Red Hook WatchIndependent Community Resource

York Environmental Labs Technical Report — August 2025

1 versions2025-08-01attached document

Versions

  1. 12025-08-01

Document

Technical Report

prepared for:

Village of Red Hook

7467 S Broadway Red Hook, NY 12571 Attention: J. Cavanaugh

Report Date: 08/22/2025 Client Project ID: Wastewater 2025 York Project (SDG) No.: N5H0346

CT Cert. No. PH-0800

New York Cert. No. 11706

56 Church Hill Road #2 Newtown, CT 06470 (203) 270-9973 FAX (203) 270-3348

ClientServices@yorklab.com

www.YORKLAB.com

LY Page 1 of 10

Report Date: 08/22/2025

Client Project ID: Wastewater 2025 York Project (SDG) No.: N5H0346

Village of Red Hook 7467 S Broadway Red Hook, NY 12571 Attention: J. Cavanaugh

Purpose and Results

This report contains the analytical data for the sample(s) identified on the attached chain-of-custody received in our laboratory on August 13, 2025 and listed below. The project was identified as your project: Wastewater 2025 .

The analyses were conducted utilizing appropriate EPA, Standard Methods, and ASTM methods as detailed in the data summary tables.

All samples were received in proper condition meeting the customary acceptance requirements for environmental samples except those indicated under the Sample and Analysis Qualifiers section of this report.

All analyses met the method and laboratory standard operating procedure requirements except as indicated by any data flags, the meaning of which are explained in the Sample and Data Qualifiers Relating to This Work Order section of this report and case narrative if applicable.

Please contact Client Services at 203-270-9973 with any questions regarding this report.

York Sample IDClient Sample ID-Date CollectedDate Received
N5H0346-01Matrix-08/13/202508/13/2025
N5H0346-02A1 E-08/13/202508/13/2025
N5H0346-03Waste Water-08/13/202508/13/2025
N5H0346-04A2 E-08/13/202508/13/2025
N5H0346-05Waste Water-08/13/202508/13/2025
N5H0346-06A3 E-08/13/202508/13/2025
N5H0346-07Waste Water-08/13/202508/13/2025
N5H0346-08A4 E-08/13/202508/13/2025
N5H0346-09Waste Water-08/13/202508/13/2025
N5H0346-10A5 I-08/13/202508/13/2025
N5H0346-11Waste Water-08/13/202508/13/2025
N5H0346-12A6 I-08/13/202508/13/2025
N5H0346-13Waste Water-08/13/202508/13/2025
N5H0346-14A7 I-08/13/202508/13/2025
-Waste Water---
-B1 E---
-Waste Water---
-B2 E---
-Waste Water---
-B3 E---
-Waste Water---
-B4 E---
-Waste Water---
-B5 I---
-Waste Water---
-B6 I---
-Waste Water---
-B7 I---
-Waste Water---

Page 2 of 10

YORK
Sample Information[TOC_2]A1 E[TOC]
[TOC 1]Sample Results[TOC]
Client Sample ID:A1 EYork Sample ID:York Sample ID:N5H0346-01
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
Analysis Conducted by:Phoenix Environmental Labs, Inc.Phoenix Environmental Labs, Inc.
[TOC_3]SM5210B-16[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Carbonaceous BOD< 4.0mg/L4.00-SM5210B-1608/14/2025 13:1508/14/2025 13:15PHO
NY-11301
Certifications:
Sample InformationSample InformationSample Information[TOC_2]A2 E[TOC][TOC_2]A2 E[TOC]
Client Sample ID:A2 EYork Sample ID:N5H0346-02
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Miscellaneous Physical Parameters[TOC][TOC_3]Miscellaneous Physical Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Total Suspended Solids1.40mg/LZ-011.00-SM 2540D-201508/15/2025 06:0408/15/2025 06:04
08/15/2025 13:27SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Sample InformationSample InformationSample Information[TOC_2]A3 E[TOC][TOC_2]A3 E[TOC]
Client Sample ID:A3 EYork Sample ID:N5H0346-03
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Wet Chemistry Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Ammonia Nitrogen as N0.0963mg/L0.05-SM 4500-NH3 D08/14/2025 09:0408/14/2025 09:04
08/14/2025 09:04TCD
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Total Kjeldahl Nitrogen1.30mg/L0.40-SM 4500-N Org D08/14/2025 07:2008/14/2025 07:20
08/15/2025 09:00SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348

ClientServices@yorklab.com a Page 3 of 10

www.YORKLAB.com

YORK
Sample Information[TOC_2]A4 E[TOC]
Client Sample ID:A4 EYork Sample ID:York Sample ID:N5H0346-04
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
Analysis Conducted by:Phoenix Environmental Labs, Inc.Phoenix Environmental Labs, Inc.
[TOC_3]Colilert-18[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Fecal Coliforms MPN<10MPN/10010.00-Colilert-1808/13/2025 10:4008/13/2025 18:10PHO
mlsNY-11301
Certifications:
Sample Information[TOC_2]A5 I[TOC][TOC_2]A5 I[TOC]
Client Sample ID:A5 IYork Sample ID:York Sample ID:N5H0346-05
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:

Analysis Conducted by: Phoenix Environmental Labs, Inc.

[TOC_3]SM5210B-16[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Carbonaceous BOD99mg/L46.00-SM5210B-1608/14/2025 13:1508/14/2025 13:15PHO
Certifications:
NY-11301
Sample InformationSample InformationSample Information[TOC_2]A6 I[TOC][TOC_2]A6 I[TOC]
Client Sample ID:A6 IYork Sample ID:N5H0346-06
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Miscellaneous Physical Parameters[TOC][TOC_3]Miscellaneous Physical Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Total Suspended Solids64.0mg/L5.00-SM 2540D-201508/15/2025 06:0408/15/2025 06:04
08/15/2025 13:27SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348

ClientServices@yorklab.com a Page 4 of 10

www.YORKLAB.com

YORKYORKYORK
Sample Information[TOC_2]A7 I[TOC]
Client Sample ID:A7 IYork Sample ID:N5H0346-07
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:40 amAugust 13, 2025 10:40 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Wet Chemistry Parameters[TOC][TOC_3]Wet Chemistry Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Ammonia Nitrogen as N45.0mg/L0.10-SM 4500-NH3 D08/14/2025 09:0408/14/2025 09:04
08/14/2025 09:04TCD
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Total Kjeldahl Nitrogen45.2mg/L0.40-SM 4500-N Org D08/14/2025 07:2008/14/2025 07:20
08/15/2025 09:00SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Sample Information[TOC_2]B1 E[TOC][TOC_2]B1 E[TOC]
Client Sample ID:B1 EYork Sample ID:York Sample ID:N5H0346-08
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:
Analysis Conducted by:Phoenix Environmental Labs, Inc.Phoenix Environmental Labs, Inc.
[TOC_3]SM5210B-16[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Carbonaceous BOD< 4.0mg/L4.00-SM5210B-1608/14/2025 13:1508/14/2025 13:15PHO
NY-11301
Certifications:
Sample InformationSample InformationSample Information[TOC_2]B2 E[TOC][TOC_2]B2 E[TOC]
Client Sample ID:B2 EYork Sample ID:N5H0346-09
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Miscellaneous Physical Parameters[TOC][TOC_3]Miscellaneous Physical Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Total Suspended Solids7.80mg/L1.00-SM 2540D-201508/18/2025 08:1708/18/2025 08:17
08/18/2025 13:53SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348 ClientServices@yorklab.com a Page 5 of 10

www.YORKLAB.com

YORK
Sample Information[TOC_2]B3 E[TOC]
Client Sample ID:B3 EYork Sample ID:York Sample ID:N5H0346-10
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Wet Chemistry Parameters[TOC][TOC_3]Wet Chemistry Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Ammonia Nitrogen as N< 0.0500mg/L0.05-SM 4500-NH3 D08/14/2025 09:0408/14/2025 09:04TCD
NYSDOH-NY10854,CTDPH-PH-0840,NJDE
Certifications:
Total Kjeldahl Nitrogen2.15mg/L0.40-SM 4500-N Org D08/14/2025 07:2008/15/2025 09:00SMM
Certifications:
NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Sample Information[TOC_2]B4 E[TOC][TOC_2]B4 E[TOC]
Client Sample ID:B4 EYork Sample ID:York Sample ID:N5H0346-11
York Project (SDG) No.York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:

Analysis Conducted by: Phoenix Environmental Labs, Inc.

[TOC_3]Colilert-18[TOC][TOC_3]Colilert-18[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodPrepared
Date/TimeAnalyzed
Date/TimeAnalyst
Fecal Coliforms MPN10MPN/10010.00-Colilert-1808/13/2025 10:5508/13/2025 10:5508/13/2025 18:45PHO
mlsCertifications:NY-11301
Sample Information[TOC_2]B5 I[TOC]
Client Sample ID:B5 IYork Sample ID:York Sample ID:N5H0346-12
York Project (SDG) No.Client Project IDMatrixCollection Date/TimeDate Received
N5H0346Wastewater 2025Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 amAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:

Analysis Conducted by: Phoenix Environmental Labs, Inc.

Results

|Parameter|Result|Units|Qualifier|RL|MCL|Reference Method|Prepared Date/Time|Analyzed Date/Time|Analyst| |---|---|---|---|---|---|---|---|---|---| |Carbonaceous BOD|84|mg/L||46.00|-|SM5210B-16|08/14/2025 13:15|08/14/2025 13:15|PHO| |||||||Certifications: NY-11301||||

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348

ClientServices@yorklab.com a Page 6 of 10

www.YORKLAB.com

YORKYORKYORK
Sample Information[TOC_2]B6 I[TOC]
Client Sample ID:B6 IYork Sample ID:N5H0346-13
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Miscellaneous Physical Parameters[TOC][TOC_3]Miscellaneous Physical Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Total Suspended Solids119mg/L7.14-SM 2540D-201508/18/2025 08:1708/18/2025 08:17
08/18/2025 13:53SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Sample InformationSample InformationSample Information[TOC_2]B7 I[TOC][TOC_2]B7 I[TOC]
Client Sample ID:B7 IYork Sample ID:N5H0346-14
York Project (SDG) No.Client Project IDMatrixCollection Date/Time
Date Received
N5H0346Wastewater 2025Waste WaterAugust 13, 2025 10:55 amAugust 13, 2025 10:55 am08/13/2025
Field Analyses:Log-in/Sample Notes:
[TOC_3]Wet Chemistry Parameters[TOC][TOC_3]Wet Chemistry Parameters[TOC]Results
ParameterResultUnitsQualifierRLMCLReference MethodAnalyzed
Date/Time
Prepared
Date/TimeAnalyst
Ammonia Nitrogen as N7.07mg/L0.05-SM 4500-NH3 D08/14/2025 09:0408/14/2025 09:04
08/14/2025 09:04TCD
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD
Total Kjeldahl Nitrogen21.5mg/L0.40-SM 4500-N Org D08/14/2025 07:2008/14/2025 07:20
08/15/2025 09:00SMM
Certifications:NYSDOH-NY10854,CTDPH-PH-0840,NJDEP-CT005,PAD

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348

ClientServices@yorklab.com a Page 7 of 10

www.YORKLAB.com

Definitions and Other Information

Z-01 mg residue is less than 2.5 mg

<10 <10

  • Analyte is not certified or the state of the samples origination does not offer certification for the Analyte.

MCL The Maximum Contaminant Level (MCL) is the maximum concentration of a chemical that is allowed in public drinking water systems. The MCL is established by the U.S. Environmental Protection Agency (EPA). Some states have MCLs that are equal to or less than the Federally established MCL. The listed MCL value reflects the MCL established by the State where the sample was taken.

General Notes for N5H0346

  1. The RLs and MDLs (Reporting Limit and Method Detection Limit respectively) reported are adjusted for any dilution necessary due to the levels of target and/or non-target analytes and matrix interference. The RL(REPORTING LIMIT) is based upon the lowest standard utilized for the calibration where applicable.

  2. Samples are retained for a period of thirty days after submittal of report, unless other arrangements are made.

  3. York's liability for the above data is limited to the dollar value paid to York for the referenced project.

  4. This report shall not be reproduced without the written approval of York Analytical Laboratories, Inc.

  5. All analyses conducted met method or Laboratory SOP requirements. See the Sample and Data Qualifiers Section for further information.

  6. It is noted that no analyses reported herein were subcontracted to another laboratory, unless noted in the report.

  7. This report reflects results that relate only to the samples submitted on the attached chain-of-custody form(s) received by York.

Approved By:

Date: August 22, 2025

Cassie Mosher Chemistry Director Phil Murphy Interim Microbiology Director

56 Church Hill Road #2 (203) 270-9973

Newtown, CT 06470 FAX (203) 270-3348

ClientServices@yorklab.com Page 8 of 10 [

www.YORKLAB.com

56 Church Hill Road #2 Newtown, CT 06470 (203) 270-9973 FAX (203) 270-3348 ClientServices@yorklab.com a Page 9 of 10

www.YORKLAB.com

==> picture [64 x 11] intentionally omitted <==

----- Start of picture text -----

Page 10 of 10 ----- End of picture text -----

Changes between versions

2026-03-092026-03-09
clerical+11

No substantive changes were made to the report.

Show red-line diff
**Village of Red Hook Mayor s Report February 2026** ## VILLAGE HALL Internet: Archtop Fiber made the fiber connection to Village Hall in mid-February. All seems to be operating well. Next step is installation at the Water Treatment Plant. For the Sewer Plant, fiber needs to be installed in the ground which won’t happen until the ground has thawed. Parking Lot Lights: The lights in the municipal parking lot are not working. There is a problem with the wiring that is planned to be fixed once the ground thaws and the electrician can make the repairs. ## SAWKILL WATERSHED COMMUNITY ADVISORY COUNCIL (SKWC) The SKWC had a very busy month! The SKWC met on Eeb. 18[th] at 6:30pm in Village Hall to review the upcoming presentation by Eli Drueker of Bard College. Attendees were Karen Schnelling-McDonald, Sheila Buff, Jen Adams, Henry Woods, Ruth Ford, Amanda Sandor, Karen Smythe, Eli Drueker & Jordan Ayala from Bard College. Eli & Jordan presented their database that was developed with funding from the Hudson River Foundation and includes all manner of data that goes back to the 1920s. The database will be housed on Bard College servers. The plan is for continued input of new data. There is a link on the SKWC website. Data regarding the water testing from the site at Benner Road, downstream of the WWTP discharge starts in 1975. I have a meeting with Eli later in March to discuss how to access this data correctly so we can see the impacts from the plants over time. Details of the February 24[th] event were discussed. The Town of Stanford requested information about the well testing program that SKWC has done in the past. Additional water quality testing and funding was also discussed. At the February 24[th] event at the Elmendorph Inn, the SKWC in collaboration with the Hudson River Watershed Alliance & Bard College, Eli Drueker & Jordan Ayala presented the database and Karen Schnelling-McDonald shared the activities of the SKWC over the last 10 years with a view toward what’s next. At the end of the program, Karen Schnelling-McDonald was honored for her 10 years at the helm of the SKWC as she is stepping down as Chair. I was honored to be able to present a Proclamation to Karen for her work and leadership. The next meeting is scheduled for Wed. March 4[th] at 5:30pm in Village Hall to discuss 2026 priorities and a funding request from the Town. The next meeting after that is scheduled for Wed. March 25[th] at 6:30pm at Village Hall. ## CLIMATE SMART COMMUNITY TASK FORCE The meeting scheduled for Feb. 26[th] had to be cancelled as the majority of the team couldn’t make it. Betsy Brauer has resigned from this committee. Next meeting is being scheduled. ## PUBLIC SPACES/ABRAHAMS PARK The Public Spaces Committee has not met since my last report. Due to the holiday schedules, the next meeting is March 16[th] at 7pm in Village Hall. Barbara Westermann has resigned from this committee. I did meet with Betsy Brauer on Feb. 25[th] in preparation for the next meeting. We discussed possible funding sources and approaches. We also discussed a possible summer internship for the Bard Student working on the Park. We discussed the need for a document reflecting the goals and objectives for the project. ## DUTCHESS COUNTY TRANSPORTATION COUNCIL (DCTC) The DCTC Planning Committee met virtually on February 25[th] . They shared announcements about upcoming reviews, reports and funding opportunities. The team shard the process for updating the County Long Term Transportation Plan for 2026 – Moving Dutchess Forward. We discussed the classification of roads in the County. The Safety Action Plan is in the final stages, the final draft should be available soon. The Annual Traffic Count program will be starting soon. 2025 counts will be added to the DCTC website in March. ## COMMUNITY ENGAGEMENT Feb. 5[th] , I attended an open house at Professional Computer Associates (PCA) located at 7401 S. Broadway for their celebration of their new owners and new name – Synagex. Feb. 7[th] I attended the Red Hook Fire Company Installation Dinner where Justice Jonah Treibwasser swore in the new officers for 2026. Feb. 15[th] I attended the State of the Hudson Valley speech by Congressmember Pat Ryan at the Family Partnership Center in Poughkeepsie, NY. Feb. 24[th] I attended the Sawkill Watershed Community event at the Elmendorph and presented Karen Schnelling-McDonald a proclamation for her service to the SKWC and the whole community.

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: