Red Hook WatchIndependent Community Resource

7 2021 July 3rd Q

1 versions2021-07-01working document

Versions

  1. 12021-07-01
    working document

Document

==> picture [233 x 46] intentionally omitted <==

----- Start of picture text -----

2a 7467VillageSouth of Broadway,Red Hook Red WaterHook,& Wastewater New York 12571 Treatment 3}ND Date: 08/04/2021 ----- End of picture text -----

Consulting

Water System

Wastewater System

==> picture [488 x 306] intentionally omitted <==

----- Start of picture text -----

Water System Notes:The PFOA/PFOS,1,4 Dioxane sampleswere collectedfrom each wellWastewater System Notes:3rd quarter samplingis due by September30th.
withbelowregulatorylimit results.We arecurrentlyworkingwithDelawareEngineering
totry and get reduced monitoringrequirements.
All monthly coliformtests were completed,RequiredSamplesResultCompliance
MonthlyTotalColiformalong with a 4th sample collectedfromBODDue5 mg/L
.Traditions,withno presence ofcoliformor.
j3rd Quarter RequiredTSSBy10 mg/L
2nd quarter PFOA/PFOS,1,4 DioxaneSamplesFecalNH3ColiformSept200/1002.2 mg/L
Special SamplesTesting completed with SatisfactorywangsikonOU/LEOraiL
results.
Pell9VentDownwardfacingvent requiredperDOH.Anoxic Mixersad aoneaye PMaceoithaifaifanttes
Well 3 Pressure GaugeWell 3 Pressure Gauge needsto be replacedper DOHsonas moving.Mayneed-foconsiderP.
Well;15eanberPl.Well15nadéde(g view wakiberplacardper DOH
SandFilter RebuildSand Filters havenever beenrebuilt or mediareplaced.
Weil Control IssuesWell controls need to be evaluated as communicationissuesShouldprice andschedule[for][the][ near][future.]
have occurred,Delaware Engineeringis presenting to new
Mayor.Train Downfor ReviewOne processtrainis downfor review ofdeficiencies.
Reviewtobe completedthis week and sentfor review.
Blower System MaintenanceProcess blowers are long overduefor maintenance.Belts
Town/Village Interconnect2020test indicated this was not a viable optionforVillageand oils should bepurchasedforpreventative maintenance.
Slow in case ofemergency.Engineering review currently inPump StationPump Station pumps clogging issues have been anissuefor
Place.some time.Pump Station mixing should be implemented to
helpwithpumpfailureandpumpstation pumpouts.
Well Level/FlowWell level monitorshavebeenreviewed with a variety of
repairs that were required.Currently looking atoptionsforBackflow Prev.ReplacementFacilitiesbackflaw Preventorin need afreplacement.
communicationtowells 14 &15 as there is a short in wiring=Fi;
betweentheplant and the wellsPump StationPump FailurePump Station pump and check valve have been replaced.
StorageTank InspectionsAll storagetanks have beeninspected and are awaitingPumpStation LawncarePump stationinNeed of weedwhacking.DoesVillage
report.request C3ND to complete or Village personnel

----- End of picture text -----

Changes between versions

2025-12-082025-12-08
clerical+00

No substantive changes between versions.

Show red-line diff
Trustee Uku Village Green Report for November 2025 Dec 8, 2025 VGC Chair Tara Barrett submitted the Village’s 2025 application for **Tree City USA membership renewal** on 11/26/2025. Applicants are required to show proof of the following: - an active tree board and/or department - a tree care ordinance [ _ours dated 10/07/2002_ ] - a community forestry program with an annual budget of at least $2 per capita [ _ours $20.62_ ] - an Arbor Day observance and proclamation [ _ours dated 04/19/2025, see photo_ ] Thanks again to former Trustee and VGC Liaison Kym Bradley-Rickard for keeping meticulous records, without which our submission would not have been possible. ## **Reminders:** - I have set up a Village Street Tree Request Form. Ask your Clerk (or friendly neighborhood Liaison) if a complimentary street tree is right for you. The form can currently be accessed from the Agenda page for this meeting on the Village website. - If you have a little free time and would like to meet fun neighbors while beautifying where you live, the VGC warmly welcomes you! - All current terms end 12/31/25, and all committee members seek reappointment. As always, it’s a pleasure to serve this hardworking team. **francesuku@redhookvillage.gov**

Recurring pattern

These other chains use the same template but are separate decisions: