical sewer usage for this system is 150 gpd per EDU. Cost per property is based on annual debt service plus operation and maintenance costs to run the system. Sewer bills are sent out quarterly along with the water bills. Current sewer use area fees per parcel and EDU counts are included in Appendix H .

Table 7. Red Hook Typical Sewer User Annual CostsTable 7. Red Hook Typical Sewer User Annual Costs
Debt Service(30-year bond)
Operation & Maintenance
**Total Annual Charge **$716
$311
$1,027

The sewer system is supported by sewer utility bills of the residential and business customers. The 2023/2024 annual budget for the sewer system is included in Appendix I .

Table 8. Red Hook Sewer Fund 2023/2024Table 8. Red Hook Sewer Fund 2023/2024
Revenues 2023/2024
Red Hook Commons Assessment$12,000
Sewer Charges - Capital$211,220
Sewer Charges - Operations$91,745
Interest & Penalties$1,000
Interfund Transfers$25,000
Total Revenues$340,965
Expenses 2023/2024
Admin, Office, Etc.$57,500
SanitarySewer Controls$32,245
Treatment & Disposal$28,000
Debt Principal$211,220
Debt Interest$0
USDA Sewer Reserve$12,000
Total Expenses$340,965

25

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

III. Phase 2 Sewer Service Area

The Phase 2 service area is shown on Figure 9 below. The Phase 2 service area consists of the following land uses:

  • 90 single family homes

  • 48 multi-family homes

  • 22 commercial properties

  • 1 Manufactured housing park

  • 3 infill housing developments

  • Middle School

  • High School

All of these properties have existing water meters. Based on water use, the twelve-month average flow was 26,021 GPD, using January 2022 through June 2024 data. The highest use properties were the High School (1,710 gpd), the Middle School (1,182 gpd), and the Colborn Trailer Park (1,267 gpd).

Based on property class (number of bedrooms, number of apartments, mixed use, etc.) and using the NYSDEC standards for estimating flows, the projected flow is 75,427 gpd.

For the purpose of designing WWTP capacity, which uses the maximum monthly flow, the flow number based on the NYSDEC standards will be used or 75,500 gpd.

Three proposed in-fill housing developments are included in the Phase 2 service area. Their estimated flows are summarized below:

  • Red Hook North Development – 40 units at 12,400 gpd

  • Anderson Commons – 13,700 gpd

  • Ross Development – 40 units at 12,400 gpd

Additionally, the proposed Town of Red Hook sewer district is using a planning number of 50,000 gpd that could be connected to the Village’s WWTP in the future.

Based on the proposed sewer service area and the items noted above, the total future flows are summarized in Table 9 below.

26

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

Table 9. Future Flow ProjectionsTable 9. Future Flow Projections
User/DevelopmentEDUsEstimated Flows(gpd)
Red Hook Commons-25,000
Village ExistingSTEP Service Area(293.9 EDUs)-50,000
Phase 2 STEP Service Area(actual water use 26,000gpd)17375,427
Cookingham Development8312,400
Anderson Commons9113,700
Ross Development8312,400
Village Infill Development6710,000
Subtotal Village-198,927
Contingencyat 20%-39,785
_Total Village _-238,712
Town TND/Development-50,000
Contingencyat 20%-10,000
Total Town-60,000
Total Village and Town497298,712

The existing STEP system was designed with the ability for expansion. New septic tanks will be placed at the locations of the old septic tanks so changes to building plumbing and lateral locations will not be required. Each septic tank requires a pump and electrical service. Grease traps will also be installed depending on the user type. Septic tank technical data sheets are provided in Appendix J .

Sludge disposal will be required and will be the responsibility of the Village. Sludge from the WWTP and septic tanks will be trucked off-site.

Table 10 below shows a summary of the cost estimate for the collection system. Expanded cost estimates for each alternative are included in Appendix K .

Table 10. Collection System Cost Estimate

Table 10. Collection System Cost EstimateTable 10. Collection System Cost Estimate
2026 Construction Costs$8,128,000
Engineering (15%)$1,219,200
Contingency (20%)$1,625,600
Total$10,972,800

27

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

==> picture [408 x 629] intentionally omitted <==

Figure 9. Existing and Proposed Sewer Service Area

28

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

IV. Alternative Analysis

Existing conditions, service life and data review were considered when developing the alternatives described below. Priority was given to components which has the highest potential impact on the WWTP and collection system ability to provide adequate service to existing and future users. Material longevity, process importance, system capacity and cost analyses were considered.

4.1 ALTERNATIVE 1. UPGRADE EXISTING WWTP WITH ADDITIONAL 190,000 GPD MBR

PLANT

4.1.1 Description

Proposed Preliminary Design: Alternative 1 consists of adding one, 190,000 gpd MBR package plant unit with UV and converting the existing 25,000 gpd EA unit (original WWTP serving the Red Hook Commons) into a sludge holding tank. This would allow the Village to treat up to 240,000 gpd. The service area would be as noted in Section III above.

Impact on Existing Facility: The new MBR Package plant and new equalization tank will be located adjacent to the existing 50,000 gpd EA unit on the Village-owned parcel. There is no expected negative impacts on the existing facilities.

Outfall Configuration Concerns: The existing outfall would be increase from 8-inch to 15inch.

Land Requirements: The project will be situated on the 10-acre site that houses the current WWTPs. Expansion of the WWTP will result in some land disturbance. Construction of laterals and collection system pipes and appurtenances will take place in streets, right of ways and previously disturbed areas.

Meeting Discharge Permit Requirements: The new facility will be designed to reliable y meet all discharge permit requirements.

Water and Energy Efficiency Measures: This Alternative is aimed at creating a sustainable system for wastewater conveyance and treatment. The project benefits include considerations for high efficiency systems to mitigate energy use.

29

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

4.1.2 Cost Estimate

Table 11 below shows a summary of the cost estimate for Alternative 1 . Expanded cost estimates for each alternative are included in Appendix K and drawings for each WWTP alternative are included in Appendix L .

Table 11. Alternative 1 Cost EstimateTable 11. Alternative 1 Cost Estimate
2026 Construction Costs$4,090,000
Engineering (15%)$555,000
Contingency (20%)$818,000
Total$5,458,000

4.1.3 Non-Monetary Factors

The elimination of substandard and failing individual septic systems and seepage pits will have profound positive impacts on the PEJA in the Village. Environmental health and safety concerns are much more prominent for low-income, minority and disadvantaged populations.

The lot where the current facilities are located has been studied and is suitable for continued use as a WWTP site. Additionally, there is ample room on the 10-acre parcel for expansion. The parcel has been previously surveyed for wetlands, endangered species and archaeologically significant areas. There is already an existing SPDES Permit for the facility.

It is anticipated that the project will be treated as Type I Action during the SEQR review process and a Coordinated Review will be conducted.

Noise levels may increase during construction, but only during normal business hours. Traffic levels may also increase during construction due to the presence of construction vehicles and equipment.

All WWTPs have the ability to produce odors. The design includes odor control measures to help mitigate impacts from odors.

30

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The project will have a beneficial impact on groundwater. Additional substandard septic systems and seepage pits will be eliminated and replaced by the Village-owned system, ensuring that the community’s water supply is protected.

4.2 ALTERNATIVE 2. UPGRADE EXISTING WWTP WITH ADDITIONAL 250,000 GPD MBR

PLANT

4.2.1 Description

Proposed Preliminary Design: Alternative 2 consists of adding one, 250,000 gpd MBR package plant unit with UV and converting the existing 25,000 gpd EA unit (original WWTP serving the Red Hook Commons) into a sludge holding tank. This would allow the Village to treat up to 300,000 gpd. The service area would be as noted in Section III above plus the flow from the proposed Town of Red Hook Sewer District.

Impact on Existing Facility: The new activated sludge package plant will be located adjacent to the existing WWTPs on the Village-owned parcel. There is no expected negative impacts on the existing facilities.

Outfall Configuration Concerns: The existing outfall would be increase from 8-inch to 15inch.

Land Requirements: The project will be situated on the 10-acre site that houses the current WWTPs. Expansion of the WWTP will result in some land disturbance. Construction of laterals and collection system pipes and appurtenances will take place in streets, right of ways and previously disturbed areas.

Meeting Discharge Permit Requirements: The new facility will be designed to reliable y meet all discharge permit requirements.

Water and Energy Efficiency Measures: This Alternative is aimed at creating a sustainable system for wastewater conveyance and treatment. The project benefits include considerations for high efficiency systems to mitigate energy use.

31

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

4.2.2 Cost Estimate

Table # below shows a summary of the cost estimate for Alternative 2 . Expanded cost estimates for each alternative are included in Appendix K and drawings for each WWTP alternative are included in Appendix L .

Table 12. Alternative 2 Cost Estimate

Table 12. Alternative 2 Cost EstimateTable 12. Alternative 2 Cost Estimate
2026 Construction Costs$6,400,000
Engineering (15%)$850,000
Contingency (20%)$1,280,000
Total$8,530,000

4.2.3 Non-Monetary Factors

The elimination of substandard and failing individual septic systems and seepage pits will have profound positive impacts on the PEJA in the Village. Environmental health and safety concerns are much more prominent for low-income, minority and disadvantaged populations.

The lot where the current facilities are located has been studied and is suitable for continued use as a WWTP site. Additionally, there is ample room on the 10-acre parcel for expansion. The parcel has been previously surveyed for wetlands, endangered species and archaeologically significant areas. There is already an existing SPDES Permit for the facility.

It is anticipated that the project will be treated as Type I Action during the SEQR review process and a Coordinated Review will be conducted.

Noise levels may increase during construction, but only during normal business hours. Traffic levels may also increase during construction due to the presence of construction vehicles and equipment.

All WWTPs have the ability to produce odors. The design includes odor control measures to help mitigate impacts from odors.

32

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The project will have a beneficial impact on groundwater. Additional substandard septic systems and seepage pits will be eliminated and replaced by the Village-owned system, ensuring that the community’s water supply is protected.

4.3 ALTERNATIVE 3. UPGRADE EXISTING WWTP TO FULL BUILD OUT 750,000 GPD MBR

PLANT

4.3.1 Description

Proposed Preliminary Design: Alternative 3 consists of building the WWTP for full build out of the Village and the adjacent Town Sewer District. Adding three, 250,000 gpd MBR package plant units each with UV and converting the existing 25,000 gpd EA unit and the existing 50,000 gpd EA unit into a sludge holding tanks. This would allow the Village to treat up to 750,000 gpd. The service area would be all of the Village plus the proposed adjacent Town Sewer District.

Impact on Existing Facility: There is no expected negative impacts on the existing facilities. Outfall Configuration Concerns: The existing outfall would be increase from 8-inch to 15inch.

Land Requirements: The project will be situated on the 10-acre site that houses the current WWTPs. Expansion of the WWTP will result in some land disturbance. Construction of laterals and collection system pipes and appurtenances will take place in streets, right of ways and previously disturbed areas.

Meeting Discharge Permit Requirements: The new facility will be designed to reliable y meet all discharge permit requirements.

Water and Energy Efficiency Measures: This Alternative is aimed at creating a sustainable system for wastewater conveyance and treatment. The project benefits include considerations for high efficiency systems to mitigate energy use.

33

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

4.3.2 Cost Estimate

Table 13 below shows a summary of the cost estimate for Alternative 3 . Expanded cost estimates for each alternative are included in Appendix K and drawings for each WWTP alternative are included in Appendix L ..

Table 13. Alternative 3 Cost Estimate

Table 13. Alternative 3 Cost EstimateTable 13. Alternative 3 Cost Estimate
2026 Construction Costs$19,199,000
Engineering (15%)$3,000,000
Contingency (20%)$3,839,800
Total$26,038,800

4.3.3 Non-Monetary Factors

The elimination of substandard and failing individual septic systems and seepage pits will have profound positive impacts on the PEJA in the Village. Environmental health and safety concerns are much more prominent for low-income, minority and disadvantaged populations.

The lot where the current facilities are located has been studied and is suitable for continued use as a WWTP site. Additionally, there is ample room on the 10-acre parcel for expansion. The parcel has been previously surveyed for wetlands, endangered species and archaeologically significant areas. There is already an existing SPDES Permit for the facility.

It is anticipated that the project will be treated as Type I Action during the SEQR review process and a Coordinated Review will be conducted.

Noise levels may increase during construction, but only during normal business hours. Traffic levels may also increase during construction due to the presence of construction vehicles and equipment.

All WWTPs have the ability to produce odors. The design includes odor control measures to help mitigate impacts from odors.

34

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

The project will have a beneficial impact on groundwater. Additional substandard septic systems and seepage pits will be eliminated and replaced by the Village-owned system, ensuring that the community’s water supply is protected.

4.4 ALTERNATIVE 4. NO-ACTION ALTERNATIVE

While this Action would not result in a capital project or increased sewer rates, the NoAction Alternative would leave the densely developed areas of the Village vulnerable to septic system and seepage pit failure, which could lead to potable water contamination. The PEJA located within the Village would be particularly impacted by the continued environmental pollution and seepage into the Village’s drinking water source.

The No-Action Alternative does not carry a capital cost, but due to the environmental, health and safety needs, and the desires of the community, this Alternative is not explored further.

4.5 REGIONAL CONSOLIDATION OPPORTUNITIES

By allowing the Town of Red Hook proposed sewer district to connect to the Village WWTP, the two municipalities would be cooperating and consolidating the wastewater treatment for the two communities.

35

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

V. Summary and Comparison of Alternatives

5.1 COMPARISON OF FEASIBLE ALTERNATIVES

There are multiple ways which the overall objective of increased capacity of the WWTP and an expanded sewer service area can be achieved. Below is a summary table of all technically feasible alternatives evaluated in this engineering report, identifying difference, pros and cons and costs.

Table 14. Alternative Analysis
AlternativePros & ConsCost
1. Upgrade Capacity to**Pros:**Expansion of service area and$5.5M
240,000 GPD with MBRdecommissioning of substandard septic tanks and-
-seepage pits; Decommissioning of failing 25,000 GDP-
-WWTP; Increased environmental, health and safety;-
-PEJA population is positively impacted-
-**Cons:**Large capital cost; Increases user rates; Not-
-enough capacity for sewer collection system Phase-
-2 and additional Town users-
2. Upgrade Capacity to**Pros:**Expansion of service area and$8.5M
300,000 GPD with MBRdecommissioning of substandard septic tanks and-
-seepage pits; Decommissioning of failing 25,000 GDP-
-WWTP; Increased environmental, health and safety;-
-PEJA population is positively impacted-
-**Cons:**Large capital cost; Increases user rates; Not-
-enough capacity for sewer collection system Phase-
-2 and additional Town users-
3. Upgrade Capacity to**Pros:**Expansion of service area and$26M
750,000 GPD with MBRdecommissioning of substandard septic tanks and-
Plants, Full Buildoutseepage pits; Decommissioning of failing 25,000 GDP-
-WWTP; Increased environmental, health and safety;-
-Lower cost compared to other treatment options;-
-PEJA population is positively impacted; Only-
-alternative that can meet the capacity needs of the-
-community;-
-**Cons:**Large capital cost; Increases user rates-
4. No-Action Alternative**Pros:**No additional capital costs; User rates do not$0
-increase as a result of additional debt service-
-**Cons:**Upgrades are not realized; Substandard septic-
-tanks and seepage pits continue to pollute the-
-environment and pose health a safety risks; Potable-
-water quality is negatively impacted; PEJA-
-population is negatively impacted-

36

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

5.2 LIFE-CYCLE COST ANALYSIS

A life-cycle cost analysis was performed to better compare the true cost of each viable alternative. Alternative 3 is not viable at this time because of the substantial cost. End user costs were compiled using two scenarios: with and without outside funding. The results are tabulated below.

Table 15. Life Cycle Cost Analysis

Table 15. Life Cycle Cost AnalysisTable 15. Life Cycle Cost AnalysisTable 15. Life Cycle Cost AnalysisTable 15. Life Cycle Cost Analysis
Cost ComponentAlt. 1 240K gpd MBR +
Collection SystemAlt. 2. 300K gpd MBR +
Collection System
ANumber of Existing EDUs294294
BCurrent Charge per EDU$1,027$1,027
CCapital Project Costs$16,430,800$19,502,800
DEstimated Added O&M Costs$33,000$40,000
EYearly Loan Payment (assume
30-year term at 4%)$950,195$1,127,849
FTotal Estimated Annual Cost
(D + E)$983,195$1,167,849
GNo. of EDUs in Phase 2497497
HEstimated Annual Costs per
EDU(F / G)$1,978$2,350
I% of MHI (H / $88,482)2.2%2.7%

VI. Recommended Alternative

6.1 BASIS OF SELECTION

The Village of Red Hook is fortunate to have the asset of a public waste treatment system to support the residents and businesses of the community. The need to upgrade the WWTP is evident due to the environmental health and safety concerns related to failing and substandard septic tanks and seepage pits located throughout the Village. This report evaluated alternatives for upgrading the existing WWTP to increase flows and expand the userbase.

After an extensive alternative analysis, Alternative 2 has been selected as the preferred alternative for WWTP upgrades. It meet the current operational and regulatory needs of the community and provides the most value in terms of regulatory compliance, operational efficiency, growth and longevity. This alternative is readily implementable and

37

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

utilizes common construction equipment, techniques and technologies. Appendix M depicts an overall map for the Recommended Alternative.

The proposed project is aimed at creating a sustainable system for wastewater conveyance and treatment. The project benefits include considerations for high efficiency systems to mitigate energy use. Moreover, sustainability for sewer treatment is only achievable if costs to users are affordable.

6.2 COST ESTIMATE

While the costs of investing in a project can be daunting, these costs should be kept in perspective and weighed against long-term operating costs and the sustainability of both the sanitary sewer system and the public water system. The recommended project costs are summarized in the table below. These recommended upgrades satisfy all of the immediate needs while remaining cost effective.

Table 16. Recommended Alternatives Cost Estimate

Table 16. Recommended Alternatives Cost EstimateTable 16. Recommended Alternatives Cost Estimate
MBR WWTP 2026 Costs$8,530,000
Expanded Service Area 2026 Costs$10,972,800
Total Project Costs$19,502,800

6.3 PROJECT SCHEDULE AND NEXT STEPS

The timeline below summarizes the action dates for the identified recommendations:

Evaluation of Sewer System and Service Area ........................................................ March 2024
Final Engineering Report ............................................................................................. June 2024
SEQR & SHPO ................................................................................................................ July 2024
Bond Resolution ..................................................................................................... October 2024
Submit WIIA Grant Application ................................................................................... June 2025
CFA Grant Applications, as applicable ................................................................. July 2024/25
Design ............................................................................................... January 2025 to Feb. 2026
Permitting & Regulatory Review ............................................................ Sept 2025 to May 2026
Initiation of Construction ............................................................................................. June 2026
Final Completion & Start-Up .............................................................................. December 2028

This engineering report is being prepared for the submission to the NYSEFC for listing on the 2025 Intended Use Plan (IUP).

38

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

6.4 ENVIRONMENTAL REVIEW, PERMITS AND APPROVALS

It is anticipated that the proposed project will be a Type I Action under SEQR and the Village will act as Lead Agency in a coordinated review. SEQR has already been conducted for the 2016 WWTP and collection system project.

Environmental review is an exercise in balancing the realities of the need for capital construction projects to meet the demands of aging infrastructure, regulatory requirements and economic investments against potential consequences of the project’s construction and operation. Given the circumstances, the project evaluated throughout this report offers a reasonable range of practicable mitigation measures that when implemented, will reduce or eliminate negative potential environmental impacts.

A project such as this may require multiple permits and approvals from various involved agencies. The permits and approvals that are anticipated for the proposed action are listed in the table below.

Table 17. Permits and Approvals

Table 17. Permits and ApprovalsTable 17. Permits and Approvals
ActivityPermitting Agency
SPDES Modification for New Unit ProcessesNYSDEC
SWPPP for Construction Stormwater DischargesNYSDEC
Part 750 Engineering Report and Plan ApprovalNYSDEC
Applications for Grants and FinancingNYSEFC, DEC, DOS, ESD

VII. Engineering Report Certification

During the preparation of this Engineering Report, Delaware Engineering, DPC, studied and evaluated the cost and effectiveness of the processes, materials, techniques, and technologies for carrying out the proposed project. This Engineering Report has been signed and sealed by a professional engineer licensed to practice engineering in the state of New York. A signed Engineering Report Certification included with this report ( Appendix N ). The following standards were used where practical and appropriate:

  1. Recommended Standards for Wastewater Facilities – Policies for the Design, Review, and Approval of Plans and Specifications for Wastewater Collection and Treatment Facilities (AKA 10 State Standards)

39

Delaware Engineering, D.P.C.

Village of Red Hook WWTP Upgrade and step sewer system Phase 2

Preliminary Engineering Report

  1. Recommended Standards for Water Works

  2. TR-16 Guides for the Design of Wastewater Treatment Works – New England Interstate Water Pollution Control Commission

  3. New York State Stormwater Management Design Manual

  4. New York State Design Standards for Intermediate Sized Wastewater Treatment Systems Statewide and Lake George Design Standards

  5. New York State Flood Risk Management Guidance for Implementation of the Community Risk and Resiliency Act

  6. American Water Works Association Manual M6, Water Meters – Selection, Installation, Testing, and Maintenance, Fifth Edition

  7. 6 NYCRR Part 750 2.10

  8. NYSEFC/NYSDEC Engineering Report Outline Appendix D: Additional Considerations for Specific Technologies and Project Types

VIII. Smart Growth

The proposed project will comply with the New York State Smart Growth Public Infrastructure Policy Act to the extent practicable. The project will use, maintain and improve existing infrastructure. While the need to upgrade the WWTP is evident due to the age of the facility and the state of deterioration, technologies and approaches to upgrade the treatment system are widely available. The project will upgrade, reuse and replace various components of the WWTP and incorporate best available technology and energy conservation practices.

40

Delaware Engineering, D.P.C.

Appendix A NRCS Soil Reports

==> picture [37 x 25] intentionally omitted <==

United States Department of Agriculture

==> picture [54 x 24] intentionally omitted <==

Natural Resources Conservation Service

A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants

Custom Soil Resource

Report for Dutchess County, New York

Village of Red Hook WWTP

==> picture [470 x 361] intentionally omitted <==

February 9, 2024

Preface

Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment.

Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations.

Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951).

Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations.

The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey.

Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information.

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require

2

alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

3

Contents

Preface .................................................................................................................... 2 How Soil Surveys Are Made ..................................................................................5 Soil Map .................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................ 11 Map Unit Descriptions.........................................................................................11 Dutchess County, New York............................................................................13 Ca—Canandaigua silt loam, neutral substratum.........................................13 Hf—Haven-Urban land complex..................................................................14 References ............................................................................................................16

4

How Soil Surveys Are Made

Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity.

Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA.

The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape.

Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries.

Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil

5

Custom Soil Resource Report

scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research.

The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas.

Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape.

Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties.

While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil.

Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date.

After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and

6

Custom Soil Resource Report

identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately.

7

Soil Map

The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit.

8

==> picture [715 x 535] intentionally omitted <==

----- Start of picture text -----

Custom Soil Resource Report Soil Map 592280 592320 592360 592400 592440 592480 592520 592560 592600 592640 41° 59' 35'' N 41° 59' 35'' N Soil Map may not be valid at this scale. 41° 59' 27'' N 41° 59' 27'' N 592280 592320 592360 592400 592440 592480 592520 592560 592600 592640 Map Scale: 1:1,770 if printed on A landscape (11" x 8.5") sheet. Meters N 0 25 50 100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 73° 53' 9'' W 73° 52' 53'' W 4649610 4649610 4649570 4649570 4649530 4649530 4649490 4649490 4649450 4649450 4649410 4649410 4649370 4649370 73° 53' 9'' W 73° 52' 53'' W ----- End of picture text -----

Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84

9

Custom Soil Resource Report

MAP LEGEND

Area of Interest (AOI)Area of Interest (AOI)Spoil Area
Area of Interest (AOI)Stony Spot
SoilsSoil Map Unit PolygonsVery Stony Spot
Wet Spot
Soil Map Unit Lines
Soil Map Unit PointsOther
Special Line Features
Special Point Features
BlowoutWater Features
Streams and Canals
Borrow Pit
Clay SpotTransportation
Rails
Closed Depression
Gravel PitInterstate Highways
US Routes
Gravelly SpotMajor Roads
LandfillLocal Roads
Lava FlowBackground
Marsh or swampAerial Photography
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot

MAP INFORMATION

The soil surveys that comprise your AOI were mapped at 1:24,000.

Warning: Soil Map may not be valid at this scale.

Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.

Please rely on the bar scale on each map sheet for map measurements.

Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857)

Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: Dutchess County, New York Survey Area Data: Version 20, Sep 5, 2023

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Date(s) aerial images were photographed: Oct 21, 2022—Oct 27, 2022

The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

10

Custom Soil Resource Report

Map Unit Legend

Map Unit SymbolMap Unit NameAcres in AOIPercent of AOI
CaCanandaigua silt loam, neutral
substratum4.856.7%
HfHaven-Urban land complex3.643.3%
Totals for Area of Interest8.4100.0%

Map Unit Descriptions

The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit.

A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils.

Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape.

The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however,

11

Custom Soil Resource Report

onsite investigation is needed to define and locate the soils and miscellaneous areas.

An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities.

Soils that have profiles that are almost alike make up a soil series . Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement.

Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases . Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.

Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups.

A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.

An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.

An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.

Some surveys include miscellaneous areas . Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example.

12

Custom Soil Resource Report

Dutchess County, New York

Ca—Canandaigua silt loam, neutral substratum

Map Unit Setting

National map unit symbol: 9rds Elevation: 100 to 1,200 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Farmland of statewide importance

Map Unit Composition

Canandaigua and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Canandaigua

Setting

Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Parent material: Silty and clayey glaciolacustrine deposits

Typical profile

H1 - 0 to 6 inches: silt loam H2 - 6 to 40 inches: silt loam H3 - 40 to 72 inches: silt loam

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: About 0 inches Frequency of flooding: None Frequency of ponding: Frequent Calcium carbonate, maximum content: 1 percent Available water supply, 0 to 60 inches: High (about 12.0 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: C/D Ecological site: F101XY010NY - Wet Lake Plain Depression Hydric soil rating: Yes

Minor Components

Sun

Percent of map unit: 5 percent Landform: Depressions

13

Custom Soil Resource Report

Hydric soil rating: Yes

Raynham

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Livingston

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Kingsbury

Percent of map unit: 3 percent Hydric soil rating: No

Punsit

Percent of map unit: 2 percent Hydric soil rating: No

Hf—Haven-Urban land complex

Map Unit Setting

National map unit symbol: 9rgc Elevation: 160 to 230 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Haven and similar soils: 40 percent Urban land: 35 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Haven

Setting

Landform: Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex

Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 12 inches: loam H2 - 12 to 23 inches: gravelly loam

H3 - 23 to 72 inches: stratified very gravelly sand

14

Custom Soil Resource Report

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.2 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Ecological site: F144AY023CT - Well Drained Outwash Hydric soil rating: No

Description of Urban Land

Typical profile

H1 - 0 to 6 inches: variable

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: Unranked

Minor Components

Udorthents

Percent of map unit: 10 percent Hydric soil rating: No

Hoosic

Percent of map unit: 5 percent Hydric soil rating: No

Knickerbocker

Percent of map unit: 5 percent Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

15

References

American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition.

American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00.

Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31.

Federal Register. July 13, 1994. Changes in hydric soils of the United States.

Federal Register. September 18, 2002. Hydric soils of the United States.

Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States.

National Research Council. 1995. Wetlands: Characteristics and boundaries.

Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262

Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577

Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580

Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section.

United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1.

United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374

United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084

16

Custom Soil Resource Report

United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242

United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624

United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf

17

==> picture [37 x 25] intentionally omitted <==

United States Department of Agriculture

==> picture [54 x 24] intentionally omitted <==

Natural Resources Conservation Service

A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants

Custom Soil Resource

Report for Dutchess County, New York

Village of Red Hook

==> picture [470 x 361] intentionally omitted <==

February 9, 2024

Preface

Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment.

Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations.

Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951).

Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations.

The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey.

Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information.

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require

2

alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

3

Contents

Preface .................................................................................................................... 2 How Soil Surveys Are Made ..................................................................................5 Soil Map .................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................ 11 Map Unit Descriptions.........................................................................................11 Dutchess County, New York............................................................................14 Ca—Canandaigua silt loam, neutral substratum.........................................14 DwB—Dutchess-Cardigan complex, undulating, rocky...............................15 Fr—Fredon silt loam....................................................................................17 Ha—Halsey mucky silt loam........................................................................18 HeA—Haven loam, nearly level.................................................................. 20 HeB—Haven loam, undulating....................................................................21 Hf—Haven-Urban land complex..................................................................22 HsA—Hoosic gravelly loam, nearly level.....................................................24 HsB—Hoosic gravelly loam, undulating...................................................... 25 NwC—Nassau-Cardigan complex, rolling, very rocky.................................27 NwD—Nassau-Cardigan complex, hilly, very rocky.................................... 29 W—Water....................................................................................................31 Wy—Wayland silt loam................................................................................31 References ............................................................................................................33

4

How Soil Surveys Are Made

Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity.

Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA.

The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape.

Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries.

Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil

5

Custom Soil Resource Report

scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research.

The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas.

Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape.

Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties.

While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil.

Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date.

After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and

6

Custom Soil Resource Report

identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately.

7

Soil Map

The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit.

8

==> picture [535 x 726] intentionally omitted <==

----- Start of picture text -----

Custom Soil Resource Report Soil Map 592000 592300 592600 592900 593200 593500 593800 594100 42° 0' 32'' N 42° 0' 32'' N 41° 58' 54'' N 41° 58' 54'' N 592000 592300 592600 592900 593200 593500 593800 594100 Map Scale: 1:14,900 if printed on A portrait (8.5" x 11") sheet. Meters N 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 9 73° 53' 25'' W 73° 51' 45'' W 4651400 4651100 4651100 4650800 4650800 4650500 4650500 4650200 4650200 4649900 4649900 4649600 4649600 4649300 4649300 4649000 4649000 4648700 4648700 4648400 4648400 73° 53' 25'' W 73° 51' 45'' W ----- End of picture text -----

Custom Soil Resource Report

MAP LEGEND

Area of Interest (AOI)Area of Interest (AOI)Spoil Area
Area of Interest (AOI)Stony Spot
SoilsVery Stony Spot
Soil Map Unit PolygonsWet Spot
Soil Map Unit Lines
Other
Soil Map Unit Points
Special Point FeaturesSpecial Line Features
BlowoutWater Features
Streams and Canals
Borrow Pit
Clay SpotTransportation
Rails
Closed DepressionInterstate Highways
Gravel PitUS Routes
Gravelly SpotMajor Roads
LandfillLocal Roads
Lava FlowBackground
Marsh or swampAerial Photography
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot

MAP INFORMATION

The soil surveys that comprise your AOI were mapped at 1:24,000.

Please rely on the bar scale on each map sheet for map measurements.

Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857)

Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: Dutchess County, New York Survey Area Data: Version 20, Sep 5, 2023

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Date(s) aerial images were photographed: Oct 21, 2022—Oct 27, 2022

The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

10

Custom Soil Resource Report

Map Unit Legend

Map Unit SymbolMap Unit NameAcres in AOIPercent of AOI
CaCanandaigua silt loam, neutral
substratum17.92.6%
DwBDutchess-Cardigan complex,
undulating, rocky57.78.5%
FrFredon silt loam6.71.0%
HaHalsey mucky silt loam27.64.0%
HeAHaven loam, nearly level182.126.7%
HeBHaven loam, undulating29.14.3%
HfHaven-Urban land complex291.342.6%
HsAHoosic gravelly loam, nearly
level13.11.9%
HsBHoosic gravelly loam,
undulating23.43.4%
NwCNassau-Cardigan complex,
rolling, very rocky7.91.2%
NwDNassau-Cardigan complex,
hilly, very rocky5.40.8%
WWater5.50.8%
WyWayland silt loam15.62.3%
Totals for Area of Interest683.3100.0%

Map Unit Descriptions

The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit.

A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils.

Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a

11

Custom Soil Resource Report

particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape.

The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas.

An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities.

Soils that have profiles that are almost alike make up a soil series . Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement.

Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases . Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.

Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups.

A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.

An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.

An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.

12

Custom Soil Resource Report

Some surveys include miscellaneous areas . Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example.

13

Custom Soil Resource Report

Dutchess County, New York

Ca—Canandaigua silt loam, neutral substratum

Map Unit Setting

National map unit symbol: 9rds Elevation: 100 to 1,200 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Farmland of statewide importance

Map Unit Composition

Canandaigua and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Canandaigua

Setting

Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Parent material: Silty and clayey glaciolacustrine deposits

Typical profile

H1 - 0 to 6 inches: silt loam H2 - 6 to 40 inches: silt loam H3 - 40 to 72 inches: silt loam

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: About 0 inches Frequency of flooding: None Frequency of ponding: Frequent Calcium carbonate, maximum content: 1 percent Available water supply, 0 to 60 inches: High (about 12.0 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: C/D Ecological site: F101XY010NY - Wet Lake Plain Depression Hydric soil rating: Yes

Minor Components

Sun

Percent of map unit: 5 percent Landform: Depressions

14

Custom Soil Resource Report

Hydric soil rating: Yes

Raynham

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Livingston

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Kingsbury

Percent of map unit: 3 percent Hydric soil rating: No

Punsit

Percent of map unit: 2 percent Hydric soil rating: No

DwB—Dutchess-Cardigan complex, undulating, rocky

Map Unit Setting

National map unit symbol: 9rfn Elevation: 0 to 1,330 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: All areas are prime farmland

Map Unit Composition

Dutchess and similar soils: 40 percent Cardigan and similar soils: 30 percent Minor components: 30 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Dutchess

Setting

Landform: Ridges, hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy till derived mainly from phyllite, slate, schist, and shale

Typical profile

H1 - 0 to 8 inches: silt loam H2 - 8 to 28 inches: silt loam H3 - 28 to 86 inches: channery silt loam

15

Custom Soil Resource Report

Properties and qualities

Slope: 1 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 9.6 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F144AY034CT - Well Drained Till Uplands Hydric soil rating: No

Description of Cardigan

Setting

Landform: Ridges, hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy till or colluvium derived from phyllite, slate, shale, and schist

Typical profile

H1 - 0 to 8 inches: channery silt loam H2 - 8 to 20 inches: channery loam H3 - 20 to 30 inches: channery silt loam H4 - 30 to 34 inches: unweathered bedrock

Properties and qualities

Slope: 1 to 6 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F144AY034CT - Well Drained Till Uplands Hydric soil rating: No

Minor Components

Georgia

Percent of map unit: 10 percent

16

Custom Soil Resource Report

Hydric soil rating: No

Massena

Percent of map unit: 9 percent Hydric soil rating: No

Nassau

Percent of map unit: 9 percent Hydric soil rating: No

Sun

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

Rock outcrop

Percent of map unit: 1 percent Hydric soil rating: Unranked

Fr—Fredon silt loam

Map Unit Setting

National map unit symbol: 9rfz Elevation: 250 to 1,200 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Prime farmland if drained

Map Unit Composition

Fredon and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Fredon

Setting

Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Parent material: Loamy over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 9 inches: silt loam H2 - 9 to 31 inches: very fine sandy loam H3 - 31 to 70 inches: stratified very gravelly sand to loamy fine sand

Properties and qualities

Slope: 0 to 3 percent

17

Custom Soil Resource Report

Depth to restrictive feature: More than 80 inches Drainage class: Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.20 to 1.98 in/hr) Depth to water table: About 6 to 18 inches Frequency of flooding: Rare Frequency of ponding: None Calcium carbonate, maximum content: 15 percent Available water supply, 0 to 60 inches: Moderate (about 6.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: B/D Ecological site: F144AY029NY - Semi-Rich Wet Outwash Hydric soil rating: No

Minor Components

Fredon, poorly drained

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Unnamed soils, glacial outwash

Percent of map unit: 5 percent Hydric soil rating: No

Halsey

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: Yes

Ha—Halsey mucky silt loam

Map Unit Setting

National map unit symbol: 9rg8 Elevation: 30 to 930 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Halsey and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

18

Custom Soil Resource Report

Description of Halsey

Setting

Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 9 inches: mucky silt loam H2 - 9 to 33 inches: gravelly loam H3 - 33 to 60 inches: stratified very gravelly loamy sand

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 6 inches Frequency of flooding: Rare Frequency of ponding: None Calcium carbonate, maximum content: 15 percent Available water supply, 0 to 60 inches: Moderate (about 7.2 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: B/D Ecological site: F144AY030NY - Semi-Rich Very Wet Outwash Hydric soil rating: Yes

Minor Components

Fredon

Percent of map unit: 10 percent Landform: Depressions Hydric soil rating: No

Palms

Percent of map unit: 5 percent Landform: Swamps, marshes Hydric soil rating: Yes

Carlisle

Percent of map unit: 5 percent Landform: Marshes, swamps Hydric soil rating: Yes

19

Custom Soil Resource Report

HeA—Haven loam, nearly level

Map Unit Setting

National map unit symbol: 9rg9 Elevation: 80 to 410 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: All areas are prime farmland

Map Unit Composition

Haven and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Haven

Setting

Landform: Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex

Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 12 inches: loam H2 - 12 to 23 inches: gravelly loam H3 - 23 to 72 inches: stratified very gravelly sand

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.2 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Ecological site: F144AY023CT - Well Drained Outwash Hydric soil rating: No

20

Custom Soil Resource Report

Minor Components

Hoosic

Percent of map unit: 5 percent Hydric soil rating: No

Knickerbocker

Percent of map unit: 5 percent Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

HeB—Haven loam, undulating

Map Unit Setting

National map unit symbol: 9rgb Elevation: 50 to 890 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: All areas are prime farmland

Map Unit Composition

Haven and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Haven

Setting

Landform: Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 12 inches: loam H2 - 12 to 23 inches: gravelly loam

H3 - 23 to 72 inches: stratified very gravelly sand

21

Custom Soil Resource Report

Properties and qualities

Slope: 3 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.2 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F144AY023CT - Well Drained Outwash Hydric soil rating: No

Minor Components

Hoosic

Percent of map unit: 5 percent Hydric soil rating: No

Knickerbocker

Percent of map unit: 5 percent Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

Hf—Haven-Urban land complex

Map Unit Setting

National map unit symbol: 9rgc Elevation: 160 to 230 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Haven and similar soils: 40 percent Urban land: 35 percent

22

Custom Soil Resource Report

Minor components: 25 percent

Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Haven

Setting

Landform: Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 12 inches: loam H2 - 12 to 23 inches: gravelly loam H3 - 23 to 72 inches: stratified very gravelly sand

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.2 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Ecological site: F144AY023CT - Well Drained Outwash Hydric soil rating: No

Description of Urban Land

Typical profile

H1 - 0 to 6 inches: variable

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: Unranked

Minor Components

Udorthents

Percent of map unit: 10 percent Hydric soil rating: No

Hoosic

Percent of map unit: 5 percent Hydric soil rating: No

Knickerbocker

Percent of map unit: 5 percent

23

Custom Soil Resource Report

Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

HsA—Hoosic gravelly loam, nearly level

Map Unit Setting

National map unit symbol: 9rgj Elevation: 100 to 1,100 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Farmland of statewide importance

Map Unit Composition

Hoosic and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Hoosic

Setting

Landform: Terraces, outwash plains, deltas Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 9 inches: gravelly loam H2 - 9 to 24 inches: very gravelly sandy loam H3 - 24 to 70 inches: extremely gravelly loamy sand

Properties and qualities

Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water (Ksat): High to very high (1.98 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None

24

Custom Soil Resource Report

Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 3.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No

Minor Components

Haven

Percent of map unit: 5 percent Hydric soil rating: No

Knickerbocker

Percent of map unit: 5 percent Hydric soil rating: No

Copake

Percent of map unit: 5 percent Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

HsB—Hoosic gravelly loam, undulating

Map Unit Setting

National map unit symbol: 9rgk Elevation: 100 to 1,100 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Farmland of statewide importance

Map Unit Composition

Hoosic and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

25

Custom Soil Resource Report

Description of Hoosic

Setting

Landform: Terraces, outwash plains, deltas Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and gravelly glaciofluvial deposits

Typical profile

H1 - 0 to 9 inches: gravelly loam H2 - 9 to 24 inches: very gravelly sandy loam H3 - 24 to 70 inches: extremely gravelly loamy sand

Properties and qualities

Slope: 1 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water (Ksat): High to very high (1.98 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 3.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No

Minor Components

Knickerbocker

Percent of map unit: 5 percent Hydric soil rating: No

Copake

Percent of map unit: 5 percent Hydric soil rating: No

Haven

Percent of map unit: 5 percent Hydric soil rating: No

Fredon

Percent of map unit: 4 percent Landform: Depressions Hydric soil rating: Yes

Halsey

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

26

Custom Soil Resource Report

NwC—Nassau-Cardigan complex, rolling, very rocky

Map Unit Setting

National map unit symbol: 9rhd Elevation: 0 to 1,800 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Nassau and similar soils: 45 percent Cardigan and similar soils: 35 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Nassau

Setting

Landform: Till plains, ridges, benches Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Channery loamy till derived mainly from local slate or shale

Typical profile

H1 - 0 to 5 inches: channery silt loam

H2 - 5 to 16 inches: very channery silt loam

H3 - 16 to 20 inches: unweathered bedrock

Properties and qualities

Slope: 5 to 15 percent Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water (Ksat): Low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Very low (about 1.7 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6s Hydrologic Soil Group: D Ecological site: F144AY033MA - Shallow Dry Till Uplands Hydric soil rating: No

27

Custom Soil Resource Report

Description of Cardigan

Setting

Landform: Ridges, hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy till or colluvium derived from phyllite, slate, shale, and schist

Typical profile

H1 - 0 to 8 inches: channery silt loam H2 - 8 to 20 inches: channery loam H3 - 20 to 30 inches: channery silt loam H4 - 30 to 34 inches: unweathered bedrock

Properties and qualities

Slope: 5 to 15 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6s Hydrologic Soil Group: C Ecological site: F144AY034CT - Well Drained Till Uplands Hydric soil rating: No

Minor Components

Dutchess

Percent of map unit: 9 percent Hydric soil rating: No

Unnamed soils, very shallow

Percent of map unit: 5 percent Hydric soil rating: No

Rock outcrop

Percent of map unit: 5 percent Hydric soil rating: Unranked

Sun

Percent of map unit: 1 percent Landform: Depressions Hydric soil rating: Yes

28

Custom Soil Resource Report

NwD—Nassau-Cardigan complex, hilly, very rocky

Map Unit Setting

National map unit symbol: 9rhf Elevation: 0 to 1,800 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Nassau and similar soils: 45 percent Cardigan and similar soils: 30 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Nassau

Setting

Landform: Till plains, ridges, benches Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Channery loamy till derived mainly from local slate or shale

Typical profile

H1 - 0 to 5 inches: channery silt loam

H2 - 5 to 16 inches: very channery silt loam

H3 - 16 to 20 inches: unweathered bedrock

Properties and qualities

Slope: 15 to 30 percent Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water (Ksat): Low to moderately low (0.00 to 0.06 in/hr)

Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Very low (about 1.7 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7s Hydrologic Soil Group: D Ecological site: F144AY033MA - Shallow Dry Till Uplands Hydric soil rating: No

29

Custom Soil Resource Report

Description of Cardigan

Setting

Landform: Ridges, hills Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy till or colluvium derived from phyllite, slate, shale, and schist

Typical profile

H1 - 0 to 8 inches: channery silt loam

H2 - 8 to 20 inches: channery loam H3 - 20 to 30 inches: channery silt loam H4 - 30 to 34 inches: unweathered bedrock

Properties and qualities

Slope: 15 to 30 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.1 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7s Hydrologic Soil Group: C Ecological site: F144AY034CT - Well Drained Till Uplands Hydric soil rating: No

Minor Components

Dutchess

Percent of map unit: 10 percent Hydric soil rating: No

Sun

Percent of map unit: 10 percent Landform: Depressions Hydric soil rating: Yes

Rock outcrop

Percent of map unit: 5 percent Hydric soil rating: Unranked

30

Custom Soil Resource Report

W—Water

Map Unit Setting

National map unit symbol: 9rjc Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Water: 100 percent

Estimates are based on observations, descriptions, and transects of the mapunit.

Wy—Wayland silt loam

Map Unit Setting

National map unit symbol: 9rjf Elevation: 200 to 1,500 feet Mean annual precipitation: 41 to 47 inches Mean annual air temperature: 45 to 50 degrees F Frost-free period: 115 to 195 days Farmland classification: Not prime farmland

Map Unit Composition

Wayland and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit.

Description of Wayland

Setting

Landform: Flood plains

Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Dip Down-slope shape: Concave Across-slope shape: Concave

Parent material: Silty and clayey alluvium washed from uplands that contain some calcareous drift

Typical profile

H1 - 0 to 9 inches: silt loam

H2 - 9 to 80 inches: silt loam

Properties and qualities

Slope: 0 to 3 percent

31

Custom Soil Resource Report

Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 0 inches Frequency of flooding: Frequent Frequency of ponding: Frequent Calcium carbonate, maximum content: 1 percent Available water supply, 0 to 60 inches: High (about 11.0 inches)

Interpretive groups

Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Ecological site: F144AY016MA - Very Wet Low Floodplain Hydric soil rating: Yes

Minor Components

Linlithgo

Percent of map unit: 5 percent Hydric soil rating: No

Pawling

Percent of map unit: 5 percent Landform: Depressions Hydric soil rating: No

Palms

Percent of map unit: 3 percent Landform: Swamps, marshes Hydric soil rating: Yes

Fluvaquents

Percent of map unit: 3 percent Landform: Flood plains Hydric soil rating: Yes

Carlisle

Percent of map unit: 2 percent Landform: Marshes, swamps Hydric soil rating: Yes

Udifluvents

Percent of map unit: 2 percent Hydric soil rating: No

32

References

American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition.

American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00.

Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31.

Federal Register. July 13, 1994. Changes in hydric soils of the United States.

Federal Register. September 18, 2002. Hydric soils of the United States.

Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States.

National Research Council. 1995. Wetlands: Characteristics and boundaries.

Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262

Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577

Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580

Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section.

United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1.

United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374

United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084

33

Custom Soil Resource Report

United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242

United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624

United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf

34

Appendix B NY Heritage Program

Determination/Environmental Resource Mapper

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION

Division of Fish and Wildlife, New York Heritage Program

625 Broadway, Fi�h Floor, Albany, NY 12233-4757 Phone: (518) 402-8935 | Fax: (518) 402-8925 www.dec.ny.gov

02/09/2024

The a�ached report from the Environmental Resource Mapper includes informa�on from the New York Natural Heritage Program database with respect to the loca�on indicated on the map below. This le�er, together with the a�ached report from the Environmental Resource Mapper, is equivalent to, and carries the same validity, as a le�er from the New York Natural Heritage Program, including for projects where a Natural Heritage le�er is required.

If your loca�on of interest does not fall within an area covered by the Rare Plants and Rare Animals layer or in the Significant Natural Communi�es layer, then New York Natural Heritage has no records to report in the vicinity of your project site. Submi�ng a project screening request to NY Natural Heritage is not necessary.

If the a�ached report lists that your loca�on of interest is in the vicinity of state-listed animals, including state-listed bats, please consult the EAF Mapper to obtain a list of the species involved. (You do not have to be filling out an Environmental Assessment Form in order to use the EAF Mapper). Then consult the appropriate NYSDEC Regional Ofce for informa�on on any project requirements or permit condi�ons.

If the a�ached report lists unlisted animals, rare plants, or significant natural communi�es, and if you would like more informa�on on these, please submit a project screening request to New York Natural Heritage . For more informa�on, please see the DEC webpage Request Natural Heritage Informa�on for Project Screening .

The absence of data does not necessarily mean that rare or state-listed species, significant natural communi�es, or other significant habitats do not exist on or adjacent to the proposed site. Rather, NYNHP files currently do not contain informa�on that indicates their presence. For most sites, comprehensive field surveys have not been conducted. NYNHP cannot provide a defini�ve statement on the presence or absence of all rare or state-listed species or significant natural communi�es. Depending on the nature of the project and the condi�ons at the project site, further informa�on from on-site surveys or other resources may be required to fully assess impacts on biological resources from a proposed project.

This response applies only to known occurrences of rare or state-listed animals and plants, significant natural communi�es, and other significant habitats maintained in the NYNHP database.

New York Natural Heritage Program

h�ps://www.nynhp.org/ .

Environmental Resource Mapper

==> picture [550 x 276] intentionally omitted <==

The coordinates of the point you clicked on are:

UTM 18 Eas�ng: 592457.0518879837 Northing: 4649472.497003812 Longitude/La�tude Longitude: -73.88375820790581 La�tude: 41.991845653808404

The approximate address of the point you clicked on is:

Red Hook, New York

County: Dutchess Town: Red Hook Village: Red Hook USGS Quad: KINGSTON EAST

Freshwater Wetlands Checkzone

This loca�on is in the vicinity of one or more Regulated Freshwater Wetlands.

If your project or ac�on is within or near an area with a rare animal, a permit may be required if the species is listed as endangered or threatened and the department determines the ac�on may be harmful to the species or its habitat.

If your project or ac�on is within or near an area with rare plants and/or significant natural communi�es, the environmental impacts may need to be addressed.

The presence of a unique geological feature or landform near a project, unto itself, does not trigger a requirement for a NYS DEC permit. Readers are advised, however, that there is the chance that a unique feature may also show in another data layer (ie. a wetland) and thus be subject to permit jurisdic�on.

Please refer to the "Need a Permit?" tab for permit informa�on or other authoriza�ons regarding these natural resources.

Disclaimer: If you are considering a project or ac�on in, or near, a wetland or a stream, a NYS DEC permit may be required. The Environmental Resources Mapper does not show all natural resources which are regulated by NYS DEC, and for which permits from NYS DEC are required. For example, Regulated Tidal Wetlands, and Wild, Scenic, and Recrea�onal Rivers, are currently not included on the maps.

Print Preview

Appendix C IPaC Consultation

==> picture [517 x 79] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [111 x 69] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [516 x 147] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [459 x 90] intentionally omitted <==

==> picture [492 x 47] intentionally omitted <==

==> picture [411 x 65] intentionally omitted <==

==> picture [159 x 87] intentionally omitted <==

==> picture [56 x 37] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [112 x 37] intentionally omitted <==

==> picture [508 x 107] intentionally omitted <==

==> picture [48 x 38] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [247 x 88] intentionally omitted <==

==> picture [514 x 183] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [501 x 193] intentionally omitted <==

==> picture [513 x 132] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [333 x 124] intentionally omitted <==

==> picture [74 x 56] intentionally omitted <==

==> picture [189 x 95] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [519 x 151] intentionally omitted <==

==> picture [478 x 174] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [208 x 58] intentionally omitted <==

==> picture [193 x 41] intentionally omitted <==

==> picture [243 x 44] intentionally omitted <==

==> picture [213 x 43] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [221 x 43] intentionally omitted <==

==> picture [181 x 41] intentionally omitted <==

==> picture [514 x 183] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [501 x 193] intentionally omitted <==

==> picture [513 x 132] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [32 x 45] intentionally omitted <==

==> picture [365 x 173] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [503 x 117] intentionally omitted <==

==> picture [517 x 181] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [468 x 110] intentionally omitted <==

==> picture [90 x 61] intentionally omitted <==

==> picture [270 x 63] intentionally omitted <==

==> picture [515 x 169] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [442 x 81] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

==> picture [46 x 69] intentionally omitted <==

==> picture [510 x 184] intentionally omitted <==

==> picture [557 x 358] intentionally omitted <==

Appendix D FEMA Flood Maps

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 5] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 5] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 5] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 14] intentionally omitted <==

==> picture [1224 x 13] intentionally omitted <==

==> picture [1224 x 5] intentionally omitted <==

Appendix E Hydraulic Grade Line Analysis

Preliminary Hydraulic Grade Line Analysis of an Orenco[®] Effluent Sewer S stem y

==> picture [263 x 213] intentionally omitted <==

Project Name Village of Red Hook Red Hook, NY

Prepared for Kathryn Serra, P.E. C.T. Male Associates

Prepared by Garry-Lee Espinosa Orenco Systems, Inc. Date September 13, 2021

==> picture [279 x 82] intentionally omitted <==

Table Of Contents

Table Of Contents ................................................................................................................................. 2 SECTION 1: INTRODUCTION .............................................................................................................. 3 SECTION 2: DESIGN PARAMETERS AND HYDRAULIC MODEL ................................................ 4 Design Assumptions: ..................................................................................................................................... 4 Flow Rate .............................................................................................................................................................................. 4 Head Loss ............................................................................................................................................................................. 4 Velocity .................................................................................................................................................................................. 5 General Comments: ........................................................................................................................................ 5 SECTION 3: ANALYSIS RESULTS ....................................................................................................... 7 Outputs ............................................................................................................................................................... 7 SECTION 4: HYDRAULIC GRADE LINE GRAPHS – CURRENT FLOWS .................................. 13 SECTION 5: HYDRAULIC GRADE LINE GRAPHS – FUTURE FLOWS ..................................... 28

SECTION 1: INTRODUCTION

Small communities are often confronted with major costs to repair or replace wastewater treatment plants or failing septic systems. Traditional technologies such as conventional gravity sewers and activated sludge treatment facilities are generally unaffordable for small communities. Because of their low density and small user base, small communities are unable to afford the high per capita construction costs, nor are they able to pay for the wastewater professionals needed to operate, manage, and update such complex facilities.

This report contains information related to a STEP-STEG (effluent sewer) collection system. STEP-STEG systems use small diameter – typically 2”-4” – pipe that follows the contour of the land, to significantly reduce construction costs.

Unlike conventional approaches, such as gravity or grinder systems, STEP-STEG systems provides a modular solution that can be incrementally installed, resulting in lower up-front capital costs that do not unfairly burden initial users.

With an Orenco Effluent Sewer, raw sewage flows from the building to a watertight underground tank, where primary treatment occurs via settling and natural biological processes. Solids remain in the tank, decreasing in volume, which reduces biosolids treatment costs. Filtered liquid effluent is then discharged (by high-head pump or gravity) through small-diameter service lines to small-diameter collection lines. These service and collection lines are shallowly buried and follow the contour of the land. The entire system is watertight, reducing costs from infiltration. No expensive manholes or lift station are required and energy consumption is minimal.

The specified collection system is an Orenco Effluent Sewer, a technology that the company has been optimizing for more than 25 years. It is the only sewer technology that provides primary treatment.

==> picture [313 x 186] intentionally omitted <==

Figure 1. Typical STEP Systems Components

SECTION 2: DESIGN PARAMETERS AND HYDRAULIC MODEL

The purpose of this analysis is to determine the delivery method (pump or gravity) and line size necessary for a successful STEP-STEG collection system.

Orenco Systems, Inc. (“Orenco”) has received the proposed layout from the designer, flow parameters based on internal assumptions (see below) for the Red Hook project. A preliminary hydraulic grade line (HGL) was produced to analyze the proposed effluent sewer to determine effluent line diameters and pumps/ packages required. Please review the enclosed results to ensure the assumptions and conclusions are accurate.

Design Assumptions:

Flow Rate

A population density of (3.0) capita per EDU has been used in all calculations. Flow rates for each line were determined using the following equation:

==> picture [120 x 30] intentionally omitted <==

Where:

Q = peak flow in gpm. PC = population density per EDU EDU = the number of dwelling units

*15 = the constant to establish a minimum flow rate when number EDUs is < 15

*When the number of EDUs exceeds 50 per line, the constant is no longer used.

Head Loss

The friction head loss calculations were done using HDPE SDR11 pipe with a Hazen-Williams coefficient of 150.

==> picture [131 x 33] intentionally omitted <==

Where:

HL = Head loss due to pipe friction, ft

L = Forcemain line length, ft

d = Inside diameter of pipe, in

Q = Flow rate through forcemain, gpm

Velocity

Since effluent sewers convey effluent and not solid waste, minimum velocities are not required like that of a gravity sewer system. However, many regulatory agencies may require velocity calculations to be included in a design. Velocities were calculated using the following equation:

==> picture [96 x 31] intentionally omitted <==

Where:

V = Velocity in pipe, ft/s

d = Inside diameter of pipe, in

  • Q = Flow rate through pipe, gpm

General Comments:

The line sizes indicated on the graphs have been chosen based upon the use of Orenco’s standard STEP pump, Model PF1005, which will achieve 5-9 gpm at 150 ft of TDH, depending upon whether the 1/4” flow control orifice disk is used. This pump should be adequate for all connections in this system, although this determination should be made after the final site analysis is completed.

Individual interceptor tanks that have a liquid level that remains 2 feet or more above the HGL should work with an effluent filter (no pump is required), while systems that fall below the HGL will require pumping. The HGL will fluctuate with the number of pumps running concurrently, so systems that fall within this range will alternately be above and below the HGL. Any pumping system above the static grade line (typically the highest point within the system) will require anti-siphon valves on their pumping discharge assemblies. The service line between the interceptor tank and the main line should be laid at a constant grade to eliminate high points where gasses may collect.

The following are critical components that ensure a successful effluent sewer system design. They are not included in this analysis, but we recommend that they are incorporated in the design when needed:

  • a) Properly sized and watertight interceptor tanks with effluent filters or screened pumps and control panels

  • b) Service connection assemblies (ball valve and check valve) just off the main lines for all service lines

  • c) Isolation valves and check valves at main line intersections

  • d) Proper cleanout accessibility, including launching ports and catching methods for “pigging” the main lines (especially for construction debris). The exact location and number of automatic air release valve (AARV) assemblies should be analyzed in the field and specified as needed. Manual air release valves could be installed at questionable locations, and replaced later with automatic valves if necessary.

For more information about effluent sewer design, please refer to the Orenco Systems Effluent Sewer Design Manual, which can be found at the Orenco website:

http://www.orenco.com/doclib/documents/nda-efs-1.pdf

SECTION 3: ANALYSIS RESULTS

Outputs

The following tables represents the HDPE SDR 11 line sizes, demand and pump requirements for different sections of pressure sewer pipe.

Table 1. Current Flows HGL Analysis Results

|Pipe ID|Diameter (inches)|Outgoing EDUs|Flow Demand (gpm)|Velocity (ft/s)| |---|---|---|---|---| |A|6|279|*139.5|2.0| |B|4|100|50.0|1.5| |C|2|16|23.0|2.6| |D|4|42|36.0|1.1| |E|2|12|21.0|2.3| |F|3|30|30.0|1.5| |G|4|179|89.5|2.8| |H|2|22|26.0|2.6| |I|4|157|78.5|2.4| |J|3|128|64.0|3.3| |K|3|98|49.0|2.5| |L|2|26|28.0|3.1| |M|2|23|26.5|2.9| |N|3|28|29.0|1.5| |O|2|47|38.5|4.3|

  • Denotes peak hourly flow rate to the treatment plant

Pipe Length Headloss

Hydraulic

Pipe

Pressure Pressure

|Pipe ID|Diameter (inches)|(ft)|(ft)|Grade (ft)|Elevation (ft)|Head (ft)|Head (psi)| |---|---|---|---|---|---|---|---| |A|6|550|1.4|207.4|206.0|1.4|0.6| |B|4|2,500|6.5|223.8|210.0|13.8|5.9| |C|2|1,500|20.7|244.5|214.0|30.5|13.2| |D|4|230|0.3|224.1|210.0|14.1|6.1| |E|2|750|8.8|233.4|211.0|22.4|9.6| |F|3|950|0.5|227.0|216.0|11.0|4.7| |G|4|500|3.8|211.2|214.0|-2.8|-1.2| |H|2|800|13.9|229.9|206.0|23.9|10.3| |I|4|2,100|12.5|226.5|213.0|13.5|5.8| |J|3|250|3.5|230.0|214.0|16.0|2.9| |K|3|300|2.5|232.5|212.0|20.5|8.8| |L|2|1,500|29.8|259.8|236.0|23.8|10.3| |M|2|300|5.4|237.9|207.8|30.1|13.0| |N|3|1,200|0.3|242.0|223.0|19.0|8.2| |O|2|1,900|68.1|300.9|214.0|*86.9|37.6|

Table 2. Current Flows Total Dynamic Head Loss Summary

  • Maximum Head Pressure

Table 3. Future Flows HGL Analysis Results

|Pipe ID|Diameter (inches)|Outgoing EDUs|Flow Demand (gpm)|Velocity (ft/s)| |---|---|---|---|---| |A|6|776|*388.0|5.5| |B|4|342|171.0|5.3| |C|2|16|23.0|2.6| |D|4|114|57.0|1.8| |E|2|12|21.0|2.3| |F|3|114|57.0|2.9| |G|4|435|217.5|6.7| |H|2|22|26.0|2.9| |I|4|270|135.0|4.2| |J|3|211|105.5|5.4| |K|3|155|77.5|4.0| |L|2|52|26.0|2.9| |M|2|23|26.5|2.9| |N|3|132|66.0|3.4| |O|2|47|38.5|4.3|

  • Denotes peak hourly flow rate to the treatment plant

Table 4. Future Flows Total Dynamic Head Loss Summary

|Pipe ID|Diameter (inches)|Pipe Length (ft)| Headloss (ft)|Hydraulic Grade (ft)|Pipe Elevation (ft)|Pressure Head (ft)|Pressure Head (psi)| |---|---|---|---|---|---|---|---| |A|6|550|9.6|215.6|206.0|9.6|4.1| |B|4|2,500|62.8|272.2|210.0|62.2|27.0| |C|2|1,500|20.7|286.7|214.0|72.7|31.5| |D|4|230|0.8|273.0|210.0|63.0|27.3| |E|2|750|8.8|283.5|211.0|72.5|31.3| |F|3|950|8.7|281.7|216.0|65.7|28.4| |G|4|500|19.6|235.2|214.0|21.2|9.2| |H|2|800|13.9|238.0|206.0|32.0|13.8| |I|4|2,100|34.1|269.3|213.0|56.3|24.4| |J|3|250|8.7|276.3|214.0|62.3|27.0| |K|3|300|5.9|282.2|212.0|70.2|30.4| |L|2|1,500|26.0|302.3|236.0|66.3|28.7| |M|2|300|5.4|283.4|207.8|75.6|32.7| |N|3|1,200|8.7|290.9|223.0|67.9|29.4| |O|2|1,900|68.1|311.0|214.0|*97.0|42.0|

  • Maximum Head Pressure

Pump Information

The line sizes indicated on the graphs have been chosen based upon the use of Orenco’s standard STEP pump, Model PF1005, which will achieve 10 gpm at 141 ft of TDH. This pump should be adequate for all residential and small commercial connections in this system, although this determination should be made after the final site analysis is completed. Pump information can be seen below.

==> picture [414 x 479] intentionally omitted <==

Figure 1. PF1005 Pump Performance Curve

For large flow commercial connections, Model PF3005 is recommended, which will achieve 30 gpm at 56.7 ft of TDH. This pump should be adequate for most large flow commercial connections in this system, although this determination should be made after the final site analysis is completed. Pump information can be seen below.

==> picture [439 x 517] intentionally omitted <==

Figure 2. PF3005 Pump Performance Curve

SECTION 4: HYDRAULIC GRADE LINE GRAPHS – CURRENT FLOWS

==> picture [469 x 348] intentionally omitted <==

Figure 4. HGL Graph - Current Flows, Pipe A

==> picture [469 x 345] intentionally omitted <==

Figure 5. HGL Graph - Current Flows, Pipe B

==> picture [469 x 344] intentionally omitted <==

==> picture [211 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 6. HGL Graph - Current Flows, Pipe C ----- End of picture text -----

==> picture [469 x 344] intentionally omitted <==

Figure 7. HGL Graph - Current Flows, Pipe D

==> picture [469 x 347] intentionally omitted <==

Figure 8. HGL Graph - Current Flows, Pipe E

==> picture [469 x 348] intentionally omitted <==

==> picture [210 x 13] intentionally omitted <==

----- Start of picture text -----

Figure 9. HGL Graph - Current Flows, Pipe F ----- End of picture text -----

==> picture [469 x 348] intentionally omitted <==

Figure 9. HGL Graph - Current Flows, Pipe G

==> picture [469 x 346] intentionally omitted <==

Figure 9. HGL Graph - Current Flows, Pipe H

==> picture [469 x 346] intentionally omitted <==

Figure 10. HGL Graph - Current Flows, Pipe I

==> picture [469 x 345] intentionally omitted <==

==> picture [215 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 11. HGL Graph - Current Flows, Pipe J ----- End of picture text -----

==> picture [469 x 343] intentionally omitted <==

==> picture [216 x 13] intentionally omitted <==

----- Start of picture text -----

Figure 12. HGL Graph - Current Flows, Pipe K ----- End of picture text -----

==> picture [469 x 348] intentionally omitted <==

Figure 13. HGL Graph - Current Flows, Pipe L

==> picture [469 x 348] intentionally omitted <==

Figure 14. HGL Graph - Current Flows, Pipe M

==> picture [469 x 347] intentionally omitted <==

Figure 15. HGL Graph - Current Flows, Pipe N

==> picture [469 x 345] intentionally omitted <==

Figure 16. HGL Graph - Current Flows, Pipe O

SECTION 5: HYDRAULIC GRADE LINE GRAPHS – FUTURE FLOWS

==> picture [469 x 347] intentionally omitted <==

Figure 17. HGL Graph - Future Flows, Pipe A

==> picture [469 x 342] intentionally omitted <==

==> picture [212 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 18. HGL Graph - Future Flows, Pipe B ----- End of picture text -----

==> picture [469 x 348] intentionally omitted <==

Figure 19. HGL Graph - Future Flows, Pipe C

==> picture [469 x 350] intentionally omitted <==

Figure 19. HGL Graph - Future Flows, Pipe D

==> picture [469 x 348] intentionally omitted <==

Figure 20. HGL Graph - Future Flows, Pipe E

==> picture [469 x 346] intentionally omitted <==

==> picture [210 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 21. HGL Graph - Future Flows, Pipe F ----- End of picture text -----

==> picture [469 x 346] intentionally omitted <==

Figure 22. HGL Graph - Future Flows, Pipe G

==> picture [469 x 346] intentionally omitted <==

==> picture [212 x 13] intentionally omitted <==

----- Start of picture text -----

Figure 23. HGL Graph - Future Flows, Pipe H ----- End of picture text -----

==> picture [469 x 346] intentionally omitted <==

==> picture [207 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 24. HGL Graph - Future Flows, Pipe I ----- End of picture text -----

==> picture [469 x 344] intentionally omitted <==

Figure 25. HGL Graph - Future Flows, Pipe J

==> picture [469 x 344] intentionally omitted <==

Figure 26. HGL Graph - Future Flows, Pipe L

==> picture [469 x 346] intentionally omitted <==

Figure 27. HGL Graph - Future Flows, Pipe M

==> picture [469 x 344] intentionally omitted <==

==> picture [212 x 12] intentionally omitted <==

----- Start of picture text -----

Figure 28. HGL Graph - Future Flows, Pipe N ----- End of picture text -----

==> picture [469 x 348] intentionally omitted <==

Figure 29. HGL Graph - Future Flows, Pipe O

Appendix F SPDES Permit

==> picture [139 x 45] intentionally omitted <==

State Pollutant Discharge Elimination System (SPDES) DISCHARGE PERMIT – MUNICIPAL

SIC Code:4952NAICS Code:NAICS Code:221320221320SPDES Number:NY0271420
Discharge Class (CL):07DEC Number:3-1348-00146/00007
Toxic Class (TX):TEffective Date (EDP):05/01/2020
Major-Sub Drainage Basin:13 - 08Expiration Date (ExDP):04/30/2025
H-158-4-2Part-Item;862.6-508;
N-24
Modification Dates (EDPM):
Water Index Number:
Map ref. no.
Compact Area:

This SPDES permit is issued in compliance with Title 8 of Article 17 of the Environmental Conservation Law of New York State and in compliance with the Clean Water Act, as amended, (33 U.S.C. '1251 et.seq.)

PERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESSPERMITTEE NAME AND ADDRESS
Name:Village of Red HookMayor, Village of Red Hook
Attention:
Street:7467 South Broadway
City:Red HookState:NYZip Code:12571
Email:Phone:(845) 306-7705
is authorized to discharge from the facility described below:
FACILITY NAME, ADDRESS, AND PRIMARY OUTFALL
Name:Village of Red Hook WWTP
Address / Location:US Route 9 (near O Callaghan Ln) / Village of Red HookCounty:Dutchess
City:Red HookState:NYZip Code:12571
Facility Location:Latitude:41
°59
30” N& Longitude:7353
1.4
” W
Primary Outfall No.:001Latitude:41
°59
29” N& Longitude:73
°
53
05
” W
Outfall Description:Treated SanitarySubtrib. of Saw KillClass;
StandardC; C(T)
Receiving Water:

in accordance with: effluent limitations; monitoring and reporting requirements; other provisions and conditions set forth in this permit; and 6 NYCRR Part 750-1 and 750-2.

This permit and the authorization to discharge shall expire on midnight of the expiration date shown above and the permittee shall not discharge after the expiration date unless this permit has been renewed or extended pursuant to law. To be authorized to discharge beyond the expiration date, the permittee shall apply for permit renewal not less than 180 days prior to the expiration date shown above.

DISTRIBUTION:

Ken Kearney, Kearney Realty Group Kathryn Serra, P.E., C.T. Male Associates Dutchess County Department of Health EPA NPDES Section, Region 2 Aparna Roy, NYSDEC Division of Water Cheri Jamison, NYSDEC Bureau of Water Permits

PermitRebecca S. CristRebecca S. CristRebecca S. Crist
Administrator:
21 South Putt Corners Road
New Paltz, NY 12561
Address:
05/01/2020
Signature:Date:

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 2 of 13

Contents

ContentsPage 2 of 13
INTERNAL OUTFALL UPON THE START UP OF THE 0.05 MGD PLANT3
DEFINITIONS FOR PERMIT LIMITS, LEVELS AND MONITORING TERMS4
INTERIM PERMIT LIMITS, LEVELS AND MONITORING5
FINAL PERMIT LIMITS, LEVELS AND MONITORING6
FINAL PERMIT LIMITS, LEVELS AND MONITORING (Continued)7
DISCHARGE NOTIFICATION REQUIREMENTS8
SCHEDULE OF COMPLIANCE9
GENERAL REQUIREMENTS11
RECORDING, REPORTING AND ADDITIONAL MONITORING REQUIREMENTS13

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 3 of 13

INTERNAL OUTFALL UPON THE START UP OF THE 0.05 MGD PLANT

OutfallWastewater DescriptionReceiving WaterStandard
01A-Internal Outfall for
Primary Outfall 001Treated Sanitary: effluent from the 0.05 MGD PlantSubtrib. of Saw KillC(T)
01B-Internal Outfall for
PrimaryOutfall 001Treated Sanitary: effluent from the 0.025 MGD PlantSubtrib. of Saw KillC(T)

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 4 of 13

DEFINITIONS FOR PERMIT LIMITS, LEVELS AND MONITORING TERMS

|DEFINITIONS|Page 4 of 13 FOR PERMIT LIMITS, LEVELS AND MONITORING TERMS| |---|---| |TERM|DEFINITION| |7-Day Geometric Mean|The highest allowable geometric mean of daily discharges over a calendar week.| |12-Month Rolling Average (12 MRA)|The current monthly value of a parameter, plus the sum of the monthly values over the previous 11 months for that parameter, divided by 12.| |30-Day Geometric Mean|The highest allowable geometric mean of daily discharges over a calendar month, calculated as the antilog of: the sum of the log of each of the daily discharges measured during a calendar month divided by the number of daily discharges measured during that month.| |Action Level|Action level means a monitoring requirement characterized by a numerical value that, when exceeded, triggers additional permittee monitoring and department review to determine if numerical effluent limitations should be imposed.| |Compliance Level / Minimum Level|A compliance level is an effluent limitation. A compliance level is given when the water quality evaluation specifies a Water Quality Based Effluent Limit (WQBEL) below the Minimum Level. The compliance level shall be set at the Minimum Level (ML) for the most sensitive analytical method as given in 40 CFR Part 136, or otherwise accepted by the Department.| |Daily Discharge|The discharge of a pollutant measured during a calendar day or any 24-hour period that reasonably represents the calendar day for the purposes of sampling. For pollutants expressed in units of mass, the ‘daily discharge’ is calculated as the total mass of the pollutant discharged over the day. For pollutants with limitations expressed in other units of measurement, the ‘daily discharge’ is calculated as the average measurement of the pollutant over the day.| |Daily Maximum|The highest allowable Daily Discharge.| |Daily Minimum|The lowest allowable Daily Discharge.| |Effective Date of Permit (EDP or EDPM)|The date this permit is in effect.| |Effluent Limitations|Effluent limitation means any restriction on quantities, quality, rates and concentrations of chemical, physical, biological, and other constituents of effluents that are discharged into waters of the state.| |Expiration Date of Permit (ExDP)|The date this permit is no longer in effect.| |Instantaneous Maximum|The maximum level that may not be exceeded at any instant in time.| |Instantaneous Minimum|The minimum level that must be maintained at all instants in time.| |Monthly Average|The highest allowable average of daily discharges over a calendar month, calculated as the sum of each of the daily discharges measured during a calendar month divided by the number of daily discharges measured during that month.| |Outfall|The terminus of a sewer system, or the point of emergence of any waterborne sewage, industrial waste or other wastes or the effluent therefrom, into the waters of the State.| |Range|The minimum and maximum instantaneous measurements for the reporting period must remain between the two values shown.| |Receiving Water|The classified waters of the state to which the listed outfall discharges.| |Sample Frequency / Sample Type / Units|See NYSDEC’s “DMR Manual for Completing the Discharge Monitoring Report for the SPDES” for information on sample frequency, type and units.|

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 5 of 13

INTERIM PERMIT LIMITS, LEVELS AND MONITORING

OUTFALLLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYRECEIVING WATERRECEIVING WATERRECEIVING WATERRECEIVING WATEREFFECTIVEEFFECTIVEEFFECTIVEEXPIRINGEXPIRINGEXPIRINGEXPIRING
001All year unless otherwise notedSubtrib. of Saw KillEDPMOn Startup(1) or on
01/01/2022 whichever
comes first
EFFLUENT LIMITATIONMONITORING REQUIREMENTSFN
PARAMETERLocation
SampleSampleInf.Eff.
TypeLimitUnitsLimitUnitsFrequencyType
FlowMonthly Average0.025MGDContinuous
RecorderX
pHRange6.5-8.5SUDailyGrabX
TemperatureDaily Maximum70Deg FDailyGrabX
BOD5Daily Maximum5.0mg/LQuarterlyGrabX
Total Suspended Solids (TSS)Daily Maximum10.0mg/LQuarterlyGrabX
Settleable SolidsDaily Maximum0.1mL/LDailyGrabX
Dissolved OxygenDaily Minimum7.0mg/LDailyGrabX
Nitrogen, Ammonia (as NH3)
(June 1 - October 31)Daily Maximum1.1mg/LQuarterlyGrabX
Nitrogen, Ammonia (as NH3)
(November 1 - May 31)Daily Maximum2.2mg/LQuarterlyGrabX
EFFLUENT DISINFECTIONSampleFN
LimitUnitsLimitUnitsSample TypeInf.Eff.
Required All YearFrequency
Coliform, Fecal30-Day
Geometric Mean200No./
100 mLQuarterlyGrabX
Coliform, Fecal7 Day
Geometric Mean400No./
100 mLQuarterlyGrabX
Chlorine, Total ResidualDaily Maximum0.1mg/LDailyGrabX2

FOOTNOTES:

  1. The limits on this page shall expire upon startup of the 0.05 mgd Facility. The startup date for the 0.5 mgd facility will be identified in a letter from the permittee to the offices listed on the Monitoring Reporting and Recording page of this permit and to the Chief, Bureau of Water Permits, South Section, 625 Broadway, Albany, NY 12233-3505. Startup shall commence with DEC, EFC or Dutchess County Department of Health approved reports, plans and specifications.

  2. Effluent limitation for Total Residual Chlorine is only applicable if chlorine is used for disinfection or other treatment processes.

  3. Quarterly samples shall be reported in March, June, September, and December (Q1 – January 1[st] to March 31[st] ; Q2 – April 1[st] to June 30[th] ; Q3 – July 1[st] to September 30[th] ; Q4 – October 1[st] to December 31[st] ).

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 6 of 13

FINAL PERMIT LIMITS, LEVELS AND MONITORING

OUTFALLLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYRECEIVING WATERRECEIVING WATERRECEIVING WATERRECEIVING WATEREFFECTIVEEFFECTIVEEFFECTIVEEFFECTIVEEXPIRINGEXPIRINGEXPIRING
01B(1)All year unless
otherwise notedSubtrib. of Saw KillOn Startup(3)or
On 01/01/2022,whichever comes firstExDP
EFFLUENT LIMITATIONMONITORING REQUIREMENTS
PARAMETERLocationFN
Sample
TypeLimitUnitsLimitUnitsSample Type
FrequencyInf.Eff.
FlowMonthly Average0.025MGDContinuousRecorderX
pHRange6.5-8.5SUDailyGrabX
TemperatureDaily Maximum70Deg FDailyGrabX
BOD5(June 1 - October 31)Daily Maximum5.0mg/LMonthlyGrabX
UOD (November 1 - May 31)Daily Maximum34.0mg/LMonthlyGrabX3
Total Suspended Solids (TSS)Daily Maximum10.0mg/LMonthlyGrabX
Settleable SolidsDaily Maximum0.1mL/LDailyGrabX
Dissolved OxygenDaily Minimum7.0mg/LDailyGrabX
Total Ammonia Nitrogen (as N)
(June 1 - October 31)Daily Maximum0.98mg/LMonthlyGrabX
Total Ammonia Nitrogen (as N)
(November 1 - May 31)
Daily Maximum
1.81
mg/LMonthly
GrabX
EFFLUENT DISINFECTIONSample
LimitUnitsLimitUnitsSample TypeInf.Eff.FN
Required All YearFrequency
Coliform, Fecal30-Day
Geometric Mean200No./
100 mLMonthlyGrabX
Coliform, Fecal7 Day
Geometric Mean400No./
100 mLMonthlyGrabX
Chlorine, Total ResidualDaily Maximum0.03mg/LDailyGrabX4,5

FOOTNOTES:

  1. Flow from Outfall 01B ultimately discharges to Subtrib. of Saw Kill, Outfall 001. The combined flow from Outfall 01B and Outfall 01A is 0.075 MGD and discharges via outfall 001.

  2. The limits on this page shall become effective upon startup of the 0.05 mgd Facility. The startup date for the 0.05 mgd facility will be identified in a letter from the permittee to the offices listed on the Monitoring Reporting and Recording page of this permit and to the Chief, Bureau of Water Permits, South Section, 625 Broadway, Albany, NY 12233-3505. Startup shall commence with DEC, EFC or Dutchess County Department of Health approved reports, plans and specifications.

  3. Ultimate Oxygen Demand (UOD) shall be computed as follows: UOD = (1.5 × CBOD5) + (4.5 × TKN).

  4. Effluent limitation for Total Residual Chlorine is only applicable if chlorine is used for disinfection or other treatment processes.

  5. This is a Compliance Level. The calculated WQBEL is 0.005 mg/l.

  6. Quarterly samples shall be reported in March, June, September, and December (Q1 – January 1st to March 31st; Q2 – April 1st to June 30th; Q3 – July 1st to September 30th; Q4 – October 1st to December 31st).

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 7 of 13

FINAL PERMIT LIMITS, LEVELS AND MONITORING (Continued)

OUTFALLLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYLIMITATIONS APPLYRECEIVING WATERRECEIVING WATERRECEIVING WATERRECEIVING WATERRECEIVING WATEREFFECTIVEEFFECTIVEEXPIRINGEXPIRINGEXPIRING
01A(2)Allyear unless otherwise notedSubtrib. of Saw KillOn Startup (3)ExDP
EFFLUENT LIMITATIONMONITORING REQUIREMENTS
PARAMETERLocationFN
Sample
TypeLimitUnitsLimitUnitsSample Type
FrequencyInf.Eff.
FlowMonthly Average0.05MGDContinuous
RecorderX
pHRange6.5-8.5
SUDailyGrabX
TemperatureDaily Maximum70Deg FDailyGrabX
BOD5(June 1 - October 31)Daily Maximum5.0mg/LMonthlyGrabX
UOD (November 1 - May 31)Daily Maximum34.0mg/LMonthlyGrabX3
Total Suspended Solids (TSS)Daily Maximum10.0mg/LMonthlyGrabX
Settleable SolidsDaily Maximum0.1mL/LDailyGrabX
Dissolved OxygenDaily Minimum7.0mg/LDailyGrabX
Total Ammonia Nitrogen (as N)
(June 1 - October 31)Daily Maximum0.98mg/LMonthlyGrabX
Total Ammonia Nitrogen (as N)
(November 1 - May 31)Daily Maximum1.81mg/LMonthlyGrabX
EFFLUENT DISINFECTIONSample
LimitUnitsLimitUnitsSample TypeInf.Eff.FN
Required All YearFrequency
Coliform, Fecal30-Day
Geometric Mean200No./
100 mLMonthlyGrabX
Coliform, Fecal7 Day
Geometric Mean400No./
100 mLMonthlyGrabX
Chlorine, Total ResidualDaily Maximum0.03mg/LDailyGrabX4,5

FOOTNOTES:

  1. Flow from Outfall 01A ultimately discharges to Subtrib. of Saw Kill, Outfall 001. The combined flow from Outfall 01B and Outfall 01A is 0.075 MGD and discharges via outfall 001.

  2. The limits on this page shall become effective upon startup of the 0.05 mgd Facility. The startup date for the 0.05 mgd facility will be identified in a letter from the permittee to the offices listed on the Monitoring Reporting and Recording page of this permit and to the Chief, Bureau of Water Permits, South Section, 625 Broadway, Albany, NY 12233-3505. Startup shall commence with DEC, EFC or Dutchess County Department of Health approved reports, plans and specifications.

  3. Ultimate Oxygen Demand (UOD) shall be computed as follows: UOD = (1.5 × CBOD5) + (4.5 × TKN).

  4. Effluent limitation for Total Residual Chlorine is only applicable if chlorine is used for disinfection or other treatment processes.

  5. This is a Compliance Level. The calculated WQBEL is 0.005 mg/l.

  6. Quarterly samples shall be reported in March, June, September, and December (Q1 – January 1[st] to March 31[st] ; Q2 – April 1[st] to June 30[th] ; Q3 – July 1[st] to September 30[th] ; Q4 – October 1[st] to December 31[st] ).

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 8 of 13

DISCHARGE NOTIFICATION REQUIREMENTS

  • (a) The permittee shall install and maintain identification signs at all outfalls to surface waters listed in this permit, unless the Permittee has obtained a waiver in accordance with the Discharge Notification Act (DNA). Such signs shall be installed before initiation of any discharge.

  • (b) Subsequent modifications to or renewal of this permit does not reset or revise the deadline set forth in (a) above, unless a new deadline is set explicitly by such permit modification or renewal.

  • (c) The Discharge Notification Requirements described herein do not apply to outfalls from which the discharge is composed exclusively of storm water, or discharges to ground water.

  • (d) The sign(s) shall be conspicuous, legible and in as close proximity to the point of discharge as is reasonably possible while ensuring the maximum visibility from the surface water and shore. The signs shall be installed in such a manner to pose minimal hazard to navigation, bathing or other water related activities. If the public has access to the water from the land in the vicinity of the outfall, an identical sign shall be posted to be visible from the direction approaching the surface water.

The signs shall have minimum dimensions of eighteen inches by twenty-four inches (18" x 24") and shall have white letters on a green background and contain the following information:

N.Y.S. PERMITTED DISCHARGE POINT

SPDES PERMIT No.: NY__________

OUTFALL No. :____

For information about this permitted discharge contact:

Permittee Name: _________________________________________________________________________ Permittee Contact: ________________________________________________________________________ Permittee Phone: ( ) - ### - #### OR:

NYSDEC Division of Water Regional Office Address:

NYSDEC Division of Water Regional Phone: ( ) - ### -####

  • (e) Upon request, the permittee shall make available electronic or hard copies of the sampling data to the public. In accordance with the RECORDING, REPORTING AND ADDITIONAL MONITORING REQUIREMENTS page of your permit, each DMR shall be maintained (either electronically or as a hard copy) on record for a period of five years.

  • (f) The permittee shall periodically inspect the outfall identification sign(s) in order to ensure they are maintained, are still visible, and contain information that is current and factually correct. Signs that are damaged or incorrect shall be replaced within 3 months of inspection.

  • (g) If the permittee believes that any outfall which discharges wastewater from the permitted facility meets any of the DNA waiver criteria, notification must be made to the Department’s Bureau of Water Permits. Provided there is no objection by the Department, a sign for the involved outfall(s) are not required. This notification must include the facility’s name, address, telephone number, contact, permit number, outfall number(s), and reason why such outfall(s) is waived from the requirements of discharge notification. The Department may evaluate the applicability of a waiver at any time and take appropriate measures to assure that the ECL and associated regulations are complied with.

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 9 of 13

SCHEDULE OF COMPLIANCE

a) The permittee shall comply with the following schedule:

Outfall(s)Compliance ActionDue Date
01B-The permittee shall submit an approvable engineering report, prepared----EDPM + 6 Months
--by a Professional Engineer licensed to practice engineering in New York----At completion of
--State, detailing the designs that will be used to comply with the final----0.05 MGD Plant or
--effluent limitations for Ammonia Nitrogen (as N) and UOD.----01/01/2022,
--The permittee shall complete construction In Accordance with Approved----whichever comes
--Eng. Report and commence operation of the system and comply with----first
--the final effluent limitations for Ammonia Nitrogen (as N) and UOD.-----
The above compliance actions are one-time requirements. The permittee shall comply with the above
compliance actions to the Department’s satisfaction once. When this permit is administratively renewed by
NYSDEC letter entitled “SPDES NOTICE/RENEWAL APPLICATION/PERMIT,” the permittee is not required to
repeat the submission(s) noted above. The above due dates are independent from the effective date of the
permit stated in the“SPDES NOTICE/RENEWAL APPLICATION/PERMIT” letter.
INTERIM EFFLUENT LIMITS FOR PARAMETERS SUBJECT TO THIS SCHEDULE OF COMPLIANCE
Parameter(s)Interim Effluent Limit
OutfallLimits ApplyInterim Limits Expire
AffectedTypeLimitUnits
001Ammonia
Nitrogen (as
NH3)Daily Max1.1mg/LJune 1 - October 31At completion of 0.05
MGD Plant or
01/01/2022, whichever
comes first
001Ammonia
Nitrogen (as
NH3)Daily Max2.2mg/LNovember 1 - May 31At completion of 0.05
MGD Plant or
01/01/2022, whichever
comes first

||Outfall|Parameter(s) Affected|Interim Type|Effluent Limit|Limit Units|Limit Units|Limits Apply|Interim Limits Expire|| |---|---|---|---|---|---|---|---|---|---| ||001|Ammonia Nitrogen (as NH3)|Daily Max|1.1||mg/L|June 1 - October 31|At completion of 0.05 MGD Plant or 01/01/2022, whichever comes first|| ||001|Ammonia Nitrogen (as NH3)|Daily Max|2.2||mg/L|November 1 - May 31|At completion of 0.05 MGD Plant or 01/01/2022, whichever comes first|| |||||||||||

  • b) The permittee shall submit a written notice of compliance or non-compliance with each of the above schedule dates no later than 14 days following each elapsed date, unless conditions require more immediate notice as prescribed in 6 NYCRR Part 750-1.2(a) and 750-2. All such compliance or non-compliance notification shall be sent to the locations listed under the section of this permit entitled RECORDING, REPORTING AND ADDITIONAL MONITORING REQUIREMENTS. Each notice of non-compliance shall include the following information:

    1. A short description of the non-compliance;

    2. A description of any actions taken or proposed by the permittee to comply with the elapsed schedule requirements without further delay and to limit environmental impact associated with the non-compliance;

    3. Any details which tend to explain or mitigate an instance of non-compliance; and

    4. An estimate of the date the permittee will comply with the elapsed schedule requirement and an assessment of the probability that the permittee will meet the next scheduled requirement on time.

  • c) The permittee shall submit copies of any document required by the above schedule of compliance to the NYSDEC Regional Water Engineer and to the Bureau of Water Permits.

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 10 of 13

MONITORING LOCATIONS

The permittee shall take samples and measurements, to comply with the monitoring requirements specified in this permit, at the locations(s) specified below:

Effluent: 01A (for 0.05 MGD plant)

Effluent: 01B (for 0.025 MGD Plant. Existing sampling location Outfall 001 will be renamed to Outfall 01B upon the startup of 0.05 MGD plant)

==> picture [540 x 186] intentionally omitted <==

==> picture [540 x 186] intentionally omitted <==

==> picture [540 x 218] intentionally omitted <==

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 11 of 13

GENERAL REQUIREMENTS

  • A. The regulations in 6 NYCRR Part 750 are hereby incorporated by reference and the conditions are enforceable requirements under this permit. The permittee shall comply with all requirements set forth in this permit and with all the applicable requirements of 6 NYCRR Part 750 incorporated into this permit by reference, including but not limited to the regulations in paragraphs B through I as follows:

B. General Conditions

  1. Duty to comply

  2. Duty to reapply

  3. Need to halt or reduce activity not a defense

  4. Duty to mitigate

  5. Permit actions

  6. Property rights

  7. Duty to provide information

  8. Inspection and entry

6NYCRR 750-2.1(e) & 2.4 6NYCRR 750-1.16(a) 6NYCRR 750-2.1(g) 6NYCRR 750-2.7(f) 6NYCRR 750-1.1(c), 1.18, 1.20 & 2.1(h) 6NYCRR 750-2.2(b) 6NYCRR 750-2.1(i) 6NYCRR 750-2.1(a) & 2.3

  • C. Operation and Maintenance

    1. Proper Operation & Maintenance 2. Bypass 3. Upset

6NYCRR 750-2.8 6NYCRR 750-1.2(a)(17), 2.8(b) & 2.7 6NYCRR 750-1.2(a)(94) & 2.8(c)

  • D. Monitoring and Records

    1. Monitoring and records 2. Signatory requirements

6NYCRR 750-2.5(a)(2), 2.5(a)(6), 2.5(c)(1), 2.5(c)(2), & 2.5(d) 6NYCRR 750-1.8 & 2.5(b)

  • E. Reporting Requirements

    1. Reporting requirements 6NYCRR 750-2.5, 2.7 & 1.17 2. Anticipated noncompliance 6NYCRR 750-2.7(a) 3. Transfers 6NYCRR 750-1.17 4. Monitoring reports 6NYCRR 750-2.5(e) 5. Compliance schedules 6NYCRR 750-1.14(d) 6. 24-hour reporting 6NYCRR 750-2.7(c) & (d) 7. Other noncompliance 6NYCRR 750-2.7(e) 8. Other information 6NYCRR 750-2.1(f) 9. Additional conditions applicable to a POTW 6NYCRR 750-2.9
  • F. Planned Changes

    1. The permittee shall give notice to the Department as soon as possible of planned physical alterations or additions to the permitted facility when:

      • a. The alteration or addition to the permitted facility may meet any of the criteria for determining whether facility is a new source in 40 CFR §122.29(b); or

      • b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject either to effluent limitations in the permit, or to notification requirements under 40 CFR §122.42(a)(1); or

      • c. The alteration or addition results in a significant change in the permittee’s sludge use or disposal practices, and such alteration, addition, or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit application process or not reported pursuant to an approved land application plan.

In addition to the Department, the permittee shall submit a copy of this notice to the United States Environmental Protection Agency at the following address: U.S. EPA Region 2, Clean Water Regulatory Branch, 290 Broadway, 24th Floor, New York, NY 10007-1866.

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 12 of 13

GENERAL REQUIREMENTS (continued)

  1. Notification Requirement for POTWs

All POTWs shall provide adequate notice to the Department and the USEPA of the following:

  • a. Any new introduction of pollutants into the POTW from an indirect discharger which would be subject to section 301 or 306 of CWA if it were directly discharging those pollutants; or

  • b. Any substantial change in the volume or character of pollutants being introduced into that POTW by a source introducing pollutants into the POTW at the time of issuance of the permit.

  • c. For the purposes of this paragraph, adequate notice shall include information on:

    • i. the quality and quantity of effluent introduced into the POTW, and

    • ii. any anticipated impact of the change on the quantity or quality of effluent to be discharged from the POTW.

POTWs shall submit a copy of this notice to the United States Environmental Protection Agency, at the following address:

U.S. EPA Region 2, Clean Water Regulatory Branch, 290 Broadway, 24th Floor, New York, NY 10007-1866

  • G. Sludge Management

The permittee shall comply with all applicable requirements of 6 NYCRR Part 360.

  • H. SPDES Permit Program Fee

The permittee shall pay to the Department an annual SPDES permit program fee within 30 days of the date of the first invoice, unless otherwise directed by the Department, and shall comply with all applicable requirements of ECL 720602 and 6 NYCRR Parts 480, 481 and 485. Note that if there is inconsistency between the fees specified in ECL 720602 and 6 NYCRR Part 485, the ECL 72-0602 fees govern.

  • I. Water Treatment Chemicals (WTCs)

New or increased use and discharge of a WTC requires prior Department review and authorization. At a minimum, the permittee must notify the Department in writing of its intent to change WTC use by submitting a completed WTC Notification Form for each proposed WTC. The Department will review that submittal and determine if a SPDES permit modification is necessary or whether WTC review and authorization may proceed outside of the formal permit administrative process. The majority of WTC authorizations do not require SPDES permit modification. In any event, use and discharge of a WTC shall not proceed without prior authorization from the Department. Examples of WTCs include biocides, coagulants, conditioners, corrosion inhibitors, defoamers, deposit control agents, flocculants, scale inhibitors, sequestrants, and settling aids.

  1. WTC use shall not exceed the rate explicitly authorized by this permit or otherwise authorized in writing by the Department.

  2. The permittee shall maintain a logbook of all WTC use, noting for each WTC the date, time, exact location, and amount of each dosage, and, the name of the individual applying or measuring the chemical. The logbook must also document that adequate process controls are in place to ensure that excessive levels of WTCs are not used.

  3. The permittee shall submit a completed WTC Annual Report Form each year that they use and discharge WTCs. This form shall be submitted in electronic format and attached to either the December DMR or the annual monitoring report required below. The WTC Notification Form and WTC Annual Report Form are available from the Department’s website at: http://www.dec.ny.gov/permits/93245.html

Effective Date: 05/01/2020

SPDES Number: NY0271420 Page 13 of 13

RECORDING, REPORTING AND ADDITIONAL MONITORING REQUIREMENTS

  • A. The monitoring information required by this permit shall be retained for a period of at least five years from the date of the sampling for subsequent inspection by the Department or its designated agent.

  • B. Discharge Monitoring Reports (DMRs): Completed DMR forms shall be submitted for each 1 month reporting period in accordance with the DMR Manual available on Department’s website.

DMRs must be submitted electronically using the electronic reporting tool (NetDMR) specified by NYSDEC. Instructions on the use of NetDMR are available in the DMR Manual. Hardcopy paper DMRs will only be received at the address listed below for the Bureau of Water Permits, if a waiver from the electronic submittal requirements has been granted by DEC to the facility.

Attach the monthly "Wastewater Facility Operation Report" (form 92-15-7) and any required DMR attachments electronically to the DMR or with the hardcopy submittal.

The first monitoring period begins on the effective date of this permit, and, unless otherwise required, the reports are due no later than the 28th day of the month following the end of each monitoring period.

  • C. The monitoring information required by this permit shall be summarized and reported to the RWE and Bureau of Water Permits at the following addresses:

Department of Environmental Conservation Division of Water, Bureau of Water Permits

625 Broadway, Albany, New York 12233-3505 Phone: (518) 402-8111

Department of Environmental Conservation Regional Water Engineer, Region 3

100 Hillside Avenue, Suite 1W, White Plains, New York, 10603-2860 Phone: (914) 428-2505

  • D. Bypass and Sewage Pollutant Right to Know Reporting: In accordance with the Sewage Pollutant Right to Know Act (ECL § 17-0826-a), Publicly Owned Treatment Works (POTWs) are required to notify DEC and Department of Health within two hours of discovery of an untreated or partially treated sewage discharge and to notify the public and adjoining municipalities within four hours of discovery. Information regarding reporting and other requirements of this program may be found on the Department’s website. In addition, POTWs are required to provide a five-day incident report and supplemental information to the DEC in accordance with Part 750-2.7(d) by utilizing the Division of Water Report of Noncompliance Event form unless waived by DEC on a case-by-case basis.

  • E. Monitoring and analysis shall be conducted using sufficiently sensitive test procedures approved under 40 CFR Part 136, unless other test procedures have been specified in this permit.

  • F. More frequent monitoring of the discharge(s), monitoring point(s), or waters of the State than required by the permit, where analysis is performed by a certified laboratory or where such analysis is not required to be performed by a certified laboratory, shall be included in the calculations and recording of the data on the corresponding DMRs.

  • G. Calculations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this permit.

  • H. Unless otherwise specified, all information recorded on the DMRs shall be based upon measurements and sampling carried out during the most recently completed reporting period.

  • I. Any laboratory test or sample analysis required by this permit for which the State Commissioner of Health issues certificates of approval pursuant to section 502 of the Public Health Law shall be conducted by a laboratory which has been issued a certificate of approval. Inquiries regarding laboratory certification should be directed to the New York State Department of Health, Environmental Laboratory Accreditation Program.

Appendix G Photographs

==> picture [386 x 295] intentionally omitted <==

WWTP Photographs

VILLAGE OF RED HOOK

Dutchess County, New York

SPEDES #NY0271420

CWSRF #C3-5387-01-01

==> picture [612 x 52] intentionally omitted <==

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [437 x 332] intentionally omitted <==

Original 25,000 MGD WWTP Controls (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [372 x 284] intentionally omitted <==

Original 25,000 MGD WWTP Side Exterior (2/2024)

==> picture [385 x 294] intentionally omitted <==

Original 25,000 MGD Influent from Apartments (2/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [428 x 565] intentionally omitted <==

Original 25,000 GPD WWTP Aeration Interior (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [437 x 576] intentionally omitted <==

Original 25,000 GPD WWTP Aeration Interior (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [452 x 597] intentionally omitted <==

Original 25,000 GPD WWTP (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [461 x 609] intentionally omitted <==

Original 25,000 GPD WWTP (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [354 x 270] intentionally omitted <==

Original 25,000 GPD WWTP (12/2021)

==> picture [353 x 270] intentionally omitted <==

Original 25,000 GPD WWTP UV Interior (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [449 x 593] intentionally omitted <==

Original 25,000 GPD WWTP UV End Panel (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [353 x 269] intentionally omitted <==

Original 25,000 GPD WWTP UV End Tanks (2/2024)

==> picture [355 x 270] intentionally omitted <==

Original 25,000 GPD WWTP UV End Treatment (2/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [460 x 607] intentionally omitted <==

Original 25,000 GPD WWTP Controls (12/2021)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [351 x 268] intentionally omitted <==

New 50,000 GPD WWTP Side Exterior (2/2024)

==> picture [356 x 271] intentionally omitted <==

New 50,000 GPD WWTP Side Controls Exterior (2/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [353 x 270] intentionally omitted <==

New 50,000 GPD WWTP Side Aeration Interior (2/2024)

==> picture [353 x 270] intentionally omitted <==

New 50,000 GPD WWTP Side UV Interior (2/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [353 x 270] intentionally omitted <==

New 50,000 GPD WWTP Side UV End Tanks Interior (2/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [461 x 609] intentionally omitted <==

Filter tank, thick (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [462 x 610] intentionally omitted <==

Entry to UV Disinfection (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [443 x 584] intentionally omitted <==

Sampling at UV disinfection entrance (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [444 x 586] intentionally omitted <==

Entry to Sand Filters (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [449 x 593] intentionally omitted <==

Sand Filters (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [448 x 591] intentionally omitted <==

Outfall and Ground Water Iron bacteria (5/2024)

Delaware Engineering, DPC

Preliminary Engineering Report

Municipality Name & Project Name

==> picture [442 x 583] intentionally omitted <==

Outfall Discharge Overgrowth (5/2024)

Delaware Engineering, DPC

Appendix H EDU Count and Charges (April 2023)

Red Hook Sewer Area RED HOOK, NEW YORK

Capital per EDU $ 716.00 O&M per EDU $ 311.00 Total $ 1,027.00

Single Family Residential Ave Water Use is 150 gpd

Revised: 4/10/2023

Prepared By: C.T. Male Associates

1 EDU = 150 gpd

All ID's are Section All EDUs are based upon water use or minimum of 1 EDU.

EDU Based on Water Consumption Data

| Hook | Land | AC | Ave Daily | SF | Com | Cost / Year | | UP | Use | - | Water Use | EDU | EDU | - | | Customer Name | - | - | (gpd) | - | - | - | | Service Located | - | - | - | - | - | - | | Tax ID (block- | - | - | - | - | - | - | | lot) | - | - | - | - | - | - | | BU - 1 | - | - | - | - | - | - | | Developed Properties | - | - | - | - | - | - | | Capital plus O&M | - | - | - | - | - | - | | North Broadway - Before Cherry St. | - | - | - | - | - | - | | 1 Damese, LLC | - | - | - | - | - | - | | 7592 N. Broadway | - | - | - | - | - | - | | 07-514864 | - | - | - | - | - | - | | 2 Rotger, Scott | - | - | - | - | - | - | | 7590 N. Broadway | - | - | - | - | - | - | | 07-531857 | - | - | - | - | - | - | | 3 Annunziata, Salvatore | - | - | - | - | - | - | | 7588 N. Broadway | - | - | - | - | - | - | | 07-506847 | - | - | - | - | - | - | | 4 LaVeglia Group LLC | - | - | - | - | - | - | | 7582 N. Broadway | - | - | - | - | - | - | | 07-503840 | - | - | - | - | - | - | | 5 Red Hook Business Park | - | - | - | - | - | - | | 7578 N. Broadway | - | - | - | - | - | - | | 07-522832 | - | - | - | - | - | - | | 6 Allef Main Street Partners, LLC | - | - | - | - | - | - | | 7568 N. Broadway | - | - | - | - | - | - | | 06-490816 | - | - | - | - | - | - | | 7 Historic Red Hook Inc. | - | - | - | - | - | - | | 7562 N. Broadway | - | - | - | - | - | - | | 06-479800 | - | - | - | - | - | - | | 8 Butcher, Alice P | - | - | - | - | - | - | | 7563 N. Broadway | - | - | - | - | - | - | | 06-459805 | - | - | - | - | - | - | | 9 Staff, Christopher G | - | - | - | - | - | - | | 7567 N. Broadway | - | - | - | - | - | - | | 06-446814 | - | - | - | - | - | - | | 10 Boreo Ventures, LLC | - | - | - | - | - | - | | 7571 Old Post Road | - | - | - | - | - | - | | 06-454830 | - | - | - | - | - | - | | Subtotals | - | - | - | - | - | - | | North Broadway - Between Cherry St. and St. John St. | - | - | - | - | - | - | | 11 Stewart's Shops Corp. | - | - | - | - | - | - | | 7558 N. Broadway | - | - | - | - | - | - | | 06-473785 | - | - | - | - | - | - | | 12 Cuthell, Dawn Hagman Trustee | - | - | - | - | - | - | | 7557 N. Broadway | - | - | - | - | - | - | | 06-456795 | - | - | - | - | - | - | | 13 Cole, Allen Richard | - | - | - | - | - | - | | 7555 N. Broadway | - | - | - | - | - | - | | 06-455789 | - | - | - | - | - | - | | 14 Arsam's Inc | - | - | - | - | - | - | | 7550 N. Broadway | - | - | - | - | - | - | | 06-471776 | - | - | - | - | - | - | | 15 Hudson Valley Vintage LLC | - | - | - | - | - | - | | 7549 N. Broadway | - | - | - | - | - | - | | 06-453784 | - | - | - | - | - | - | | 16 Whalesback LLC | - | - | - | - | - | - | | 7545 N. Broadway | - | - | - | - | - | - | | 06-451778 | - | - | - | - | - | - | | 17 Baright Realty | - | - | - | - | - | - | | 7540 N. Broadway | - | - | - | - | - | - | | 06-478765 | - | - | - | - | - | - | | 18 Zennario, Jane M | - | - | - | - | - | - | | 7537-7539 N. Broadway | - | - | - | - | - | - | | 06-440772 | - | - | - | - | - | - | | 19 Keil Reality LLC | - | - | - | - | - | - | | 7536 N. Broadway | - | - | - | - | - | - | | 06-470753 | - | - | - | - | - | - | | 20 KDA Properties LLC | - | - | - | - | - | - | | 7531 N. Broadway | - | - | - | - | - | - | | 06-443763 | - | - | - | - | - | - | | 21 Rhinehook LLC -Scanlon Cleaners | - | - | - | - | - | - | | 7528 N. Broadway | - | - | - | - | - | - | | 06-461750 | - | - | - | - | - | - | | 22 Red Hook LLC | - | - | - | - | - | - | | 7525 N. Broadway | - | - | - | - | - | - | | 06-440756 | - | - | - | - | - | - | | 23 TGKK Ventures LLC | - | - | - | - | - | - | | 7518 N. Broadway | - | - | - | - | - | - | | 10-471735 | - | - | - | - | - | - | | 24 Syed Yasin | - | - | - | - | - | - | | 7519 N. Broadway | - | - | - | - | - | - | | 10-436749 | - | - | - | - | - | - | |||||||| |||||||| |||||||| ||484|0.51|55||1|1,027.00 $| ||410|0.66|615||4|4,108.00 $| ||423|0.29|709||5|5,135.00 $| ||484|0.6|403||3|3,081.00 $| ||481|2.6|308||2|2,054.00 $| ||454|1.1|2019||13|13,351.00 $| ||681|0.47|21||1|1,027.00 $| ||210|0.54|35|1||1,027.00 $| ||220|1.11|235||2|2,054.00 $| ||283|0.847|335||2|2,054.00 $| |||||||| |||||1|33|| |||||||| |||||||| ||486|0.1|242||2|2,054.00 $| ||210|0.23|59|1||1,027.00 $| ||210|0.21|90|1||1,027.00 $| ||422|0.23|1331||9|9,243.00 $| ||283|0.17|147||1|1,027.00 $| ||210|0.3|174|1||1,027.00 $| ||411|0.69|336||2|2,054.00 $| ||483|0.905|317||2|2,054.00 $| ||455|1|56||1|1,027.00 $| ||483|0.28|258||2|2,054.00 $| ||484|0.3|65||1|1,027.00 $| ||465|0.31|110||1|1,027.00 $| ||456|1.1|71||1|1,027.00 $| ||432|0.4|74||1|1,027.00 $| ||||||||

Subtotals 3 23

North Broadway - Between St. John St. and Market 25 Baright Realty 7514 N. Broadway 10-452731 26 Rhtel LLC 7509 N. Broadway 10-429738 27 Baright Realty 7506-7508 N. Broadway 10-446726 Subtotals West Market - Between Broadway and Church St. 28 Baright Realty 19 W. Market St. 10-425729 29 Dillon, John 21-29 W. Market St. 10-413739 30 Key Bank 28 W. Market St. 10-395718 31 Avel Realty LLC 31-35 W. Market St. 10-408743 32 Electric Ave Holdings, LLC 37 W. Market St. 10-403746 33 Taste Budd's, LLC 40 W. Market St. 10-390724 34 Red Hook Holdings LLC 39 W. Market St. 10-396745 35 Red Hook Holdings LLC 41-43 W. Market St. 10-396745 36 Nic Enterprises, LLC 42 W. Market St. 10-383729 37 Nic Enterprises, LLC 44 W. Market St. 10-383729 38 Borchetti Catering, Inc. 46 W. Market St. 10-378736 39 Borenstein, David 45-47 W. Market St. 06-390752 40 Trezza, Gloria 49 W. Market St. 06-383756 Subtotals

|||||||| ||482|0.31|360||2|2,054.00 $| ||465|0.53|952||6|6,162.00 $| ||482|0.07|0||1|1,027.00 $| |||||||| ||||||9|| |||||||| |||||||| ||481|0.4|427||3|3,081.00 $| ||481|0.343|129||1|1,027.00 $| ||462|0.53|34||1|1,027.00 $| ||481|0.3|45||1|1,027.00 $| ||283|0.16|78||1|1,027.00 $| ||483|0.29|788||5|5,135.00 $| ||280|0.34|179||1|1,027.00 $| ||280|0.34|461||3|3,081.00 $| ||480|0.1|200||1|1,027.00 $| ||480|0.1|312||2|2,054.00 $| ||483|0.1|334||2|2,054.00 $| ||220|0.26|354||2|2,054.00 $| ||283|0.26|71||1|1,027.00 $| |||||||| |||||0|24|| ||||||||

West Market - Between Church St. and Linden Ave. 41 Methodist Church of Red Hook 52 W. Market St. 10-357737 42 Dominy, Michele 51 W. Market St. 06-374762 43 Morgan, Kate 53 W. Market St. 06-367763 44 Pelosi, John 54 W. Market St. 10-353746 45 Agrest, Sara 56 W. Market St. 10-348748 46 Steerman, James 57 W. Market St. 06-361767 47 Cirincion, John and Cubba 58 W. Market St. 06-342750 48 Weir, David 59 W. Market St. 06-351772 49 Acker, Charles 60 W. Market St. 06-334754 Subtotals East Market - Between Broadway and Elizabeth St. 50 Baright Realty 1-7 E. Market St. 10-444720 51 Scism LLc 2 E. Market St. 10-440706 Scism LLc 3 E. Market St. 10-440706 Scism LLc 3 AUC E. Market St. 10-440706 Scism LLc 10 E. Market St. 10-440706 52 Baright Realty 15-21 E. Market St. 10-459722 & 10-45 53 Baright Realty 9 E. Market St. 10-450722 54 Baright Realty 16 E. Market St. 10-450702 55 Rifenbergh, Mrs. Vernon S. 20 E. Market St. 10-455704 56 Lown, Donna 22 E. Market St. 10-460703 57 Lueck,Michael -Charlie O's Bar and Grill 23 E. Market St. 10-466723 58 Dockstader Properties LLC 24 E. Market St. 10-464702 Subtotals

||620|0.62|285||2|2,054.00 $| ||210|0.31|42|1||1,027.00 $| ||210|0.1|44|1||1,027.00 $| ||210|0.1|63|1||1,027.00 $| ||210|0.237|0|1||1,027.00 $| ||210|0.31|239|1||1,027.00 $| ||210|0.284|229|1||1,027.00 $| ||280|0.674|130||1|1,027.00 $| ||210|0.39|151|1||1,027.00 $| |||||||| |||||7|3|| |||||||| |||||||| ||481|0.11|1000||7|7,189.00 $| ||482|0.516|160||1|1,027.00 $| ||482|0.516|49||1|1,027.00 $| ||482|0.516|1301||9|9,243.00 $| ||482|0.516|207||1|1,027.00 $| || 482|0.152|822||5|5,135.00 $| ||482|0.11|736||5|5,135.00 $| ||457|0.18|96||1|1,027.00 $| ||210|0.1|16|1||1,027.00 $| ||210|0.13|60|1||1,027.00 $| ||482|0.25|824||5|5,135.00 $| ||283|0.14|83||1|1,027.00 $| |||||||| |||||2|36|| ||||||||

East Market - Between Elizabeth St. and Graves St. 59 Lueck, Michael 25 E. Market St. 10-470720 60 Chan, Chau Ping 28 E. Market St. 10-472702 61 Henke, Edwin -Henke Insurance Agency 29 E. Market St. 10-478721 62 Blue Lake House, LLC 30 E. Market St. 10-477701 63 Howe, Bruce 31 E. Market St. 10-482721 64 Ripley, Scott 32 E. Market St. 10-482699 65 Reetz, Theresa 33 E. Market St. 10-485722 66 Coon, Arvine Jr. 34 E. Market St. 10-485691 67 35 East Market Street LLC 35 E. Market St. 10-490719 68 Meyer, Nancy J. 36 E. Market St. 10-491689 69 Friberg, Karl 37 E. Market St. 10-499714 69-1 Ozon LLC 6-8 Graves St. 10-492727 Subtotals East Market - Between Graves St. and Thompson St. 70 Benson, Alice 38 E. Market St. 10-498689 71 Lekstrom, Arvid 39 E. Market St. 11-508722 72 Borenstine, David 40 E. Market St. 11-506690 73 Castle, Alison 42 E. Market St. 11-512689 74 Baright Realty 43 E. Market St. 11-523727 75 Dut. Co. Comm. Action Agency 44 E. Market St. 11-520689 76 Jack DiPietro 45-47 E. Market St. 11-526712 77 Reilingh, Maarten 48 E. Market St. 11-530695 78 Jui-hung, Ou-Yang 49 E. Market St. 11-532711 79 Ozon LLC 50 E. Market St. 11-535694 80 Perazzo, Albino 51 E. Market St. 11-538711 81 Kudla, Phillip 52 E. Market St. 11-544688 Subtotals

||482|0.07|31||1|1,027.00 $| ||421|0.16|332||2|2,054.00 $| ||283|0.09|66||1|1,027.00 $| ||210|0.14|212|1|0|1,027.00 $| ||210|0.11|125|1|0|1,027.00 $| ||283|0.14|85||1|1,027.00 $| ||210|0.18|223|1||1,027.00 $| ||210|0.362|164|1||1,027.00 $| ||283|0.16|31||1|1,027.00 $| ||210|0.355|19|1||1,027.00 $| ||210|0.12|101|1||1,027.00 $| ||220|0.06|100||1|1,027.00 $| |||||6|7|| |||||||| |||||||| ||411|0.58|234||2|2,054.00 $| ||210|0.31|32|1||1,027.00 $| ||210|0.42|143|1||1,027.00 $| ||210|0.38|70|1||1,027.00 $| ||230|1.427|613||4|4,108.00 $| ||230|0.672|259||2|2,054.00 $| ||220|0.154|164||1|1,027.00 $| ||210|0.14|49|1||1,027.00 $| ||210|0.13|71|1||1,027.00 $| ||280|0.14|166||1|1,027.00 $| ||220|0.23|83||1|1,027.00 $| ||220|0.39|34||1|1,027.00 $| |||||||| |||||5|12|| ||||||||

East Market - After Thompson St. 82 Urbin, Lori 53 E. Market St. 11-546711 83 Fier, Jennifer 56 E. Market St. 11-553669 84 Borenstine, David 57 E. Market St. 11-553715 85 Borenstine, David 59-61 E. Market St. 11-557709 86 Stehing, Christopher 60 E. Market St. 11-567659 87 Watertight Plumbing & Heating 62 E. Market St. 11-567686 88 Borenstine, David 63 E. Market St. 11-570707 89 Zitz, Vincent 64-66 E. Market St. 11-579660 90 Red Hook Community Center 59 Fisk St. 11-598636 Subtotals South Broadway - Between Market and Prince St. 91 Matwey, Michael - Tobaco Lane 7484 S. Broadway 10-442688 Baright Realty 3 S. Broadway 92 Mid-Valley Oil Company Inc - Extra-Mart 2 W. Market St. 10-419715 93 Eckelman, Stephen and Mary Anne 7485 S. Broadway 10-402710 94 Kittner & Fredricks 7481-7483 S. Broadway 10-416707 95 Kittner and Fredricks 7483 S. Broadway 10-416707 96 Cheng, Kan Kuen 7479 S. Broadway 10-413702 97 Tinman & the Scarecrow LLC 7478 S. Broadway 10-431694 98 Mid Hudson Valley Federal Credit Union 7468-7476 S Broadway 10-433677 98a DLV Ventures LLC 7472 S Broadway 10-435669 Subtotals South Broadway - Between Prince St. and Fraleigh St. 99 Village of Red Hook, Village Hall 7467 S. Broadway 10-404688 100 7466 S. Broadway, LLC 7466 S. Broadway 10-422678 101 ECP Holdings LLC 7461 S. Broadway 10-392686 102 Roasted Garlic LLC 7460 S. Broadway 10-421656 103 C & C Realty of Red Hook LLC 7452 S. Broadway 10-408663 104 Eccles, Thomas and Jennifer 7449 S. Broadway 10-385673 Subtotals South Broadway - Between Fraleigh St. and Garden St. 105 Red Hook Public Library 7444 S. Broadway 10-404652 106 Phillips, Velma 7441 S. Broadway 10-385658 107 Saifer, Steffen 7437 S. Broadway 10-378656 108 Walsh, Jeff and Melkorka Kjarval 7436 S. Broadway 10-398640 109 Stokum, Jeff and Jenny 7435 S. Broadway 10-371656 110 Diamond, Jane K. 7432 S. Broadway 10-388636 111 Odom, Ronald 7431 S. Broadway 10-368650 112 Christ Church 7423-7429 S. Broadway 10-358639 Subtotals

||210|0.309|172|1||1,027.00 $| ||210|2.1|217|1||1,027.00 $| ||220|0.201|372||2|2,054.00 $| ||425|0.17|634||4|4,108.00 $| ||210|1|150|1||1,027.00 $| ||283|0.25|42||1|1,027.00 $| ||230|0.212|191||1|1,027.00 $| ||280|0.96|300||2|2,054.00 $| ||612|1.58|41||1|1,027.00 $| |||||3|11|| |||||||| |||||||| ||482|0.67|824||5|5,135.00 $| ||||58||1|1,027.00 $| ||486|0.386|185||1|1,027.00 $| ||411|0.28|251||2|2,054.00 $| ||482|0.23|27||1|1,027.00 $| ||482|0.23|168||1|1,027.00 $| ||421|0.13|1034||7|7,189.00 $| ||452|0.23|57||1|1,027.00 $| ||482|0.47|420||2|2,054.00 $| ||482|0.53|||1|1,027.00 $| |||||||| |||||0|22|| |||||||| |||||||| ||652|0|720||5|5,135.00 $| ||483|0.28|518||3|3,081.00 $| ||471|0.89|160||1|1,027.00 $| ||418|1.618|549||4|4,108.00 $| ||464|0.35|244||2|2,054.00 $| ||210|0.785|377|1||1,027.00 $| |||||||| |||||1|15|| |||||||| |||||||| ||611|0.49|79||1|1,027.00 $| ||418|0.13|277||2|2,054.00 $| ||220|0.13|273||2|2,054.00 $| ||210|0.63|18|1||1,027.00 $| ||210|0.36|155|1||1,027.00 $| ||210|0.23|91|1||1,027.00 $| ||230|0.36|184||1|1,027.00 $| ||620|1.6|212||1|1,027.00 $| |||||||| |||||3|7|| ||||||||

South Broadway - Between Garden St. and Laura Lane/Morgan Dr. 113 St. Pauls Lutherian Church (Church) 7404-7426 S. Broadway 10-395562 114 St. Pauls Lutherian Church (Rectory) 7420 S. Broadway 10-395562-0001 115 Church of St. Christopher 2 Garden St. 10-343617 116 Church of St. Christopher 7411 S. Broadway 10-334606 117 Gianakis, Robert 7407 S. Broadway 10-330601 118 ARKKC Holdings, LLC 7405 S. Broadway 10-328593 119 Red Hook Central School 7401 S. Broadway 10-317588 120 Wilms, Martin & Elizabeth Trustee 7396-7398 S. Broadway 10-338560 121 Red Hook Soap Factory, LLC 7392 S. Broadway 10-324546 122 St. Paul's School 7412 S. Broadway 10-376620 Subtotals Knollwood Commons 123 Knollwood Commons At Red Hook 27-33 Firehouse Lane 10-348506 124 Knollwood Commons At Red Hook 35-41 Firehouse Lane 10-365508 125 Knollwood Commons At Red Hook 11 Reilly Lane 10-348532 126 Knollwood Commons At Red Hook 12 Reilly Lane 10-348532 127 Knollwood Commons At Red Hook 13 Reilly Lane 10-348532 128 Knollwood Commons At Red Hook 14 Reilly Lane 10-348532 129 Knollwood Commons At Red Hook 15 Reilly Lane 10-348532 130 Knollwood Commons At Red Hook 16 Reilly Lane 10-348532 131 Knollwood Commons At Red Hook 17 Reilly Lane 10-348532 132 Knollwood Commons At Red Hook 18 Reilly Lane 10-348532 133 Knollwood Commons At Red Hook 22 Reilly Lane 10-348532 134 Knollwood Commons At Red Hook 23 Reilly Lane 10-348532 135 Knollwood Commons At Red Hook 24 Reilly Lane 10-348532 136 Knollwood Commons At Red Hook 25 Reilly Lane 10-348532 137 Knollwood Commons At Red Hook 26 Reilly Lane 10-348532 138 Knollwood Commons At Red Hook 27 Reilly Lane 10-348532 139 Knollwood Commons At Red Hook 28 Reilly Lane 10-348532 140 Knollwood Commons At Red Hook Water Meter ID 74090 10-348532 141 Knollwood Commons At Red Hook 32 Reilly Lane 10-348532 142 Knollwood Commons At Red Hook 34 Reilly Lane 10-348532 143 Knollwood Commons At Red Hook 36 Reilly Lane 10-348532 144 Knollwood Commons At Red Hook 38 Reilly Lane 10-348532 Subtotals

||620|11.48|199||1|1,027.00 $| ||210||210|1||1,027.00 $| ||620|1.3|234||2|2,054.00 $| ||210|0.48|150|1||1,027.00 $| ||210|0.4|150|1||1,027.00 $| ||210|0.396|10|1||1,027.00 $| ||465|0.794|241||1|1,027.00 $| ||483|0.57|244||2|2,054.00 $| ||485|1.27|104||1|1,027.00 $| ||620|0.64|231||2|2,054.00 $| |||||4|9|| |||||||| |||||||| |||||||| ||480|0.488|150||1|1,027.00 $| ||480|0.437|150||1|1,027.00 $| ||411|4.09|128||1|1,027.00 $| ||411|4.09|86||1|1,027.00 $| ||411|4.09|109||1|1,027.00 $| ||411|4.09|129||1|1,027.00 $| ||411|4.09|124||1|1,027.00 $| ||411|4.09|93||1|1,027.00 $| ||411|4.09|129||1|1,027.00 $| ||411|4.09|64||1|1,027.00 $| ||411|4.09|81||1|1,027.00 $| ||411|4.09|41||1|1,027.00 $| ||411|4.09|108||1|1,027.00 $| ||411|4.09|131||1|1,027.00 $| ||411|4.09|78||1|1,027.00 $| ||411|4.09|172||1|1,027.00 $| ||411|4.09|64||1|1,027.00 $| ||411|4.09|170||1|1,027.00 $| ||411|4.09|72||1|1,027.00 $| ||411|4.09|122||1|1,027.00 $| ||411|4.09|191||1|1,027.00 $| ||411|4.09|150||1|1,027.00 $| |||||0|22||

| BU - 2 | BU - 2 | BU - 2 | | Undeveloped Properties | Undeveloped Properties | Undeveloped Properties | | 10% of 1 EDU | 10% of 1 EDU | 10% of 1 EDU | | 1 Eckelman, Stephen and Marya | 1 Eckelman, Stephen and Marya | 1 Eckelman, Stephen and Marya | | S Broadway Rear | S Broadway Rear | S Broadway Rear | | 10-410710 | 10-410710 | 10-410710 | | 2 Staff, Christopher | 2 Staff, Christopher | 2 Staff, Christopher | | N Broadway | N Broadway | N Broadway | | 06-436822 | 06-436822 | 06-436822 | | 3 Key Bank | 3 Key Bank | 3 Key Bank | | W. Market St. | W. Market St. | W. Market St. | | 10-407720 | 10-407720 | 10-407720 | | 4 Methodist Church | 4 Methodist Church | 4 Methodist Church | | Church Street | Church Street | Church Street | | 10-373736 | 10-373736 | 10-373736 | | 5 Village of Red Hook | 5 Village of Red Hook | 5 Village of Red Hook | | 7475 S. Broadway | 7475 S. Broadway | 7475 S. Broadway | | 10-403700 | 10-403700 | 10-403700 | | 6 St. Pauls Lutheran Church & Cemetary | 6 St. Pauls Lutheran Church & Cemetary | 6 St. Pauls Lutheran Church & Cemetary | | 7412 S. Broadway | 7412 S. Broadway | 7412 S. Broadway | | 10-341571 | 10-341571 | 10-341571 | | 7 St. Pauls Lutheran Church & Cemetary | 7 St. Pauls Lutheran Church & Cemetary | 7 St. Pauls Lutheran Church & Cemetary | | 7412 S. Broadway | 7412 S. Broadway | 7412 S. Broadway | | 10-348581 | 10-348581 | 10-348581 | | 8 St. Pauls Lutheran Church & Cemetary | 8 St. Pauls Lutheran Church & Cemetary | 8 St. Pauls Lutheran Church & Cemetary | | Firehouse Lane | Firehouse Lane | Firehouse Lane | | 10-388518 | 10-388518 | 10-388518 | | 9 Lueck, Michael | 9 Lueck, Michael | 9 Lueck, Michael | | E. Market St | E. Market St | E. Market St | | 10-474721 | 10-474721 | 10-474721 | | 11 Keil Reality LLC | 11 Keil Reality LLC | 11 Keil Reality LLC | | 7536 N. Broadway | 7536 N. Broadway | 7536 N. Broadway | | Subtotal | Subtotal | Subtotal | | BU - 3 | BU - 3 | BU - 3 | | Red Hook Commons Phase 1 and 2 | Red Hook Commons Phase 1 and 2 | Red Hook Commons Phase 1 and 2 | | $6000 per year/Agreement | $6000 per year/Agreement | $6000 per year/Agreement | | 1 Red Hook Commons Apartments | 1 Red Hook Commons Apartments | 1 Red Hook Commons Apartments | | 11-15 Laura Lane | 11-15 Laura Lane | 11-15 Laura Lane | | 10-250565 | 10-250565 | 10-250565 | | 2 Red Hook Commons Apartments | 2 Red Hook Commons Apartments | 2 Red Hook Commons Apartments | | Laura Lane | Laura Lane | Laura Lane | | 10-263580 | 10-263580 | 10-263580 | | Subtotal | Subtotal | Subtotal | | BU - 4 | BU - 4 | BU - 4 | | Red Hook Commons Phase 3 Develope O&M Only | Red Hook Commons Phase 3 Develope O&M Only | Red Hook Commons Phase 3 Develope O&M Only | | 1 Morgan's Way LLC - Trustco Bank | 1 Morgan's Way LLC - Trustco Bank | 1 Morgan's Way LLC - Trustco Bank | | 4 Morgans Way | 4 Morgans Way | 4 Morgans Way | | 10-312583 | 10-312583 | 10-312583 | | Subtotal | Subtotal | Subtotal | | BU - 5 | BU - 5 | BU - 5 | | Red Hook Commons Phase 3 Undevelo No Charge | Red Hook Commons Phase 3 Undevelo No Charge | Red Hook Commons Phase 3 Undevelo No Charge | | 1 Kearney Development | 1 Kearney Development | 1 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-273554 | 10-273554 | 10-273554 | | 2 Kearney Development | 2 Kearney Development | 2 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-302574 | 10-302574 | 10-302574 | | 3 Kearney Development | 3 Kearney Development | 3 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-287598 | 10-287598 | 10-287598 | | 4 Kearney Development | 4 Kearney Development | 4 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-285569 | 10-285569 | 10-285569 | | 5 Kearney Development | 5 Kearney Development | 5 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-262591 | 10-262591 | 10-262591 | | 6 Kearney Development | 6 Kearney Development | 6 Kearney Development | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 10-273583 | 10-273583 | 10-273583 | | Subtotal | Subtotal | Subtotal | | BU - 6 | BU - 6 | BU - 6 | | WWTP | WWTP | WWTP | | No Charge | No Charge | No Charge | | 1 Kearney Development (WWTP) | 1 Kearney Development (WWTP) | 1 Kearney Development (WWTP) | | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | Laura Lane/Morgan Dr | | 09-205603 | 09-205603 | 09-205603 | | Subtotal | Subtotal | Subtotal | | Totals | Totals | Totals | | EDU Totals | EDU Totals | EDU Totals | | 293.9 | 293.9 | 293.9 | | Flow Totals, gpd | Flow Totals, gpd | Flow Totals, gpd | | 47,795 | 47,795 | 47,795 | | Revenue Totals | Revenue Totals | Revenue Totals | | 288,471.30 | 288,471.30 | 288,471.30 | | $ | $ | $ | |||||||||| |||||||||| ||||311|0.08|0||0.1|102.70 $| ||||311|0.574|150||0.1|102.70 $| ||||330|0.25|150||0.1|102.70 $| ||||311|0.1|0||0.1|102.70 $| ||||438|0.42|0||0.1|102.70 $| ||||311|0.48|150||0.1|102.70 $| ||||311|0.48|150||0.1|102.70 $| ||||311|1.25|150||0.1|102.70 $| ||||311|0.16|0||0.1|102.70 $| |||||||||- $| |||||||0|0.9|| |||||||||| |||||||||| |||||||||| ||||311|2.55|5000||12|$ 6,000.00| ||||411|2.42|5000||12|$ 6,000.00| |||||||0|24|| |||||||||| |||||||||| |||||||||| ||||462|0.44|100||1|311.00 $| |||||||0|1|| |||||||||| |||||||||| |||||||||| ||||311|0.24|150||0|- $| ||||311|0.23|150||0|- $| ||||311|0.33|150||0|- $| ||||311|0.33|150||0|- $| ||||311|0.33|150||0|- $| ||||311|0.31|150||0|- $| |||||||0|0|| |||||||||| |||||||||| ||||311|12.4|0||0|0| |||||||0|0|| ||||||47,795|35|258.9|288,471.30 $| |||||||||| ||EDU Totals|293.9||||||| ||Flow Totals, gpd|47,795||||||| ||Revenue Totals|288,471.30 $||||||| ||||||||||

Appendix I Operation and Maintenance Budget

2023/2024

VILLAGE OF RED HOOK

SEWER FUND

| Ordinary Income/Expense | ADOPTED 4-10-23 | Operations Only | | Revenue | 23/24 Budget | - | | ES2100 · Special Assessments- RH Commons | 12,000.00 | - | | ES2122 · Sewer Charges - Capital | 211,220.00 | - | | Sewer Charges - Operations | 91,745.00 | - | | ES2128 - Interest & Penalties Sewer Acct | 1,000.00 | - | | ES5031 · Interfund Transfers | 25,000.00 | - | | Total Revenue | 340,965.00 | - | | Gross Profit | 340,965.00 | - | | Expense | 10,000.00 | - | | 1710.1 · Admin-Personal Services | 30,000.00 | - | | 1710.4 · Admin Contractual | 1,000.00 | - | | 1910.4 · Unallocated Insurance | - | - | | 1920.41 · Postage | 500.00 | - | | 1920.42 · Office Supplies | 16,000.00 | - | | 8120.1 - Sanitary Sewer - Per Srv | 12,000.00 | - | | 8120.4 · Sanitary Sewers, Contr | 14,645.00 | - | | 8120.41 · Electrical Costs | 2,500.00 | - | | 8120.42 · Repairs & Maint | 2,000.00 | - | | 8120.43 · Lab Sampling | 500.00 | - | | 8120.44 · Supplies | - | - | | 8120.45 · Communications | 600.00 | - | | 8120.46 · SCA Software | 32,245.00 | - | | 8120,47 - Security System | 5,500.00 | - | | Total 8120.4 · Sanitary Sewers, Contr | 18,000.00 | - | | 8130.4 · Sewage Treatment Disposal, Cont | 4,500.00 | - | | 8130.43 · WWTP Sludge Removal | 28,000.00 | - | | 8130.44 - Grease Trap Pumping | 211,220.00 | - | | 8130,45 - Tank Pumping | - | - | | Total 8130.4 · Sewage Treatment Disposal, Cont | 12,000.00 | - | | G9710.6 - Sewer Principal | - | - | | G9710.7 - Sewer Interest | 340,965.00 | - | | USDA - Sewer Reserve | - | - | | 9901.9 · Transfer, Other Funds | - | - | | Total Expense | - | - | | Net Surplus/Deficit | - | - | ||ADOPTED 4-10-23 23/24 Budget|Current 22/23 Budget| ||12,000.00 211,220.00 91,745.00 1,000.00 25,000.00|12,000.00 68,800.00

25,000.00| ||340,965.00|105,800.00| ||340,965.00|105,800.00| | 10,000.00 | - | | 30,000.00 | 28,000.00 |

1,000.00-
500.00100.00
16,000.00-
12,000.0015,000.00
14,645.0010,500.00
2,500.002,500.00
2,000.001,000.00
500.00100.00
-500.00
600.00600.00
32,245.00
5,500.00
18,000.00
4,500.006,500.00
40,000.00
1,000.00
28,000.00
211,220.00

12,000.00 -|-

-| ||340,965.00|105,800.00| ||-|-|

4/21/2023

Appendix J Septic Tank Technical Data Sheets

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

Prelos[™] 1500 Processor

Selected Models

Applications

Orenco’s Prelos 1500 Processor provides complete, integrated storage, filtration, and pumping of wastewater for on-lot portions of Prelos Sewer systems and other pressurized liquid-only sewers or dispersal systems.

PRELOS1500-24, PRELOS1500-36, PRELOS1500-24-24, PRELOS1500-36-36

Product Code Diagram

− − PRELOS 1500

General

==> picture [220 x 118] intentionally omitted <==

----- Start of picture text -----

Optional secondary access riser height, in (mm): Blank = no secondary riser 36 = 36 (914) 18 = 18 (457) 48 = 48 (1219) 24 = 24 (610) 60 = 60 (1524) 30 = 30 (762) Access riser height, in (mm): 18 = 18 (457) 36 = 36 (914) 24 = 24 (610) 48 = 48 (1219) 30 = 30 (762) 60 = 60 (1524) Tank size, gal (L): 1500 = 1500 (5678) Prelos [™] Processor ----- End of picture text -----

The Prelos Processor is the core of the Prelos Sewer System: an innovative technology based on 40 years of proven sewer solutions. The tank stores and passively treats solid waste, while the patentpending pump vault and filter separate and pump liquid effluent.*

All Prelos 1500 Processors install as a unit, to reduce errors. The standard 30in (750mm) diameter access riser and optional additional 24in (600mm) diameter access riser provide easy access to the tank interior, and the passively self-cleaning filter can be removed without removing the pump vault, pump, or discharge assembly, simplifying O&M and keeping related costs down.

==> picture [351 x 363] intentionally omitted <==

* Tank covered under United States Patent #10,392,281

The Prelos 1500 Processor offers complete, integrated storage and pumping of wastewater in a simple, effective package.

All product and performance assertions are based on proper design, installation, operation, and maintenance according to Orenco’s current published documentation.

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 1 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

==> picture [256 x 597] intentionally omitted <==

----- Start of picture text -----

D E 7 13 6 14 12 10 2 8 9 A F 11 4 B Side view 15 6 14 12 10 11 9 5 13 8 4 4 C 2 1 3 6 15 Top view 1 Inlet 6 Access riser 11 Pump 2 Inlet tee 7 Access lid 12 Discharge assembly 3 Support column 8 Pump vault 13 ClickTight [™] 4 Baffle wall (full-length) 9 Biotube [®] filter 14 Discharge 5 Baffle pass-through 10 Float switch assembly 15 Lifting bracket ----- End of picture text -----

Tank, Riser, and Lid

The Prelos 1500 Processor’s meander-style tank has a patented design for superior performance. It’s tough, impact-resistant, and light enough to install with small equipment. The standard 30in (750mm) access riser, optional additional 24in (600mm) riser, and access lids are designed to provide strong, secure access to components inside of the Prelos 1500 Processor.

Materials of Construction

Materials of Construction
Access lidFiberglass, structural foam
Access lid hardwareStainless steel
Access riserFiberglass
Baffle wallsABS
Inlet, inlet teeABS
Support columnPVC, ABS
Tank bodyDCPD
Dimensions
A. Tank height, in(mm)72(1829)
B. Tank outside diameter, in(mm)105(2667)
C. Tank width, flat-to-flat, in(mm)101(2565)
D. Lid outside diameter, in(mm)33(838)
E. Riser inside diameter, in(mm)29.5(749)
F. Depth, nominal operatingvolume, in(mm)57(1448)
Optional secondary riser lid outside dia., in(mm)24(610)
Optional secondary riser inside dia., in(mm)23.5(597)
Tank nominal operatingvolume,gal(L)1500(5678)
Tank total volume,gal(L)1788(6768)
Average volume at operatingdepth,gal/in(L/mm)25(4)
Weight, nominal, lbs(kg)780-870(354-395)

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 2 of 6

Technical Data Sheet

==> picture [126 x 37] intentionally omitted <==

Pump Vault

The Prelos 1500 Processor’s patent-pending pump vault is designed to be passively self cleaning for reduced maintenance and service needs, with no need to remove the vault from the processor for cleaning.

Materials of Construction

Vault bodyPolyethylene
Vault Dimensionsin(mm)
A18.5(470)
B16.0(406)
C52.5(1334)
D15.75(400)

A Prelos pump vault, top view

Biotube Effluent Filter

The Prelos 1500 Processor’s Biotube effluent filter is designed for effective filtration of effluent and passive self cleaning for long maintenance cycle intervals.

Materials of Construction

Materials of Construction
End platesDCPD
Filter tubesPolypropylene
Handle assemblySch. 40 PVC
ScrewsStainless steel
Dimensionsin(mm)
A16.5(419)
B10.0(254)
Performance
Biotube mesh opening, in(mm)*0.125(3)
Total filter flow area, ft2 (m2)4.0(0.37)
Total filter surface area, ft2 (m2)14.0(1.3)

*0.062in (1.6mm) filter mesh available

B A C Biotube filter cartridge, top view D B Prelos pump vault, Prelos pump vault, Biotube filter side-cutaway view front view cartridge, side view

==> picture [111 x 87] intentionally omitted <==

Biotube filter cartridge, front view

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 3 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

4in (100mm) Effluent Pump

HDA-Series Discharge Assembly

Pumps used in Prelos 1500 Processors are Orenco’s PF-Series pumps. They’re field-serviceable with common tools and, in internal testing, have a minimum 24hr run-dry capability (liquid end) with no deterioration in pump life or performance. These pumps are equipped with Type SOOW 600V power cords (suitable for Class I, Division 1 and 2 applications); they also meet UL requirements and are CSA certified to US and Canadian safety standards for effluent pumps.

Discharge assemblies used in Prelos 1500 Processors are designed for durability and ease of maintenance.

Materials of Construction

Anti-siphon valveSch. 80 PVC, EPDM, stainless steel
Discharge nippleSch. 80 PVC
Flexible hoseReinforced EPDM
Flow control discSch. 80 PVC
Hose fittings, tee fitting, mountingscrewsStainless steel
In-line check valveSch. 80 PVC, EPDM, stainless steel
MountingplateABS
Quick-disconnect
WorkingPressures and Dimensions
Unit workingpressure, psi(kPa)
Height, mountingplate, in(mm)
Width, mountingplate, in(mm)
Diameter, discharge nipple, in*Glass-filled thermoplastic
150(1034)
7(178)
7(178)
1.25
Diameter, flow control disc orifice, in(mm)0.25(6.35)

Materials of Construction

ConnectorGlass-filled thermoplastic, siliconeGlass-filled thermoplastic, silicone
DiffusersGlass-filled PPO
DischargeGlass-filled polypropylene
Discharge bearingEngineered thermoplastic(PEEK)
ImpellersAcetal
Intake screensPolypropylene
LubricantDeionized water, propyleneglycol
Suction connection, drive shaft,
Stainless steel
coupling, shell
Specifications
Nom. flow,Length,Weight,
DischargeImpellers
gpm(L/sec)in(mm)lb(kg)
in, nominal
10(0.6)23(584)26(12)
1.256
Performance
hpDesignRated
Min liquid level,
(kW)flow ampscycles/day
in(mm)*
0.5(0.37)12.7300
16(406)

* Contact your Orenco distributor about fittings to connect discharge assemblies to metric-sized piping.

==> picture [243 x 356] intentionally omitted <==

----- Start of picture text -----

6 8 11 5 7 9 10 4 3 1 Hose barb 2 Crimp sleeve 3 Flexible hose 4 Hose clamp 5 Tee fitting 6 Anti-siphon valve 7 In-line check valve 8 Quick-disconnect, male 9 Quick-disconnect, female 2 10 Mounting plate 11 Discharge nipple 1 ----- End of picture text -----

* Minimum liquid level is for a single pump installed in a pump vault. Pump Curve

This graph shows the pump’s performance range and the relationship between flow (gpm) and pressure (TDH).

==> picture [218 x 213] intentionally omitted <==

----- Start of picture text -----

300 Prelos™ 1500 pump 240 180 120 60 0 3 6 9 12 15 Flow in gallons per minute (gpm) Total dynamic head (TDH) in feet ----- End of picture text -----

HDA-Series discharge assembly

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 4 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

Float Switches

ClickTight

Orenco’s ClickTight provides secure, moisture-resistant cable connections between the pump, float switches, and control panel in the Prelos 1500 Processor. ClickTight is UL-listed for the US and Canada.

Float switches used in Prelos 1500 Processors are UL-listed and CSA-certified for use in water or sewage. To simplify accessing and servicing, the float switch assembly has been incorporated into the Biotube filter handle.

Materials of Construction

Materials of Construction

CablePVC/nylon, annealed copper; Type TC
ConnectorsGlass-filled thermoplastic, silicone
FastenerStainless steel
HousingABS
O-ringBuna-N
PottingcompoundUrethane
Specifications
Cable rating14 AWG; 3 conductor; UL TC-ER 600V (pump)
18 AWG; 2-8 conductor; UL TC-ER 600V(float)
Float switch connectors2 pole
Pump connector3 pole
Maximum cable length, ft(m)62(19)
Materials of Construction
ClickTight connectorGlass-filled thermoplastic, silicone
Float collarABS
Float cordFlexible 2 conductor (UL, CSA) SJOW; CPE cord
jacket with EPDM insulated conductors
Float housingImpact-resistant, noncorrosive polypropylene for
use in liquids up to 140˚F(60˚C)
Float Switch Specifications
FloatState
Type
PNormally open
Mechanical

==> picture [166 x 278] intentionally omitted <==

----- Start of picture text -----

3 2 Float switch/Biotube filter assembly 1 ----- End of picture text -----

==> picture [198 x 127] intentionally omitted <==

----- Start of picture text -----

4 5 6 3 1 2 1 ----- End of picture text -----

  • 1 Float input connector

  • 2 Pump input connector

  • 3 ClickTight housing

  • 4 Stainless steel fastener

  • 5 Mounting flange

  • 6 Cable

ClickTight

1 Float switch

  • 2 Float switch cord

  • 3 Float switch connector

ClickTight mechanical float switch

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 5 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

==> picture [252 x 148] intentionally omitted <==

----- Start of picture text -----

3 1 5 6 2 7 4 ----- End of picture text -----

S1HR Control Panel

The Prelos 1500 Processor uses Orenco’s S1HR control panel, which is ideal for Prelos Sewers and other effluent sewer applications.

Materials of Construction

EnclosureUV-resistant fiberglass, UL Type 4X
HingesStainless steel
Dimensions,in(mm)
Height11.5(292)
Width9.3(236)
Depth5.4(137)
Specifications
Panel ratings
  1. Motor-start contactor|120VAC, 1hp(0.75kW), 16A, single-phase, 60Hz 16 FLA, 1hp(0.75kW), 60Hz; 2.5 million cycles at FLA| |2. Circuit breakers|120VAC, 10A, single-pole (control)| ||120VAC, 20A, single-pole(pump)| |3. Toggle switch|Single-pole, double-throw HOA switch| |4. Audio alarm|95dB at 24in (600mm), warble-tone sound, UL Type 4X 6| |5. Redundant|120VAC, DIN rail mounted; provides a secondary| |high-on relay|pump-on signal duringhigh-level conditions| |6. Audio alarm|120VAC, automatic reset, DIN rail mount| |silence relay|| |7. Visual alarm|7⁄8in (22mm) diameter red lens, “push-to-silence,”| ||120VAC LED, UL Type 4X|

1 Motor-start contactor

  • 2 Circuit breakers

  • 3 Toggle switch

  • 4 Audio alarm

  • 5 Redundant high-on relay

  • 6 Audio alarm silence relay

  • 7 Visual alarm

S1HR control panel

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-LOS-4 Rev. 2 © 02/22 Page 6 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

Prelos™ 1000 Processor

Applications

Orenco’s Prelos[™] 1000 Processor provides complete, integrated storage, filtration, and pumping of wastewater for on-lot portions of Prelos Sewer Systems and other pressurized, liquid-only sewers or dispersal systems.

General

The Prelos 1000 Processor is the core of the Prelos Sewer System: an innovative technology based on 40 years of proven sewer solutions. The tank stores and passively treats solid waste, while the patent-pending pump vault and filter separate and pump liquid effluent.*

The Prelos 1000 Processor installs as a unit, to reduce errors. Components are easy to access and service. The passively self-cleaning filter can be removed without removing the pump vault, pump, or discharge assembly, simplifying O&M and keeping related costs down.

Standard Model

PRELOS1000-18, PRELOS1000-24, PRELOS1000-30, PRELOS1000-36, PRELOS1000-48, PRELOS1000-60

Product Code Diagram

==> picture [54 x 9] intentionally omitted <==

----- Start of picture text -----

PRELOS 1000− ----- End of picture text -----

==> picture [106 x 81] intentionally omitted <==

----- Start of picture text -----

Access riser height, in. (mm) 18 = 18 (457) 24 = 24 (610) 30 = 30 (762) 36 = 36 (914) 48 = 48 (1219) 60 = 60 (1524) Tank size, gal. (L) 1000 = 1000 (3785) Prelos [™] Processor ----- End of picture text -----

* Tank covered under United States Patent #10,392,281

==> picture [406 x 350] intentionally omitted <==

The Prelos™ 1000 Processor offers complete, integrated storage and pumping of wastewater in a simple, effective package.

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 1 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

==> picture [84 x 24] intentionally omitted <==

----- Start of picture text -----

C D ----- End of picture text -----

Tank, Riser, and Lid

The Prelos 1000 Processor’s meander-style tank has a patented design for superior performance. It’s tough, impact-resistant, and light enough to install with small equipment. The single access riser and access lid are designed to provide strong, secure access to components inside of the Prelos 1000 Processor.

==> picture [247 x 216] intentionally omitted <==

----- Start of picture text -----

7 13 6 14 12 8 2 10 A 9 E 11 4 B Side view ----- End of picture text -----

Materials of Construction

Materials of Construction
Access lidFiberglass, structural foam
Access lid hardwareStainless steel
Access riserFiberglass
Inlet and inlet teeABS
Baffle wallABS
Support columnPVC, ABS
Tank bodyDCPD
Dimensions
A. Tank height, in.(mm)61(1549)
B. Tank outside diameter, in.(mm)96(2438)
C. Lid outside diameter, in.(mm)33(838)
D. Riser inside diameter, in.(mm)29.5(749)
E. Depth, nominal operatingvolume, in.(mm)48(1219)
Tank nominal operatingvolume,gal.(L)1000(3785)
Tank total volume,gal.(L)1220(4618)
Average volume at operatingdepth,gal./in.(L/mm)20(3)
Prelos Processor weight, nom., lbs(kg)600-690(272-313)

==> picture [251 x 305] intentionally omitted <==

----- Start of picture text -----

14 15 12 11 10 9 13 8 3 4 5 2 1 6 15 Top view 1 Inlet 6 Access riser 11 Pump 2 Inlet tee 7 Access lid 12 Discharge assembly 3 Support column 8 Pump vault 13 ClickTight™ 4 Baffle wall (full-length) 9 Biotube [®] filter 14 Discharge 5 Baffle pass-through 10 Float switch assembly 15 Lifting bracket ----- End of picture text -----

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 2 of 6

Technical Data Sheet

==> picture [126 x 37] intentionally omitted <==

Biotube[®] Filter

Pump Vault

The Prelos 1000 Processor’s Biotube[®] filter is designed for effective filtration of effluent and passive self-cleaning for long cleaning intervals.

The Prelos 1000 Processor’s patent-pending pump vault is designed to be passively self-cleaning for reduced maintenance and service needs, with no need to remove the filter from the processor for cleaning.

Materials of Construction

Materials of Construction

Materials of Construction
End platesDCPD
Filter tubesPolypropylene
Handle assemblySch. 40 PVC
ScrewsStainless steel
Dimensionsin.(mm)
A16.31(414)
B10.0(254)
Performance
Biotube®mesh opening, in.(mm)*0.125(3)
Total filter flow area, ft2 (m2)3.75(0.35)
Total filter surface area, ft2 (m2)13.5(1.25)
Materials of ConstructionMaterials of Construction
Vault body
Polyethylene
Vault Dimensions
in.(mm)
A18.5(470)
B14.56(370)
C52.5(1334)
D16.94(430)
A
Prelos™ pump vault,
top view

*0.062-in. (1.6-mm) filter mesh available

==> picture [499 x 368] intentionally omitted <==

----- Start of picture text -----

Prelos [™] pump vault, top view A B Biotube [®] filter C cartridge, top view B Biotube filter Biotube filter cartridge, side view cartridge, front view D Prelos pump vault, Prelos pump vault, side-cutaway view front view ----- End of picture text -----

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 3 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

4-in. (100-mm) Effluent Pump

Discharge Assembly

Prelos 1000 Processors use Orenco’s PF-Series 4-in. (100-mm) effluent pumps. They’re field-serviceable with common tools and have a minimum 24-hour run-dry capability (liquid end) with no deterioration in pump life or performance, in internal testing. These pumps are equipped with Type SOOW 600-V power cords (suitable for Class I, Division 1 and 2 applications); they also meet UL requirements and are CSA-certified to U.S. and Canadian safety standards for effluent pumps.

Prelos 1000 Processors use Orenco’s HDA-Series discharge assemblies for durability and ease of maintenance.

Materials of Construction

Anti-siphon valveSch. 80 PVC, EPDM, stainless steel
Discharge nippleSch. 80 PVC
Flexible hoseReinforced EPDM
Flow control discSch. 80 PVC
Hose fittings, tee fitting, mountingscrewsStainless steel
In-line check valveSch. 80 PVC, EPDM, stainless steel
MountingplateABS
Quick-disconnect
WorkingPressures and Dimensions
Unit workingpressure, psi(kPa)
Height, mountingplate, in.(mm)
Width, mountingplate, in.(mm)
Diameter, discharge nipple, in.(mm)Glass-filled thermoplastic
150(1034)
7(178)
7(178)
1.25(32)
Diameter, flow control disc orifice, in.(mm)0.25(6.35)

Materials of Construction

ConnectorGlass-filled thermoplastic, siliconeGlass-filled thermoplastic, silicone
DiffusersGlass-filled PPO
DischargeGlass-filled polypropylene
Discharge bearingEngineered thermoplastic(PEEK)
ImpellersAcetal
Intake screensPolypropylene
LubricantDeionized water, propyleneglycol
Suction connection, drive shaft,
Stainless steel
coupling, shell
Specifications
Nom. flow,Length,Weight,
DischargeImpellers
gpm(L/sec)in.(mm)lb(kg)
in., nominal1
10(0.6)23(584)26(12)
1.256
Performance
hpDesignRated
Min liquid level,
(kW)flow ampscycles/day
in.(mm) 2
0.5(0.37)12.7300
16(406)

==> picture [243 x 356] intentionally omitted <==

----- Start of picture text -----

6 8 11 5 7 9 10 4 3 1 Hose barb 2 Crimp sleeve 3 Flexible hose 4 Hose clamp 5 Tee fitting 6 Anti-siphon valve 7 In-line check valve 8 Quick-disconnect, male 9 Quick-disconnect, female 2 10 Mounting plate 11 Discharge nipple 1 ----- End of picture text -----

1 Consult your Orenco Distributor about fittings to connect discharge assemblies to metric-sized piping.

2 Minimum liquid level is for a single pump installed in a pump vault.

Pump Curve

This graph gives a representation of the pump’s performance range and the relationship between flow (gpm or L/sec) and pressure (TDH).

==> picture [196 x 190] intentionally omitted <==

----- Start of picture text -----

300 PF-Series 10-gpm (0.6 L/sec) pumps 240 10-gpm pump 180 120 10-gpm pump with ¼-in. flow control 60 0 3 6 9 12 15 Flow in gallons per minute (gpm) Total dynamic head (TDH) in feet ----- End of picture text -----

PF-Series 10-gpm pump curve

Discharge assembly – HDA-series

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 4 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

ClickTight[™]

Float Switches

Orenco’s ClickTight[TM] provides secure, moisture-resistant cable connections between the pump, float switches, and control panel in the Prelos 1000 Processor. ClickTight is UL-listed for the US and Canada.

Float switches used in Prelos 1000 Processors are UL-listed and CSAcertified for use in water or sewage.

To simplify accessing and servicing, the float switch assembly has been incorporated into the Biotube[®] filter handle.

Materials of Construction

CablePVC/nylon, annealed copper; Type TC
ConnectorsGlass-filled thermoplastic, silicone
FastenerStainless steel
HousingABS
O-ring
PottingcompoundBuna N
Urethane
Specifications
Cable rating
Float switch connectors14 AWG; 3-conductor; UL TC-ER 600V (Pump)
18 AWG; 2-8 conductor; UL TC-ER 600V(Float)
2-pole
Pump connector3-pole

Materials of Construction

ClickTight connectorGlass-filled thermoplastic, silicone
Float collarABS
Float cordFlexible 2-conductor (UL, CSA) SJOW; CPE cord
jacket with EPDM insulated conductors
Float housingImpact-resistant, noncorrosive polypropylene for
use in liquids up to 140˚ F(60˚ C)

Float Switch Specifications

FloatStateType
PNormally openMechanical

==> picture [166 x 278] intentionally omitted <==

----- Start of picture text -----

3 2 Float Switch/Biotube [®] Filter Assembly 1 ----- End of picture text -----

Maximum cable length, ft (m) 62 (19)

==> picture [198 x 127] intentionally omitted <==

----- Start of picture text -----

4 5 6 3 1 2 1 ----- End of picture text -----

  • 1 Float input connector

  • 2 Pump input connector

  • 3 ClickTight housing

  • 4 Stainless steel fastener

  • 5 Mounting flange

  • 6 Cable

ClickTight[™]

1 Float switch

  • 2 Float switch cord

  • 3 Float switch connector

ClickTight[™] mechanical float switch

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 5 of 6

==> picture [126 x 37] intentionally omitted <==

Technical Data Sheet

==> picture [252 x 148] intentionally omitted <==

----- Start of picture text -----

3 1 5 6 2 7 4 ----- End of picture text -----

S1HR Control Panel

The Prelos 1000 Processor uses Orenco’s S1HR control panel, which is ideal for Prelos Sewers and other effluent sewer applications.

Materials of Construction

EnclosureUV-resistant fiberglass, UL Type 4X
HingesStainless steel
Dimensions,in.(mm)
Height11.5(292)
Width9.3(236)
Depth5.4(135)
Specifications
Panel ratings
  1. Motor-start contactor|120 VAC, 1 hp(0.75 kW), 16 A, 1-phase, 60 Hz 16 FLA, 1 hp(0.75 kW), 60 Hz; 2.5 million cycles at FLA| |2. Circuit breakers|120 VAC, 10 A, single-pole, control| ||120 VAC, 20 A, single-pole, pump| |3. Toggle switch|Single-pole, double-throw HOA switch| |4. Audio alarm|95 dB at 24 in. (600 mm), warble-tone sound, UL Type 4X 6| |5. Redundant|120 VAC, DIN rail mounted; provides a secondary| |high-on relay|pump-on signal duringhigh-level conditions| |6. Audio alarm|120 VAC, automatic reset, DIN rail mount| |silence relay|| |7. Visual alarm|7⁄8-in. (22-mm) diameter red lens, “push-to-silence,”| ||120 VAC LED, UL Type 4X|

1 Motor-start contactor

  • 2 Circuit breakers

  • 3 Toggle switch

  • 4 Audio alarm

  • 5 Redundant high-on relay

  • 6 Audio alarm silence relay

  • 7 Visual alarm

S1HR control panel

Orenco Systems[®] • 800-348-9843 • +1 541-459-4449 • www.orenco.com

NTD-EPS-1 Rev. 8 © 09/20 Page 6 of 6

Appendix K Cost Estimates

Project Name: Village of Red Hook WWTP

Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Phase 2 Collection System

Conceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection System
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
1Services
1.14" GravityPVC Sewers2000LF$60.00$20.00$80.00$160,000.00
1.21250-Gallon ST112EA$7,000.00$3,000.00$10,000.00$1,120,000.00
1.32500-Gallon ST25EA$9,000.00$3,000.00$12,000.00$300,000.00
1.43000-Gallon ST5EA$11,000.00$5,000.00$16,000.00$80,000.00
1.55000-Gallon ST3EA$15,000.00$5,000.00$20,000.00$60,000.00
1.6Greast Trap4EA$10,000.00$5,000.00$15,000.00$60,000.00
1.71.5" Lateral Pipe8000LF$30.00$20.00$50.00$400,000.00
1.8Lateral Connections145EA$600.00$200.00$800.00$116,000.00
1.9Shut off with Check Valve145EA$1,250.00$300.00$1,550.00$224,750.00
$2,520,750.00
2Sewers
2.12" HDPE FM11100LF$42.00$20.00$62.00$688,200.00
2.23" HDPE FM5400LF$48.00$20.00$68.00$367,200.00
2.34" HDPE FM4400LF$60.00$20.00$80.00$352,000.00
2.46" HDPE FM1250LF$80.00$30.00$110.00$137,500.00
$1,544,900.00
3Manholes
3.1Air/Vaccuum Relief MH10EA$8,000.00$3,000.00$11,000.00$110,000.00
3.2FlushingConnections20EA$1,700.00$3,000.00$4,700.00$94,000.00
$204,000.00
4Pumps
4.1Simplex Pumps112EA$4,000.00$1,000.00$5,000.00$560,000.00
4.2Duplex Pumps32EA$10,000.00$2,000.00$12,000.00$384,000.00
4.3Electrical145EA$2,000.00$2,000.00$4,000.00$580,000.00
4.4Spare Parts1LS$75,000.00$75,000.00$75,000.00
$1,599,000.00
5Site Work
5.1Asphalt Driveways1LS$100,000.00$100,000.00$200,000.00$200,000.00
5.2Gravel Driveways1LS$50,000.00$50,000.00$100,000.00$100,000.00
5.3TopSoil and Seed1LS$100,000.00$100,000.00$200,000.00$200,000.00
5.4Test Pits150EA$500.00$500.00$1,000.00$150,000.00
$650,000.00

Project Name: Village of Red Hook WWTP Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection SystemConceptual Cost Opinion Phase 2 Collection System
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
6General Condition
6.1Insurance & Bonds1LS$100,000.00$100,000.00$100,000.00
6.2Mobilization1LS$100,000.00$100,000.00$100,000.00
6.3PM & General Condition1LS$250,000.00$250,000.00$250,000.00
$450,000.00
Cost Summary
2024 Construction Cost Subtotal
2026 Construction Cost Subtotal (8% increase/year)
15% Engineering
20% Contingancy
Project Costs
$6,968,650.00
8,128,000.00
$
1,219,200.00
$
1,625,600.00
$
10,972,800.00
$

Project Name: Village of Red Hook WWTP

Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBR
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
1Packaged MBR with UV
1.1170,000gpd MBR Plant1LS$1,300,000.00$50,000.00$1,350,000.00$1,350,000.00
1.2Start Up1LS$10,000.00$20,000.00$30,000.00$30,000.00
1.3Excavation,fill,backfill133CY$25.00$25.00$50.00$6,666.67
1.4Concrete Slab44CY$1,200.00$1,300.00$2,500.00$111,111.11
$1,497,777.78
2Concrete Tanks
2.150,000 Gal EQTank Walls86CY$1,200.00$1,800.00$3,000.00$256,666.67
2.240,000 Gal Sludge Tank Walls54CY$1,200.00$1,800.00$3,000.00$163,333.33
2.345,000 Gal Aeration Tank Walls54CY$1,200.00$1,800.00$3,000.00$163,333.33
2.4Excavation,fill,backfill1111CY$25.00$25.00$50.00$55,555.56
2.5Common Concrete Slab74CY$1,200.00$1,300.00$2,500.00$185,185.19
$824,074.07
3Yard Piping& Site Work
3.1Yard Piping1LS$100,000.00$50,000.00$150,000.00$150,000.00
3.2Sie Work1LS$30,000.00$60,000.00$90,000.00$90,000.00
$240,000.00
4Electrical Work
4.1Site Electical1LS$100,000.00$50,000.00$150,000.00$150,000.00
4.2Equipment Electrical1LS$50,000.00$50,000.00$100,000.00$100,000.00
4.3Gear1LS$10,000.00$10,000.00$20,000.00$20,000.00
4.4Generator and ATS1LS$60,000.00$25,000.00$85,000.00$85,000.00
4.5Controls1LS$10,000.00$10,000.00$20,000.00$20,000.00
$375,000.00
5General Condition
5.1Insurance & Bonds1LS$60,000.00$60,000.00$60,000.00
5.2Mobilization1LS$10,000.00$50,000.00$60,000.00$60,000.00
5.3PM & General Condition1LS$450,000.00$450,000.00$450,000.00
$570,000.00
Cost Summary

2024 Construction Cost Subtotal $3,506,851.85

Project Name: Village of Red Hook WWTP Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 190,000 GPD MBR

IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
2026 Construction Cost Subtotal (8% increase/year)
15% Engineering
20% Contingancy
Project Costs4,090,000.00
$
550,000.00
$
818,000.00
$
5,458,000.00
$

Project Name: Village of Red Hook WWTP

Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBR

Conceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBR
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
1Packaged MBR with UV
1.1250,000gpd MBR Plant1LS$2,700,000.00$100,000.00$2,800,000.00$2,800,000.00
1.2Start Up1LS$10,000.00$20,000.00$30,000.00$30,000.00
1.3Excavation,fill,backfill889CY$25.00$25.00$50.00$44,444.44
1.4Concrete63CY$1,200.00$1,300.00$2,500.00$157,407.41
$3,031,851.85
2Concrete Tanks
2.185,000 Gal EQTank Walls113CY$1,200.00$1,800.00$3,000.00$338,333.33
2.390,000 Gal Aeration Tank Walls86CY$1,200.00$1,800.00$3,000.00$256,666.67
2.4Excavation,fill,backfill1389CY$25.00$25.00$50.00$69,444.44
2.5Common Concrete Slab148CY$1,200.00$1,300.00$2,500.00$370,370.37
$1,034,814.81
3Convert EA to Sludge HoldingTanks
3.1Demo1LS$20,000.00$60,000.00$80,000.00$80,000.00
3.2Piping1LS$10,000.00$30,000.00$40,000.00$40,000.00
$120,000.00
4Yard Piping& Site Work
3.1Yard Piping1LS$120,000.00$60,000.00$180,000.00$180,000.00
3.2Sie Work1LS$40,000.00$80,000.00$120,000.00$120,000.00
$300,000.00
5Electrical Work
4.1Site Electical1LS$100,000.00$50,000.00$150,000.00$150,000.00
4.2Equipment Electrical1LS$60,000.00$60,000.00$120,000.00$120,000.00
4.3Gear1LS$10,000.00$10,000.00$20,000.00$20,000.00
4.4Generator and ATS1LS$80,000.00$30,000.00$110,000.00$110,000.00
4.5Controls1LS$15,000.00$15,000.00$30,000.00$30,000.00
$430,000.00
6General Condition
5.1Insurance & Bonds1LS$80,000.00$80,000.00$80,000.00
5.2Mobilization1LS$10,000.00$50,000.00$60,000.00$60,000.00
5.3PM & General Condition1LS$550,000.00$550,000.00$550,000.00
$690,000.00
Cost Summary

Project Name: Village of Red Hook WWTP Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 250,000 GPD MBR
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
2024 Construction Cost Subtotal
2026 Construction Cost Subtotal (8% increase/year)
15% Engineering
20% Contingancy
Project Costs
$5,486,666.67
6,400,000.00
$
850,000.00
$
1,280,000.00
$
8,530,000.00
$

Project Name: Village of Red Hook WWTP

Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBR

Conceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBR
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
1Packaged MBR with UV
1.1250,000gpd MBR Plant3LS$2,700,000.00$100,000.00$2,800,000.00$8,400,000.00
1.2Start Up3LS$10,000.00$20,000.00$30,000.00$90,000.00
1.3Excavation,fill,backfill2667CY$25.00$25.00$50.00$133,333.33
1.4Concrete189CY$1,200.00$1,300.00$2,500.00$472,222.22
$9,095,555.56
2Concrete Tanks
2.185,000 Gal EQTank Walls338CY$1,200.00$1,800.00$3,000.00$1,015,000.00
2.390,000 Gal Aeration Tank Walls257CY$1,200.00$1,800.00$3,000.00$770,000.00
2.4Excavation,fill,backfill4167CY$25.00$25.00$50.00$208,333.33
2.5Common Concrete Slab444CY$1,200.00$1,300.00$2,500.00$1,111,111.11
$3,104,444.44
3Convert EA to Sludge HoldingTanks
3.1Demo2LS$20,000.00$60,000.00$80,000.00$160,000.00
3.2Piping2LS$10,000.00$30,000.00$40,000.00$80,000.00
$240,000.00
4Yard Piping& Site Work
3.1Yard Piping3LS$120,000.00$60,000.00$180,000.00$540,000.00
3.2Sie Work3LS$40,000.00$80,000.00$120,000.00$360,000.00
$900,000.00
5Electrical Work
4.1Site Electical3LS$100,000.00$50,000.00$150,000.00$450,000.00
4.2Equipment Electrical3LS$60,000.00$60,000.00$120,000.00$360,000.00
4.3Gear3LS$10,000.00$10,000.00$20,000.00$60,000.00
4.4Generator and ATS3LS$80,000.00$30,000.00$110,000.00$330,000.00
4.5Controls3LS$15,000.00$15,000.00$30,000.00$90,000.00
$1,290,000.00
6General Condition
5.1Insurance & Bonds3LS$80,000.00$80,000.00$240,000.00
5.2Mobilization3LS$10,000.00$50,000.00$60,000.00$180,000.00
5.3PM & General Condition3LS$550,000.00$550,000.00$1,650,000.00
$2,070,000.00
Cost Summary

Project Name: Village of Red Hook WWTP Project# : 23-2861 Date: 6/5/2024 Prepared By: R. Flores

==> picture [99 x 62] intentionally omitted <==

Delaware Engineering, D.P.C.

Conceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBRConceptual Cost Opinion Upgrade Existing WWTP by adding 750,000 GPD MBR
IDDescriptionQuantityUnitsMaterialsLaborUnit CostTotal Unit CostSubtotals
2024 Construction Cost Subtotal
2026 Construction Cost Subtotal (8% increase/year)
15% Engineering
20% Contingancy
Project Costs
$16,460,000.00
19,199,000.00
$
3,000,000.00
$
3,839,800.00
$
26,038,800.00
$

Appendix L WWTP Upgrade Alternative Drawings

==> picture [1710 x 942] intentionally omitted <==

----- Start of picture text -----

W W W W W W W W W W W W W W W W W W W W W W W W W W SAN ST UGTUEUE W W W W W W W W W W W W W W W W W W W W W W W W W W W W ST ST ST W W UE SAN panelpanel powercontrol SERVICE ZONESERVICE ZONE ELECTRICALELECTRICAL SODIUMCITRICCITRIC HYPOACIDACID transformer CITRIC ACID MEMBRANES MAINTENANCE AREA BACKWASH TANK ELECTRICAL SERVICE ZONE control panel ELECTRICAL SERVICE ZONE power panel vfd vfd MEMBRANE BLOWERS W W W SAN W W SERVICE ZONEELECTRICAL ALUM CAUSTIC ----- End of picture text -----

ST

SHEET: F8

BAR SCALE 30 0 15 30 60

1 inch = ft.30

==> picture [1710 x 942] intentionally omitted <==

----- Start of picture text -----

W W W W W W W W W W W W W W W W W W W W W W W W W W SAN ST UGTUEUE W W W W W W W W W W W W W W W W W W W W W W W W W W W W ST ST ST W W UE SAN panelpanel powercontrol SERVICE ZONESERVICE ZONE ELECTRICALELECTRICAL SODIUMCITRICCITRIC HYPOACIDACID transformer CITRIC ACID MEMBRANES MAINTENANCE AREA BACKWASH TANK ELECTRICAL SERVICE ZONE control panel ELECTRICAL SERVICE ZONE power panel vfd vfd MEMBRANE BLOWERS W W W SAN W W SERVICE ZONEELECTRICAL ALUM CAUSTIC ----- End of picture text -----

ST

SHEET: F9

BAR SCALE 30 0 15 30 60 1 inch = ft.30

==> picture [2303 x 1495] intentionally omitted <==

----- Start of picture text -----

BAR SCALE 30 0 15 30 60 1 inch = ft.30 SHEET: F10 ST W W W W W W W W W W W W W W W W W W W W W W W W W W SAN ST UGTUEUE W W W W W W W W W W W W W W W W W W W W W W W W W W W W ST ST ST W W UE SAN RF 6/5/2024 23-2835 : DATE: DRAWN BY: SCALE: REVIEWED BY PROJECT NO.: FILE: panelpanel powercontrol SERVICE ZONESERVICE ZONE ELECTRICALELECTRICAL SODIUMCITRICCITRIC HYPOACIDACID transformer CITRIC ACID MEMBRANES MAINTENANCE AREA BACKWASH TANK ELECTRICAL SERVICE ZONE control panel ELECTRICAL SERVICE ZONE power panel vfd vfd MEMBRANE BLOWERS DELAWARE ENGINEERING, D.P.C. CIVIL AND ENVIRONMENTAL ENGINEERING 28 MADISON AVENUE EXTENSION, ALBANY, NY 12203 - 518.452.1290 55 SOUTH MAIN ST, ONEONTA, NY 13820 - 607.432.8073 16 EAST MARKET ST, RED HOOK, NY 12571 - 518.452.1290 548 BROADWAY, MONTICELLO, NY 12701 - 845.791.7777 223 MAIN ST, GOSHEN, NY 10924 - 518.452.1290 W W W REVISIONS MBR 750,000 GPD PROPOSED ALTERNATE SAN SAN W W SERVICE ZONEELECTRICAL ALUM CAUSTIC ----- End of picture text -----

==> picture [584 x 579] intentionally omitted <==

----- Start of picture text -----

panel power SERVICE ZONE ELECTRICAL panel control SERVICE ZONE ELECTRICAL transformer AREA MEMBRANES MAINTENANCE TANK BACKWASH vfd vfd ELECTRICAL SERVICE ZONE ----- End of picture text -----

==> picture [7 x 259] intentionally omitted <==

----- Start of picture text -----

H:\DRAWINGS\RED HOOK\WWTP\FIGURES\FIGURE - 11.DWG6/5/24 ----- End of picture text -----

SHEET: F11

Appendix M Proposed Service Area and Collection

System Map

==> picture [756 x 956] intentionally omitted <==

----- Start of picture text -----

Expanded Collection System Upgrade WWTP with MBR to Increase Capacity Recommended Alternatives ----- End of picture text -----

==> picture [756 x 956] intentionally omitted <==

----- Start of picture text -----

Expanded Collection System Upgrade WWTP with MBR to Increase Capacity Recommended Alternatives ----- End of picture text -----

Village of Red Hook, Dutchess County, NY Original Sewer Use Area Proposed Sewer Line Proposed Extension

Ü

0 500 1,000 2,000 3,000 4,000 Feet Prepared by: Delaware Engineering, DPC Date: May 2024 Google, New York State, Maxar, Microsoft Sources: Dutchess County RPS

Appendix N Engineering Report Certification

Engineering Report Certification

To Be Provided by the Professional Engineer Preparing the Report

During the preparation of this Engineering Report, I have studied and evaluated the cost and effectiveness of the processes, materials, techniques, and technologies for carrying out the proposed project or activity for which assistance is being sought from the New York State Clean Water State Revolving Fund. In my professional opinion, I have recommended for selection, to the maximum extent practicable, a project or activity that maximizes the potential for efficient water use, reuse, recapture, and conservation, and energy conservation, taking into account the cost of constructing the project or activity, the cost of operating and maintaining the project or activity over the life of the project or activity, and the cost of replacing the project and activity.

Village of Red Hook WWTP Upgrade and STEP Sewer System Phase 2 Title of Engineering Report: Date of Report: Professional Engineer’s Name: Robert Flores, P.E.

Signature:

Date:

Effective 10/1/2015

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one: