==> picture [91 x 43] intentionally omitted <==
----- Start of picture text -----
7467 South %,- Village of ofRed 3} at pronametstal 05/03/2022 ----- End of picture text -----
7467 South Broadway, Red Hook, New York 12571 Village of ofRed Hook Water & Wastewater Treatment
Consulting
| * We believe theTSS result was a lab error. all other compliance criteria met* | * We believe theTSS result was a lab error. all other compliance criteria met* | ||
|---|---|---|---|
| WaterSystem | WastewaterSystem | ||
| WaterSystemNotes: ThePFOA/PFOS, 1,4Dioxanesampleswerecollectedfromeach well | WastewaterSystemNotes: SampleresultsforMarch2022, withreportingsubmittedonor | ||
| withbelowregulatory limitresults. Wearecurrentlyworking withDelawareEngineering | before April28th2022. | ||
| to tryandgetreducedmonitoringrequirements. | |||
| Allmonthlycoliform testswerecompleted | RequiredSamples | ||
| Result | |||
| Compliance | |||
| withnopresenceofcolifarmare.coli | |||
| Milonthly TotalColiform | cBOD | ||
| <4.0 | |||
| UsedforUOD | |||
| TkN | |||
| 5.7 | |||
| calculation | |||
| ; | |||
| ; | |||
| 4thquarterPFOA/PFOS, 1,4Dioxane | |||
| Special Samples | |||
| Testingcompletedandcamebackwith | |||
| Satisfactoryresults. |
March 2022
UOD "UlimateOxygenDemand" ~—s-_«31,65 34mg/L Tss 30 10mg/L NHI 0.78 1.81mg/L FecalColiform <1.0 200/100mL
||Deficiencies||Deficiencies| |Weil9Vent Well3PressureGauge|Scheduledforweekof05/09 Scheduledforweekof05/09|AnoxicMixers|Curvently2 Mediansmixerogeetokeepsreetanksolids moving. Mayneed toconsiderthis in futureupdates.| |Weill15NumberPlacard|information hasbeensentforsign tobemade.|5AberREST|SandFiltershaveneverbeenrebuiltormediareplaced. Should| |WeilControlIssues|Wellcontrolsneedtobeevaluatedascommunication issues||priceandscheduleforthenearfuture.| ||have occurred. Delaware Engineering ispresenting tonew||| ||Mayor.|TrainDownforReview|Oneprocess train isdownforreviewofdeficiencies. Reviewto becompleted thisweekandsentforreview,| |Town/Villageinterconnect|—-2020 testindicated thiswas nota viable optionforVillage flowincaseofemergency. Engineeringreviewcurrentlyin place.|BlowerSystemMaintenance |pumpStation|partshavebeenordered. Waitingforoil& belts. PumpStationpumpscloggingissueshave been anissuefor some time. PumpStationmixingshouldbeimplementedtahelp| ||||withpumpfailure andpumpstationpumpouts,| |WeillLevel/Flow|Welllevelmonitors have been reviewedwith avarietyof repairs thatwererequired. Currentlylookingatoptionsfor communication to wells 14& 15 as thereis ashortin wiring||BackflowPrev. Replacement|FacilitiesbackflowPreventorinneedofreplacement.| ||between theplantandthe wells||| |Storage TankInspections|Allstorage tanks have been inspectedandareawaiting||| ||report,|||