Red Hook WatchIndependent Community Resource

Appendix N: Engineering Report Certification

1 versions2024-06-10attached document

Versions

  1. 12024-06-10

Document

Appendix N Engineering Report Certification

Engineering Report Certification

To Be Provided by the Professional Engineer Preparing the Report

During the preparation of this Engineering Report, I have studied and evaluated the cost and effectiveness of the processes, materials, techniques, and technologies for carrying out the proposed project or activity for which assistance is being sought from the New York State Clean Water State Revolving Fund. In my professional opinion, I have recommended for selection, to the maximum extent practicable, a project or activity that maximizes the potential for efficient water use, reuse, recapture, and conservation, and energy conservation, taking into account the cost of constructing the project or activity, the cost of operating and maintaining the project or activity over the life of the project or activity, and the cost of replacing the project and activity.

Village of Red Hook WWTP Upgrade and STEP Sewer System Phase 2 Title of Engineering Report: Date of Report: Professional Engineer’s Name: Robert Flores, P.E.

Signature:

Date:

Effective 10/1/2015

Referenced by

These other documents cite or incorporate this one: