Red Hook WatchIndependent Community Resource

Wastewater Facility Operation Report — April 2024

1 versions2024-05-13attached document

Document

Effect on Receiving Stream

Effect on Receiving Stream
Name and amount of chemicals used in treatment process
Sludge Removal from Plant:
NAME OF RECEIVING STREAM---
----
---during month.
---a. Amount
---gallons
---a. Chlorine
---lbs.
---b. Solid Content
---%
---b. Sodium Hypochlorite
---gal.
---c.
---Volatile Solids Content
---%
---c. soda Ash
---lbs.
---d. Disposal Site
---Superior Sanitation
---d.
---lbs.
---e.
---lbs.
---f.
---lbs.
---Amount of electrical power consumed
---Other Solid Waters:
---a. Commercial
---kilowatt hours
---a. Screening
---cubic feet
---b. Stand-by
---kilowatt hours
---b. Grit
---cubic feet
---c.
---Ashes
---tons
---Amount of fuel consumed
---d.
---a. Natural Gas
---cubic feet
---e.
---b. Oil
---gallons
---f.
---c. Gasoline
---gallons
---g. Disposal Site Private hauler
---d. Coal
---tons
---e. Digester Gas
---cubic feet
---f.
---Propane
---gallons
---Digester Gas Wasted
---cubic feet
---Labor expended:
---POSITION NAME
---NUMBER FULL TIME
---NUMBER PART TIME
---TOTAL HOURS
---Supervisor
---Chief Operator
---Operator
---Mechanic
---I hereby affirm under penality of perjury that information proided on this form is true to the best of my knowledge and belief. False statements made
---herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.
---Signature of Chief Operator or Designated Facility Representative
DATE
STATIONPARAMETERRESULT

==> picture [449 x 474] intentionally omitted <==

==> picture [29 x 11] intentionally omitted <==

==> picture [38 x 13] intentionally omitted <==

==> picture [8 x 5] intentionally omitted <==

==> picture [301 x 56] intentionally omitted <==

==> picture [395 x 565] intentionally omitted <==

==> picture [7 x 5] intentionally omitted <==

==> picture [7 x 5] intentionally omitted <==

==> picture [6 x 5] intentionally omitted <==

==> picture [466 x 290] intentionally omitted <==

References

This document cites or incorporates the following separate documents:

  • 2024-04-014 2024
    Document A is a completed April 2024 operational report filed in May; Document B appears to be a working document from April 1st—they are separate artifacts in the operational workflow, not revisions of the same singular decision.

Recurring pattern

These other chains use the same template but are separate decisions: