Red Hook WatchIndependent Community Resource

Wastewater Facility Operation Reports — July 2024

1 versions2024-09-09attached document

Document

Village of Red Hook Wastewater SystemVillage of Red Hook Wastewater SystemVillage of Red Hook Wastewater SystemVillage of Red Hook Wastewater SystemVillage of Red Hook Wastewater System
Red Hook CommonsVillage of Red Hook
Average Daily Flow :0.009 MGD (Million Gallons per Day)0.039 MGD (Million Gallons per Day)
Required SamplesResult- Old PlantResult- New PlantCompliance
BOD (June 1 - Oct 31)2.4 mg/L3.6 mg/L5 mg/L
July 2024TSS
NH32.5 mg/L
0.08472.5 mg/L
0.084710 mg/L
0.98 mg/L (June 1 - Oct 31) 1.81 mg/L (Nov 1 - May 31)
Fecal Coliform<1.00/100 mL<1.00/100 mL200/100 mL
Dissolved Oxygen8.0 mg/L8.0 mg/L7.0 mg/L Minimum
Deficiencies
Sand FilterSand Filters have never been rebuilt or media replaced. Tobe reviewed and incorporated into the planning for the Sewer Phase II project.
Backflow Prev.Facilities backflow Preventor in need of replacement.
Replacement
Additional Notes:

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

  • 2024-08-05Sewer Department Monthly Report — July 2024
    Document A is a general monthly sewer department report; Document B is a technical wastewater system compliance report for a specific facility (Red Hook Commons), each serving distinct reporting purposes on different aspects of the sewer/wastewater infrastructure.

Recurring pattern

These other chains use the same template but are separate decisions: