Red Hook WatchIndependent Community Resource

5 2022

1 versions2022-05-01working document

Versions

  1. 12022-05-01
    working document

Document

==> picture [215 x 50] intentionally omitted <==

----- Start of picture text -----

7467 South Broadway, Red Hook, New York 12571 ihh Village ofRed Hook Water & Wastewater Treatment 3h ivoeaurntal 07/08/2022 Consulting ----- End of picture text -----

Water System

Wastewater System

==> picture [462 x 315] intentionally omitted <==

----- Start of picture text -----

Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collectedfrom each well | [Wastewater][ System][ Notes:] [Sample][ results][ for][ May][ 2022,] [with] [reporting][ submitted][ on] [or] with below regulatory limit results. We are currently working with Delaware Engineering | before June 28th 2022. te try and get reduced monitoring requirements. All monthly coliform tests were completed iz Required Samples Result Compliance Monthly Total Coliform with no presence ofcoliform or e. coli May Zo22 CBOD <4.0 vsegfer | 2 UOD "Ulimate Oxygen Demand" <13.6 34 mg/L ihe TKN 17 calculation Specialp SamplesPI NH3TSS 1110 1.8110 mg/L mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies WellWell 93 Pressure Vent Gauge ScheduledScheduled forfor weekweek of07/11 of 07/11 Anoxic Mixers moving.eeMayerr need meeto consideroethisto inaefuturene updates.= solids Well 15 Number Placard Information has been sentfor sign to be made. ancl Fler Robutet Sand Filters have never been rebuilt or media replaced. Should Well Contro! Issues Well contrals need to be evaluated as communication issues price and schedule for the near future. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance parts have been ordered. Waiting for oil & belts. Town/Village interconnect 2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in |Pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Well Level/Flow Well fevel monitors have been reviewed with a variety of repairs that were required. Currently looking at optionsfor | Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to wells 14 & 15 as there is a short in wiring between the plant and the wells Storage Tank inspections All storage tanks have been inspected and are awaiting report. For Future Notes: ----- End of picture text -----

Recurring pattern

These other chains use the same template but are separate decisions: