Village Green Committee Monthly Report — August 2023

3 versions2023-08-14 → 2023-10-10attached document

Latest version

Village of Red Hook Village Green Commi�ee Monthly Report August 2023

The Current balances of the Village Green Commi�ee’s related budget accounts, as of Sept. 7 are as follows:

  1. Community Beau�fica�on – contractual expenses (#8510.4) ----- (-)

  2. Shade Tree – contractual expenses (#8560.4) ------------------------- (-)

  3. Village Green Commi�ee Checking Account Balance -------------------$10,261.20--

The Village Green Commi�ee met last month as part of the newly established quarterly mee�ng schedule. There was a discussion about the history of the VGC, tree plan�ngs and recruitment. They also used this mee�ng for preliminary planning for the upcoming Fall plan�ng which will happen early to mid-November. Addi�onally, we discussed the grant applica�on and process. The grant was submi�ed at the end of the month. Word should come middle to end of October about any award.

Residents and businesses interested in having a tree(s) planted on their adjacent Village street or NYS highway right-of-ways, volunteering for plan�ng days, or sponsoring a VGC beau�fica�on project, may contact David Pearson, myself, Kym Bradley-Rickard, or the Jen Cavanaugh- Village Clerk.

The next regularly scheduled mee�ng will be the Second Sunday of December at 6 p.m.

Village of Red Hook Sewer Department Monthly Report August 2023

We con�nue to meet regularly to discuss the final steps for the sewer project. We met on 29[th] to discuss the need for some bigger plans and to address the requests and future requests to connect. Currently we are working on edits to the code and ensuring all documenta�on is up to date and accurate.

There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project.

As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain ma�ers!

If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, op�on 8. Press the “Silence Alarm” bu�on ONLY AFTER no�fying the Sewer Operator. Please do not open the box or tamper with Village owned equipment.

Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023

We have reconnected with the engineer firm and the next steps are for them to prepare a proposal which will be reviewed by the Board. The proposed traffic study will cover at least one to two streets per quadrant focusing on high traffic roads and neighborhoods. We will take considera�on from exis�ng studies to inform areas of interest and what would be best for the Village businesses and residents.

Changes between versions

2023-08-142023-09-11
substantive change+224

The document expanded from a single committee report to a combined report including the Sewer Department and the Speed Limit Initiative.

  • Title changed from 'Village Green Committee Monthly Report — August 2023' to 'Village Green Committee and Speed Limit Initiative Monthly Report — August 2023'
  • Budget account date changed from 'as of Aug. 1, 2023' to 'as of Sept. 7'
  • Village Green Committee Checking Account Balance increased from '$7,674.32' to '$11,476.32'
  • Reported meeting status changed from 'no Village Green Committee Meetings held during the month of July, 2023' to 'no formal Village Green Committee Meetings held during the month of August, 2023'
  • Added 'Village of Red Hook Sewer Department Monthly Report August 2023' section containing plant flow data and maintenance reminders
  • Added 'Village of Red Hook Speed Limit Initiative Monthly Report August 2023' section regarding upcoming traffic study proposals
Show red-line diff
Village of Red Hook Village Green Commi�ee Monthly Report August 2023 The Current balances of the Village Green Commi�ee’s related budget accounts, as of AugSept. 1, 20237 are as follows: 1. Community Beau�fica�on – contractual expenses (#8510.4) ----- (-) 2. Shade Tree – contractual expenses (#8560.4) ------------------------- (-) 3. Village Green Commi�ee Checking Account Balance -------------------$711,674476.32-- There were no formal Village Green Commi�ee Mee�ngs held during the month of JulyAugust, 2023. However, Dave and I met to coordinate for the upcoming Fall Plan�ng which will take place in November and for future grant opportuni�es. Part of the role of the Village Green Commi�ee is to promote access to the green spaces in our village and part of that is fulfilling Bench requests/dona�ons. The bench dona�ons from the VFW are in design mode and are moving forward and hopefully will be solidified this month. Residents and businesses interested in having a tree(s) planted on their adjacent Village street or NYS highway right-of-ways, volunteering for plan�ng days, or sponsoring a VGC beau�fica�on project, may contact David Pearson, myself, Kym Bradley-Rickard, or the Jen Cavanaugh- Village Clerk. The upcoming mee�ng will be to discuss the Fall Plan�ng that happens in November. Feel free to join to see what is happening and to prepare for the fall plan�ng in November. Village of Red Hook Sewer Department Monthly Report August 2023 This last month we took a trip to the Waste Water Treatment Plant (WWTP) to familiarize ourselves with the layout poten�al maintenance issues and spur ideas for the future of the sewer. During the month of July the average daily flow was 9 Million Gallons Per day at Plant B (old Red Hook Commons Plant) and 40 Million gallons per day at Plant A (New plant). There were samples sent out for tes�ng and all came back normal. There are a few items needed for repair/maintenance. There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project. As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain ma�ers! If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, op�on 8. Press the “Silence Alarm” bu�on ONLY AFTER no�fying the Sewer Operator. Please do not open the box or tamper with Village owned equipment. Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023 As summer is rounding the corner, I reached back out to our contact at the engineer firm and the next steps are for them to prepare a proposal which will be reviewed by the Board. The proposed traffic study will cover at least one to two streets per quadrant focusing on high traffic roads and neighborhoods. We will take considera�on from exis�ng studies to inform areas of interest and what would be best for the Village businesses and residents.
2023-09-112023-10-10
substantive change+68

The Village Green Committee report was updated to reflect a lower account balance and the removal of the Speed Limit Initiative and Sewer Department details from the main title.

  • Title changed from 'Village Green Committee and Speed Limit Initiative Monthly Report — August 2023' to 'Village Green Committee Monthly Report — August 2023'
  • Village Green Committee Checking Account Balance decreased from $11,476.32 to $10,261.20
  • Removed section regarding the WWTP trip and specific daily flow statistics (9 Million and 40 Million gallons per day)
  • Added information regarding a newly established quarterly meeting schedule and a grant submission
  • Updated meeting notice from an unspecified upcoming meeting to 'the Second Sunday of December at 6 p.m.'
Show red-line diff
Village of Red Hook Village Green Commi�ee Monthly Report August 2023 The Current balances of the Village Green Commi�ee’s related budget accounts, as of Sept. 7 are as follows: 1. Community Beau�fica�on – contractual expenses (#8510.4) ----- (-) 2. Shade Tree – contractual expenses (#8560.4) ------------------------- (-) 3. Village Green Commi�ee Checking Account Balance -------------------$1110,476261.3220-- There were no formalThe Village Green Commi�ee Meemet last month as part of the newly established quarterly mee�ng schedule. There was a discussion about the history of the VGC, tree plan�ngs heldand during the month of August, 2023recruitment. However,They Davealso andused Ithis metmee�ng tofor coordinatepreliminary planning for the upcoming Fall Planplan�ng which will takehappen placeearly into mid-November. Addi�onally, we discussed the grant applica�on and forprocess. futureThe grant opportuniwas submies.ed Partat the end of the rolemonth. Word should come middle to end of theOctober Villageabout Greenany Commi�ee is to promote access to the green spaces in our village and part of that is fulfilling Bench requests/dona�ons. The bench dona�ons from the VFW are in design mode and are moving forward and hopefully will be solidified this monthaward. Residents and businesses interested in having a tree(s) planted on their adjacent Village street or NYS highway right-of-ways, volunteering for plan�ng days, or sponsoring a VGC beau�fica�on project, may contact David Pearson, myself, Kym Bradley-Rickard, or the Jen Cavanaugh- Village Clerk. The upcomingnext regularly scheduled mee�ng will be to discuss the FallSecond Plan�ngSunday thatof happensDecember inat November6 p. Feel free to join to see what is happening and to prepare for the fall plan�ng in Novemberm. Village of Red Hook Sewer Department Monthly Report August 2023 ThisWe lastcon�nue monthto meet regularly to discuss the final steps for the sewer project. We met on 29[th] to discuss the need for some bigger plans and to address the requests and future requests to connect. Currently we tookare aworking tripon edits to the Wastecode Waterand Treatmentensuring Plantall (WWTP)documenta�on is up to familiarize ourselves with the layout poten�al maintenance issuesdate and spur ideas for the future of the sewer. During the month of July the average daily flow was 9 Million Gallons Per day at Plant B (old Red Hook Commons Plant) and 40 Million gallons per day at Plant A (New plant). There were samples sent out for tes�ng and all came back normal. There are a few items needed for repair/maintenanceaccurate. There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project. As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain ma�ers! If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, op�on 8. Press the “Silence Alarm” bu�on ONLY AFTER no�fying the Sewer Operator. Please do not open the box or tamper with Village owned equipment. Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023 AsWe summerhave isreconnected rounding the corner, I reached back out to our contact atwith the engineer firm and the next steps are for them to prepare a proposal which will be reviewed by the Board. The proposed traffic study will cover at least one to two streets per quadrant focusing on high traffic roads and neighborhoods. We will take considera�on from exis�ng studies to inform areas of interest and what would be best for the Village businesses and residents.

References

This document cites or incorporates the following separate documents:

  • 2023-08-14Sewer Department Monthly Report — August 2023
    Both documents report the same water treatment facility operations for the same month (August 1, 2023) with overlapping data (flow, chlorine usage, coliform samples); Document B is a more complete/official state-form version of the same monthly reporting slot.
  • 2023-10-10Wastewater System Operation Report — August 2023
    Document A is a monthly committee report mentioning sewer operations in passing; Document B is a detailed technical wastewater facility operation report for the same month—separate artifacts serving different purposes (summary vs. regulatory compliance detail).

Referenced by

These other documents cite or incorporate this one:

  • 2023-08-14Sewer Department Monthly Report — August 2023
    Document B is a composite board report package containing multiple independent monthly reports (Village Green Committee, Sewer Department, Speed Limit Initiative) from August 2023, while Document A is a standalone Sewer Department report from the same month; B references/incorporates A as one component among several separate artifacts, not a revision of it.

Recurring pattern

These other chains use the same template but are separate decisions: