Wastewater Department Monthly Report — November 2023

2 versions2023-12-11 → 2024-01-08attached document

Latest version

We should have our report from the engineers about the total expansion capacity in March or April which will line us up for upcoming Grant Cycle.

During the month of November we averaged 14,000 GPD in the Red Hook Plant and 38,000 GPD in the BK Plant. There were five (5) samples sent out for testing and all came back within the normal range for compliance. For the old plant one process train is down for review of deficiencies, and clogging has been an issue for some time at the pump station it is recommended that Pump Station mixing should be implemented to help with pump failure and pump station pump outs.

As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain matters!

If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, option 8. Press the “Silence Alarm” button ONLY AFTER notifying the Sewer Operator. Please do not open the box or tamper with Village owned equipment.

Village of Red Hook Speed Limit Initiative Monthly Report December 2023

Creighton Manning is moving forward on an all-encompassing Traffic study that will take into consideration a school zone, village roads and the main throughways. We have connected the firm with the RHCSD to coordinate appropriate timings to conduct studies to impact school zone findings. They will compile a report based on their study (based on their findings) to aid in the documentation to lower the Area Village Speed Limit to 25 mph. The lower speed limit will help residents, businesses, and the overall safety of our village streets.

==> picture [167 x 26] intentionally omitted <==

Changes between versions

2023-12-112024-01-08
substantive change+97

The department name changed from 'Sewer' to 'Wastewater' and a new section regarding a Speed Limit Initiative was added.

  • Title changed from 'Sewer Department Monthly Report — November 2023' to 'Wastewater Department Monthly Report — November 2023'
  • Document date changed from '2023-12-11' to '2024-01-08'
  • Flow metrics changed from '12,000 MGD in the old plant and 39,000 MGD in the BK Plant' to '14,000 GPD in the Red Hook Plant and 38,000 GPD in the BK Plant'
  • Added new section: 'Village of Red Hook Speed Limit Initiative Monthly Report December 2023' regarding a traffic study by Creighton Manning
  • Removed section regarding the Village Board resolution for engineer expansion planning and the STEP sewer system design details
Show red-line diff
the public and we are actively seeking members of our community to join the committee. Village of Red Hook Sewer Department Monthly Report November 2023 We continue to meet regularly to discuss bigger plants and addressing requests for future connections to the sewer system. During the Month of November, the Village Board passed a resolution to allow the village Engineers to compile a report and plan for maximum expansion so that as we move forward we have a master plan to work toward in adding to our system. The STEP sewer system was specifically designed to be able for future expansion without involving a complete overhaul of the system. It was designed with phases in mind to be able to address the growing needs of the Village and our residents. We should expecthave theour report to come in from the engineerengineers aroundabout the total expansion capacity in March 2024.or WithApril this report wewhich will beline ableus to seek out potential funding opportunitiesup for expansionupcoming Grant Cycle. During the month of OctoberNovember we averaged 1214,000 MGDGPD in the oldRed plantHook Plant and 3938,000 MGDGPD in the BK Plant. There were **five (5)** samples sent out for testing and all came back within the normal range for compliance. For the old plant one process train is down for review of deficiencies, and clogging has been an issue for some time at the pump station it is recommended that Pump Station mixing should be implemented to help with pump failure and pump station pump outs. As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain matters! If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, option 8. Press the “Silence Alarm” button ONLY AFTER notifying the Sewer Operator. Please do not open the box or tamper with Village owned equipment. Village of Red Hook Speed Limit Initiative Monthly Report December 2023 Creighton Manning is moving forward on an all-encompassing Traffic study that will take into consideration a school zone, village roads and the main throughways. We have connected the firm with the RHCSD to coordinate appropriate timings to conduct studies to impact school zone findings. They will compile a report based on their study (based on their findings) to aid in the documentation to lower the Area Village Speed Limit to 25 mph. The lower speed limit will help residents, businesses, and the overall safety of our village streets. **==> picture [167 x 26] intentionally omitted <==**

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: