Village of Red Hook SEWER DEPARTMENT REPORT
August 2025
H2O Innovation Operation & Maintenance LLC has completed their first full month as our Water & Wastewater Operator. We had an operational meeting on August 20[th] where we reviewed sewer operations. We discussed a list of equipment and supplies needed for the Sewer plant.
H2O did a safety audit of the plants. We were waiting for the report. We discussed the various reporting sites, such as NY Alert, Dutchess County DRIP, DMR, where we are in the process of updating to the new operator. We reviewed lab companies. The longer term “temporary” surge tank has been installed on a concrete pad on site. We discussed some adjustments that have been made to optimize the pump sizes for best function.
For the “old plant” or Plant 1B, a pump is going to be installed in the EQ tank to allow for better management of the flow. Now that the biology or “bugs” are growing, there is a need to maintain the right amount which means sometimes the excess needs to be “wasted”. With the added pump in the EQ tank, that will allow for wasting to occur. The backwash procedure at the sand filters is being adjusted. Currently both filters are backwashed at the same time. If they were done separately, that would enable the plant to manage the flow better. Also the West side aeration tank is waiting for a valve so that the return activated sludge can function on this side. The East side is currently handling all the flow.
We discussed asking Rural Water if they could help us with an asset management plan. We are scheduled to begin this process with them in mid-November.
The first test report in August was in full compliance with our SPDES permit. The full second report has not yet been received. Fecal coliform (the only results received so far) is in compliance for both plants.
We received no odor complaints that tied to the WWTP in the month of August.