Red Hook WatchIndependent Community Resource

11 2021 November 4th Q

1 versions2021-11-01working document

Versions

  1. 12021-11-01
    working document

Document

==> picture [11 x 20] intentionally omitted <==

----- Start of picture text -----

t ----- End of picture text -----

7467VillageSouth ofRedBroadway,Hook WaterRed Hook, & WastewaterNew York 12571 Treatment

==> picture [118 x 16] intentionally omitted <==

----- Start of picture text -----

Sete Date: 12/01/2021 ----- End of picture text -----

Consulting

==> picture [489 x 347] intentionally omitted <==

----- Start of picture text -----

Water SystemWastewater System
Water System Notes:The PFOA/PFOS,1,4 Dioxane sampleswere collectedfrom each well[Wastewater][ System][ Notes:][4th][Quarter][ samples][ due by][ December][ 31st.]
with below regulatorylimitresults.We arecurrentlyworkingwithDelawareEngineering
totry and get reduced monitoring requirements.
All monthly coliformtests were completed,RequiredSamplesResultCompliance
Monthly Total ColiformTraditions,along withwith a 4th na presence of sample collectedcoliformfrom or e.BODTSSDueS mg/La!
cali4th QuarterRequiredby10 mg/L
3rddPFOA/PFOS,1,4DI°uepecmie
Special SamplesTestingquarter completed with satisfactory,1,4DioxaneFecal Coliform31st300/100/100mmL
results
DeficienciesDeficlencles
Wellwell3 Pressure ventGaugeDownwardWell 3 Pressurefacing Gauge vent required needsto be per replacedDOH,per DOHAnoxic Mixerssolidspba moving. -geeMayaneed—to considerpsacrededthis inacfuture sod updates.eo
Welle15eamNumberPlOdWell:15needs afelnew numberberplacardplper DOH..
Sand Filter RebuildSand Filters have never been rebuilt or media replaced.
Well Control IssuesWell controls need to be evaluated as communication issuesShould price and schedulefor the nearfuture.
haveoccurred.DelawareEngineeringis presentingtonew
Mayor.Train Downfor ReviewOne processtrainis down for review of deficiencies,Review
ta be completedthis week and sentfor review.
Blower System MaintenanceProcess blowers are long overduefor maintenance.Belts
Town/Village Interconnect—-2020 test indicatedthis was nat a viable option forVillageand oils should be purchased for preventativemaintenance.
flow in case of emergency.Engineering review currently inPump StationPump Station pumps clogging issues have been an issuefor
place.some time,Pump Station mixing should be implemented to
helpwith pump failure and pumpstation pumpouts.
Well Level/FlowWell level monitors have been reviewed withavariety of
repairs that were required.Currently looking at optionsforBackflow Prev.ReplacementFacilities backflow Preventor in need ofreplacement.
communicationto wells 14 & 15 as there is a shart inwiringPumpStation PumpFailure
betweenthe plant and thewellsP"PPump Station pump and check vaive have been replaced.
StorageTank inspectionsAll steragetanks have been inspected and areawaitingPump StatianLawncarePump stationin Need of weedwhacking.DoesVillage
report.request C3ND to complete orVillage personne!
For Future Notes:

----- End of picture text -----

References

This document cites or incorporates the following separate documents:

Recurring pattern

These other chains use the same template but are separate decisions: