Sewer Report - July 13th, 2026

Things are currently status-quo at the sewer.

We have had three instances of note:

  1. An overflow at the post office pump station - easily remediated

  2. A high mudwell at the plant - resolved by backwashing

  3. High temperatures in the plant - due to summer heat and thriving “bugs”. We will monitor temperature of outflow to ensure well-being of Massoneau wetland

Les Coon and Jake Smith provided estimates for safety railing updates within the plant. Costing about $3000, within budget for standard maintenance and care.

Delaware Engineering recently provided two engineering schematics:

  1. Short-term updates to optimize capacity at current plant

  2. Extensive plans for expansion project

The Daily Catch visited the plant, following up on a former article regarding WWTP.

Trustee Allen is currently receiving quotes from various energy suppliers to renegotiate our costs - should have everything for the Board by the next workshop meeting.

Follow-up Questions:

  • Status of IMG?

Changes between versions

2026-07-132026-07-13
clerical+00

The document remains unchanged.

Show red-line diff
## **Sewer Report - July 13th, 2026** Things are currently status-quo at the sewer. We have had three instances of note: 1. An overflow at the post office pump station - easily remediated 2. A high mudwell at the plant - resolved by backwashing 3. High temperatures in the plant - due to summer heat and thriving “bugs”. We will monitor temperature of outflow to ensure well-being of Massoneau wetland Les Coon and Jake Smith provided estimates for safety railing updates within the plant. Costing about $3000, within budget for standard maintenance and care. Delaware Engineering recently provided two engineering schematics: 1. Short-term updates to optimize capacity at current plant 2. Extensive plans for expansion project The Daily Catch visited the plant, following up on a former article regarding WWTP. Trustee Allen is currently receiving quotes from various energy suppliers to renegotiate our costs - should have everything for the Board by the next workshop meeting. Follow-up Questions: - Status of IMG?

Recurring pattern

These other chains use the same template but are separate decisions: