Agency Use Only [IfApplicable] Project : Phase II Village Sewer System Date :

Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance

Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact.

Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance.

Reasons Supporting This Determination:

To complete this section:

  • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size or extent of an impact.

  • Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact and any additional environmental consequences if the impact were to occur.

  • The assessment should take into consideration any design element or project changes.

  • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact.

  • Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact

  • • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result.

  • Attach additional sheets, as needed.

No impacts have been identified that will have a moderate to large impact on the environment for the reasons set forth in the attached Notice of Determination of Significance.

Determination of Significance - Type 1 and Unlisted Actions

|SEQR Status: �Type 1 �

Unlisted
Identify portions of EAF completed for this Project:�
Part 1
Part 2
Part 3

FEAF 2019

Upon review of the information recorded on this EAF, as noted, plus this additional support information Engineering Report dated June 20, 2024, with attachments, SHPO letter of No Effect dated August 29, 2024

and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the Village of Red Hook Village Board

as lead agency that:

� A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued.

� B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions which will be required by the lead agency:

There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).

� C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued.

Name of Action: Village of Red Hook WWTP and STEP Sewer System Upgrade – Phase II

Name of Lead Agency: Village of Red Hook Village Board

Name of Responsible Officer in Lead Agency: Karen Smythe

Title of Responsible Officer: Mayor

Signature of Responsible Officer in Lead Agency:

Date: September 9, 2024

Signature of Preparer (if different from Responsible Officer) Date:

For Further Information:

Contact Person: Lindsay Ostrander Allen, Delaware Engineering, DPC Address: 28 Madison Avenue Extension Telephone Number: 518-452-1290 E-mail: lallen@delawareengineering.com

For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:

Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html

PRINT FULL FORM

Page 2 of 2

Changes between versions

2012-02-062012-02-06
substantive change+1513

The document title, project date, and supporting documentation have been updated.

  • Title changed from 'Full Environmental Assessment Form — Village of Red Hook WWTP and STEP Sewer System Upgrade Phase II' to 'Full Environmental Assessment Form – Phase II Village Sewer System'
  • Signature date advanced from 'August 5, 2024' to 'September 9, 2024'
  • Added supporting documentation: 'Engineering Report dated June 20, 2024, with attachments, SHPO letter of No Effect dated August 29, 2024'
  • Revised determination reasoning from a reference to a previously adopted notice to 'reasons set forth in the attached Notice of Determination of Significance'
Show red-line diff
**Agency Use Only [IfApplicable]** Project : Phase II Village Sewer System Date : ## _**Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance**_ Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance. ## **Reasons Supporting This Determination:** To complete this section: - Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size or extent of an impact. - Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact and any additional environmental consequences if the impact were to occur. - The assessment should take into consideration any design element or project changes. - Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. - Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact - • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result. - Attach additional sheets, as needed. No impacts have been identified that will have a moderate to large impact on the environment. See NEGATIVE DECLARATION, NOTICE OF DETERMINATION OF SIGNIFICANCE, adopted on August 5, 2024 byfor the Villagereasons set forth in the attached Notice of RedDetermination Hookof Village BoardSignificance. **Determination of Significance - Type 1 and Unlisted Actions** |SEQR Status:|<br>�Type 1<br>� <br>|Type 1|�|Unlisted|||||| |---|---|---|---|---|---|---|---|---|---| |Identify portions of EAF completed for this Project:|||� <br>|Part 1|� <br>|Part 2|� <br>|Part 3|| ||||||||||| |||||||||| FEAF 2019| Upon review of the information recorded on this EAF, as noted, plus this additional support information Engineering Report dated June 20, 2024, with attachments, SHPO letter of No Effect dated August 29, 2024 and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the ## Village of Red Hook Village Board as lead agency that: � A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. � B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions which will be required by the lead agency: There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)). � C. This Project may result in one or more significant adverse impacts on the environment, and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued. Name of Action: Village of Red Hook WWTP and STEP Sewer System Upgrade – Phase II Name of Lead Agency: Village of Red Hook Village Board Name of Responsible Officer in Lead Agency: Karen Smythe Title of Responsible Officer: Mayor Signature of Responsible Officer in Lead Agency: Date: AugustSeptember 59, 2024 Signature of Preparer (if different from Responsible Officer) Date: ## **For Further Information:** Contact Person: Lindsay Ostrander Allen, Delaware Engineering, DPC Address: 28 Madison Avenue Extension Telephone Number: 518-452-1290 E-mail: lallen@delawareengineering.com ## **For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to:** Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html **PRINT FULL FORM** Page **2** of **2**