Red Hook WatchIndependent Community Resource

2 2022

1 versions2022-02-01working document

Versions

  1. 12022-02-01
    working document

Document

==> picture [227 x 53] intentionally omitted <==

----- Start of picture text -----

7467 South Broadway, Red Hook, New York 12571 4%i” Village ofRed Hook Water & Wastewater Treatment 3] mtireusmnental 04/05/2022 Consulting ----- End of picture text -----

Water System

Wastewater System

==> picture [489 x 330] intentionally omitted <==

----- Start of picture text -----

Water Systern Notes:The PFOA/PFOS,1,4 Dioxane samples were collectedfrom each wellWastewaterSystem Notes:Sample resultsfor February 2022,with reporting submitted
with below regulatorylimit results.We are currently workingwith Delaware Engineeringorbefore March 28th 2022.
totry and get reduced monitoringrequirements.
All monthly coliformtests were completedRequiredSamplesResultCompliance
Monthly Total Coliformwithithno presence afcaliformcolifor e. colicBOD<4.0Used for UOD
TKN11calculation.
February 2022UOD“Ulimate Oxygen Demand"=~—-<10,.9534 mg/L
.4thquarter5PFOA/PFOS,1,4 DioxanemsTSS610 mg/L
Special SamplesTesting completed and came back withNH3
Satisfactoryresults.0.61.81 mg/L
Fecal Coliform<1.0200/100 mL
DeficienciesDeficiencies
WellWeil 39 Vent Pressure GaugeScheduledScheduledforfor week week of of04/1004/10Anoxic MixersCurrentlymoving.iMayants needmixerto consider inaethis to inifutureAnon updates. tank solids
Wellid>Number PlacardInformation has been sentfor signto be made.
Sond Filter RebuildSand Filters have never beenrebuilt or media replaced.Should
Well Control IssuesWell controls need to be evaluated as communication issuesprice and schedule for the nearfuture.
haveoccurred.DelawareEngineeringis presentingto new
Mayor.Train Down for ReviewOne processtrainis down for review ofdeficiencies.Review to
be completedthisweek and sent forreview.
BlowerSystem Maintenanceparts have been ordered,Waiting for oil & belts.
Town/VillageInterconnect2020test indicatedthiswas not aviableoption forVillage
flow in case ofemergency.Engineering review currently inpump StationPump Station pumpscloggingissues have been an issue
place.some time.Pump Station mixing should be implemented to help
with pump failure and pumpstation pumpouts.
Weill Level/FlowWeilllevel monitorshavebeenreviewedwithavariety of
repairs that were required.Currently looking at optionsforBackflow Prev.ReplacementFacilities backflow Preventor in need ofreplacement.
communicationtowells 14 &15asthereisa short inwiring
betweenthe plant and thewells
StorageTankinspectionsAll storagetanks havebeeninspected and are awaiting
report.