Red Hook WatchIndependent Community Resource

Red Hook WWTP Water Quality Lab Report — June 30, 2025

1 versions2025-07-14attached document

Versions

  1. 12025-07-14

Document

==> picture [109 x 51] intentionally omitted <==

Experience is the solution

314 North Pearl Street  Albany, New York 12207 (800) 848-4983  (518) 434-4546  Fax (518) 434-0891

July 01, 2025

Robert Flores Delaware Engineering 28 Madison Avenue Ext. Albany, NY 12203

Work Order No: 250630048

TEL: (518) 452-1290

RE: Red Hook WWTP

Red Hook

Adirondack Environmental Services, Inc received 3 samples on 6/30/2025 for the analyses presented in the following report.

Please see case narrative for specifics on analysis.

If you have any questions regarding these tests results, please feel free to call.

Sincerely,

ELAP#: 10709

==> picture [116 x 43] intentionally omitted <==

Matthew Daigneault Laboratory Manager

Page 1 of 5

Adirondack Environmental Services, Inc

CASE NARRATIVE

Delaware Engineering Red Hook WWTP Red Hook

Date: 01-Jul-25 Lab WorkOrder: 250630048

Sample containers were supplied by Adirondack Environmental Services.

Definitions - RL: Reporting Limit DF: Dilution factor

Qualifiers:ND : Not Detected at reporting limitC: CCV below acceptable Limits
J: Analyte detected below quantitation limitC+: CCV above acceptable Limits
B: Analyte detected in BlankS: LCS Spike recovery is below acceptable limits
X : Exceeds maximum contamination limitS+: LCS Spike recovery is above acceptable limits
H: Hold time exceededZ: Duplication outside acceptable limits
N: Matrix Spike below acceptable limitsT : Tentatively Identified Compound-Estimated
N+: Matrix Spike is above acceptable limitsE :Above quantitation range-Estimated

Note : All Results are reported as wet weight unless noted

The results relate only to the items tested. Information supplied by the client is assumed to be correct.

Page 2 of 5

Adirondack Environmental Services, Inc

Date: 01-Jul-25

AdirondackEnvironmental SEnvironmental Services,IncDate: 01-Jul-25Date: 01-Jul-25Date: 01-Jul-25
CLIENT:Delaware EngineeringClient Sample ID: Traditions Garden
Work Order:250630048Collection Date: 6/30/2025 12:35:00 PM
Reference:Red Hook WWTP / RedHookLab Sample ID: 250630048-001
PO#:Matrix: DRINKING WATER
AnalysesResultRLQualUnitsDate Analyzed
DF
SM 9223B(-04)COLILERTAnalyst: AF
( Prep: -6/30/2025)
Total ColiformNegative06/30/2025 3:50:00 PM
1
Escherichia coliNegative06/30/2025 3:50:00 PM
1

Page 3 of 5

Adirondack Environmental Services, Inc

Date: 01-Jul-25

AdirondackEnvironmental SEnvironmental Services,IncDate: 01-Jul-25Date: 01-Jul-25Date: 01-Jul-25
CLIENT:Delaware EngineeringClient Sample ID: 3 Cambridge
Work Order:250630048Collection Date: 6/30/2025 12:21:00 PM
Reference:Red Hook WWTP / RedHookLab Sample ID: 250630048-002
PO#:Matrix: DRINKING WATER
AnalysesResultRLQualUnitsDate Analyzed
DF
SM 9223B(-04)COLILERTAnalyst: AF
( Prep: -6/30/2025)
Total ColiformNegative06/30/2025 3:50:00 PM
1
Escherichia coliNegative06/30/2025 3:50:00 PM
1

Page 4 of 5

Adirondack Environmental Services, Inc

Date: 01-Jul-25

AdirondackEnvironmental SEnvironmental Services,IncDate: 01-Jul-25Date: 01-Jul-25Date: 01-Jul-25
CLIENT:Delaware EngineeringClient Sample ID: ABRAHA MS Park
Work Order:250630048Collection Date: 6/30/2025 12:10:00 PM
Reference:Red Hook WWTP / RedHookLab Sample ID: 250630048-003
PO#:Matrix: DRINKING WATER
AnalysesResultRLQualUnitsDate Analyzed
DF
SM 9223B(-04)COLILERTAnalyst: AF
( Prep: -6/30/2025)
Total ColiformNegative06/30/2025 3:50:00 PM
1
Escherichia coliNegative06/30/2025 3:50:00 PM
1

Page 5 of 5

Changes between versions

2025-02-102025-02-10
substantive change+010

The document was significantly reduced, removing reports for the Village Green Committee, the Sewer Department, and the Sewer Department's audit/RFP updates.

  • Title changed from 'Village Green Committee Monthly Report — January 2025' to 'Sewer Department Monthly Report — January 2025'
  • Removed 'Village Green Committee Monthly Report — January 2025' section entirely
  • Removed 'Village of Red Hook Y Sewer Department Monthly Report — 1 January 2025' section, including details regarding the WWTP audit, priority lists, and the RFP for water systems
Show red-line diff
Village of Red Hook ~ Village Green Committee ~ Monthly Report ’ ' January 2025 Spring Planting planning is underway, if you are interested in having trees planted, please reach out. We are looking to add trees to any of our village streets so if you are out and about a see an open space maybe in front of new or old businesses you can send those suggestions to us as well. We are actively recruiting members. If you are interested in giving back to your community but don’t have a lot of time to give this may be the perfect committee for you! Village of Red Hook Y Sewer Department ' Monthly Report ‘ 1 January 2025 In January we worked hard to continue to address the issues that the WWTP has been having. We had received our report back from the Audit that had been scheduled the previous month. Unfortunately, there were several areas of concern, even after the “food dump” in December, that came out of the audit. The audit was thorough and documented many facets of the state of the wastewater treatment plant, processes in place, etc. Based on the report from the project manager we worked on a priority list and slowly have been working to rectify and fix each area we can as quickly as possible – some of which is on an operational standpoint and others are mechanical. Systems had been down and are waiting on parts to fix completely. Additionally, as we think about the expansion, we been working with the Senior Project Manager to provide detailed SOPs for our Wastewater Treatment Operator to follow. The Board also voted to send out an RFP for our WWTP and our Water systems. We continue to have conversations at the department level of what makes the most sense. Additionally, mid-January the team met with a representative from New York Rural Water Association who has experience with sewer code and functionality of WWTPs in general. We are seeking out the experts in the field to continue to help guide us in this endeavor. We are sympathetic to the concerns that this under operating plant has caused and that is why we are actively working to try to fix and repair what has been done and to implement process along that way to hopefully prevent this from happening again. We meet every other Friday. If you have concerns about the expansion and/or are currently in the Sewer Use Area and have comments, concerns, etc. please do not hesitate to reach out. There is also the expression of interest form up on our website if you are wanting to connect into the sewer (capacity required). It will put you on our list of places to consider and puts you on our radar. Village of Red Hook Y Speed Limit Initiative ' Monthly Report ‘1 January 2025 ‘ We are waiting to hear back from the Engineering team about tackling a portion of the report around the School Zone separately from the overall Village speed limit so that we can move forward. Village of Red Hook ~ Town of Red Hook Greenway and Trails Committee ’ Monthly Report ’ ' January 2025 The meeting met on the second Thursday of the month at Town Hall. The committee picked up where it had left off in November continuing to discuss signage along the trails, new blazing projects with Winnakee Land Trust, as well as wanting to collaborate to create alternative or safer pathways into the village from the neighborhoods just next to it. Village of Red Hook i Climate Smart Communities Monthly Report ‘ 1 January 2025 We tabled at the recent Repair Café announcing that the Compost program will be launching soon. This had a lot of community engagement and residents seem to be excited about this program coming directly to the Village Center.
2025-02-102025-02-10
clerical+00

The document title was shortened to remove the 'Y' prefix.

  • Title changed from 'Sewer Department Monthly Report — January 2025' to 'Speed Limit Initiative Monthly Report — January 2025'
Show red-line diff
We meet every other Friday. If you have concerns about the expansion and/or are currently in the Sewer Use Area and have comments, concerns, etc. please do not hesitate to reach out. There is also the expression of interest form up on our website if you are wanting to connect into the sewer (capacity required). It will put you on our list of places to consider and puts you on our radar. Village of Red Hook Y Speed Limit Initiative ' Monthly Report ‘1 January 2025 ‘ We are waiting to hear back from the Engineering team about tackling a portion of the report around the School Zone separately from the overall Village speed limit so that we can move forward. Village of Red Hook ~ Town of Red Hook Greenway and Trails Committee ’ Monthly Report ’ ' January 2025 The meeting met on the second Thursday of the month at Town Hall. The committee picked up where it had left off in November continuing to discuss signage along the trails, new blazing projects with Winnakee Land Trust, as well as wanting to collaborate to create alternative or safer pathways into the village from the neighborhoods just next to it. Village of Red Hook i Climate Smart Communities Monthly Report ‘ 1 January 2025 We tabled at the recent Repair Café announcing that the Compost program will be launching soon. This had a lot of community engagement and residents seem to be excited about this program coming directly to the Village Center.

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

  • 2025-03-312025 03 31 Date of Noncompliance Report 2025 05 30
    — pins a specific version of this chain
    Two separate environmental reports on the same facility at different dates; one is a noncompliance notice (March 31) and the other is a lab report (July 14), each a distinct board document.
  • 2025-05-01May 2025 Sewer Report
    — pins a specific version of this chain
    Document B is a separate lab report on a specific facility dated June 30, 2025, which Document A (a general May sewer report) likely references or incorporates as supporting documentation.
  • 2025-06-01June 2025 Sewer Report
    — pins a specific version of this chain
    Document B is a separate lab report on the Red Hook WWTP dated June 30, 2025, which Document A (June 2025 Sewer Report) likely references or incorporates as supporting documentation, but they are distinct artifacts.
  • 2025-06-052025 06 05 Date of Noncompliance Report 2025 07 22
    — pins a specific version of this chain
    Document A is a noncompliance report dated June 5 with a July 22 reference date; Document B is a separate lab report from June 30 on the same facility—they are distinct documents that likely reference each other but occupy different slots (reporting noncompliance vs. providing technical lab analysis).
  • 2025-07-01July 2025 Sewer Report
    — pins a specific version of this chain
    Document B is a separate lab report on a specific facility dated June 30 that Document A (a general July sewer report) likely references or incorporates, but they are distinct artifacts.
  • 2025-03-312025 03 31 Date of Noncompliance Report 2025 04 30
    Two separate monitoring/reporting documents on the same facility at different time periods; one is a noncompliance notice (March 31) and the other is a lab report (July 14), each serving distinct reporting slots.
  • 2025-04-01April 2025 Sewer Report
    Document B is a separate lab report on a specific facility dated June 30, 2025, while Document A is a general April 2025 sewer report; they share a topic area but are distinct artifacts produced 104 days apart.

Recurring pattern

These other chains use the same template but are separate decisions: