Red Hook WatchIndependent Community Resource

Water & Wastewater Treatment Compliance Report — December 6, 2022

1 versions2022-12-12attached document

Document

Village of Red Hook Water & Wastewater Treatment

7467 South Broadway, Red Hook, New York 12571

12/06/2022

==> picture [512 x 346] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: Wastewater System Notes: Sample results for October 2022, with reporting submitted on or before November 28th 2022. All monthly coliform tests were completed Required Samples Result Compliance Monthly Total Coliform with no presence of coliform or e. coli BOD <4.0 October 2022 TSS 2.2 10 mg/L NH3 5.5 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies Well controls need to be evaluated as communication issues Well Control Issues have occurred. Delaware Engineering is presenting to new Anoxic Mixers Currently a Medora mixer in place to keep Anoxic tank solids Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow moving. May need to consider this in future updates. in case of emergency. Engineering review currently in place. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for Sand Filters have never been rebuilt or media replaced. Should communication to wells 14 & 15 as there is a short in wiring price and schedule for the near future. between the plant and the wells Sand Filter Rebuild Storage Tank Inspections All storage tanks have been inspected and are awaiting report. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sent for review. Blower System Maintenance Parts have been ordered. Waiting for oil & belts. Pump Station Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. For Future Notes: ----- End of picture text -----

Changes between versions

2025-10-062025-10-06
substantive change+014

Food waste/compost program section removed from the report.

  • Entire 'VILLAGE FOOD WASTE/COMPOST PROGRAM' section deleted, including details on Sept 1 operations launch, Sept 6 purchase of 80 countertop pails for $1,462.40, Sept 24 branding discussion with Deputy Mayor Kjarval, and Sept 30 bin pickup and distribution
Show red-line diff
Trustee Uku Monthly Report for September 2025 Oct 6, 2025 ## VILLAGE GREEN COMMITTEE - Fall Planting Day is now tentatively scheduled for **Saturday, November 8th at 9am.** - The Village’s Fall Tree Order has been placed with Schichtel’s Nursery. Please see attached invoice. - The following are locations confirmed for planting: 2 Fraleigh St 9 Fraleigh St 41 Fraleigh St 78 Fraleigh St 7488 S. Broadway 7369 S. Broadway 63 E. Market 35 Benner Rd Firehouse Lane **francesuku@redhookvillage.gov** ||SCHICHTEL’S NURSERY, INC.|SCHICHTEL’S NURSERY, INC.||||||ACKNOWLEDGMENT|ACKNOWLEDGMENT|| |---|---|---|---|---|---|---|---|---|---|---| |SCHICHTELS<br>7420PETERSROAD * SPRINGVILLE,NY14141<br>PEMICHTEL'S<br>saLes/SHIPPING: (716)592-9383 *FAX(716)|||14141<br>(716)592-4282||||||ORDERNO. _——PAGENO.|| ||||PRT|DATE:|9/15/25|||0/00/00|0029819|1| |sg<br>H<br>p|ATTN:<br>FRANCES UKU<br>VILLAGE OF RED HOOK DPW<br>TREE DELIVERY ADDRESS:|||917-744-6512<br>CustoMerR.O./ORDER<br>FALL 2025|||||ORDERDATE<br>9/15/25|| |:<br>o|52<br>FIREHOUSE<br>LN<br>RED HOOK|NY 12571||||es||||| ||||||NET|30<br>DAYS||||| |||||||||JIM KISKER||| ||||||||||SALESMAN|| |Fy<br>.<br>L<br>7<br>O|ATTIN: FRANCES UKU<br>VILLAGE OF RED HOOK<br>VILLAGE GREEN<br>7467 S. BROADWAY<br>RED HOOK|NY 12571||917-744-6512<br>EQUALOPPORTUNITYEMPLOYER<br>Your order to be processed upon receipt of<br>a signed copy of this acknowledgment in our<br>office. Please sign and fax this acknowledgment<br>back to us at 716-592-4282.||||||| ||DELIVERED|||||||||| ||HYDROGEL<br>& BAG|||||||||| ||DELIVERY CHARGE|||||||500.00|500.00|| ||2 AMELANCHIER<br>'ROBIN HILL PINK'!||i|if2"||B.R.||129.00|258.00|| ||2 AMELANCHIER<br>'SPRING|FLURRY'|1|ig]ae||BR.||129.00|258.00|| ||2 CARPINUS CAROL.'FIRE|KING'|1,|1/2"||BYR.||129.00|258.00|| ||2<br>CORNUS<br>FL.'CHEROKEE|BRAVE!|15|GAL||CONT||186.00|3:7<br>2;.00|| ||1CORNUSMAS||Lea|||B.R.||129.00|129.00|| Purchaser hereby agrees to purchase and Seller hereby agrees to sell the items listed above at the prices shown only in accordance with the terms and provisions set forth on the reverse side hereof. Purchaser X yg TOTAL $1,775.00 Trustee Uku Monthly Report for September 2025 Oct 6, 2025 ## VILLAGE FOOD WASTE/COMPOST PROGRAM Operations began on Sept 1, 2025. Early subscribers received the following invitation to the program’s soft launch: On Sept 6, we placed an order for 80 countertop food waste pails at the wholesale rate provided by Amelia Legare of O Zone Red Hook. The total purchase amount was **$1462.40** . On Sept 24, Deputy Mayor Kjarval kindly offered her time to discuss branding and marketing for the program. Our hope is to tie in the food waste program into the excellent designs she has already developed for our other municipal services. I continue to work with her and the clerk on the program rollout. On Sept 30, I picked up the 80 bins from O Zone, and delivered most of them to the Highway Garage for temporary storage. A box of 15 units is also in Village Hall, pending distribution arrangements and schedule.

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: