Red Hook WatchIndependent Community Resource

DEC Wastewater Facility Report — January 2026 (Facility 2)

1 versions2026-02-09attached document

Document

Page 2 of 4

|FACIL|ITY MAIL|ING ADDRESS (Street, City, Zip|ING ADDRESS (Street, City, Zip|Code)|Code)|TELEPHONE NUMBER|TELEPHONE NUMBER|TELEPHONE NUMBER|Leslie A Coon Jr CHIEF OPERTATOR'S NAME|CERTIFICATION GRADE 3A| |---|---|---|---|---|---|---|---|---|---|---| |DAY|DATE|TOTAL PHOSPHOR|US(mg/l)|Ultraviolet||FECAL COLIFORM||REMARKS Enter any other comments, observations, operating problems, equipment failures, etc.||| |||Influent Type|Effluent Type|Contact|Effluent|Effluent MF or MPN/100ml||||| |||||Minimum|Maximum|||||| ||1|||ON|ON|||||| ||2|||ON|ON|||||| ||3|||ON|ON|||||| ||4|||ON|ON||28.1|||| ||5|||ON|ON|||||| ||6|||ON|ON|||||| ||7|||ON|ON|||||| ||8|||ON|ON|||||| ||9|||ON|ON|||||| ||10|||ON|ON|||||| ||11|||ON|ON|||||| ||12|||ON|ON|||||| ||13|||ON|ON|||||| ||14|||ON|ON|||||| ||15|||ON|ON|||||| ||16|||ON|ON|||||| ||17|||ON|ON|||||| ||18|||ON|ON|||||| ||19|||ON|ON||9.8|||| ||20|||ON|ON|||||| ||21|||ON|ON|||||| ||22|||ON|ON||<1|||| ||23|||ON|ON|||||| ||24|||ON|ON|||||| ||25|||ON|ON|||||| ||26|||ON|ON|||||| ||27|||ON|ON|||||| ||28|||ON|ON|||||| ||29|||ON|ON|||||| ||30|||ON|ON|||||| ||31|||ON|ON|||||| |||Influent mg/l 30 day flow-weighte|Effluent mg/l d avg mean(1)|Minimum(1) Maximum(1) ON ON Monthly||16.6 30 day geometric mean(1)||||| |||||||||||| |||lbs/day|||||||||

(1) Refer to January 1994 edition of DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System (NPDES) for procedures to calculate loadings, arithmetic mean, geometric Mean, maximum, minimum, percent removal, etc

NOTE: Refer to current SPDES permit for specific monitoring requirements. Sample type for temperature, PH and settleable solids is grab

Page 3 of 4

|||||||||||Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control||| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Day | Date | Influent | - | Influent | - | Influent | - | Influent | - | Recirculation | Media effluent | Mixed Liquor | - | - | Return Act. | | - | 1 | Effluent | - | Effluent | - | Effluent | - | Effluent | - | Rate | settleable solids | S.S. (MLSS) | - | - | Waste Act. | | - | 2 | NH3 as N | - | DO | - | TKN | - | UOD | - | - | - | mg/l | - | - | Sludge (RAS) | | - | 3 | - | - | - | - | - | - | - | - | - | - | 5 Minutes | - | - | Sludge (WAS) | | - | 4 | - | - | - | - | - | - | - | - | - | - | 30 minutes | - | - | M.G.D. | | - | 5 | - | - | - | - | - | - | - | - | - | - | Settleable Sludge | - | - | lbs/day | | - | 6 | - | - | - | - | - | - | - | - | - | - | Volume (SSV) ml/l | - | - | - | | - | 7 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 8 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 9 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 10 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 11 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 12 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 13 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 14 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 15 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 16 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 17 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 18 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 19 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 20 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 21 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 22 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 23 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 24 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 25 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 26 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 27 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 28 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 29 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 30 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 31 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |||||||||||M.G.D|ml/l|||||| ||||||8.2|||||||||||| ||||||8.4|||||||||||| ||||||9.9|||||||||||| ||||0.223||9.9|||||||||||| ||||||8.2|||||||||||| ||||||8.4|||||||||||| ||||||9.2|||||||||||| ||||||9.4|||||||||||| ||||||8.2|||||||||||| ||||||9.8|||||||||||| ||||||9.5|||||||||||| ||||||13.8|||||||||||| ||||||9.2|||||||||||| ||||||8.9|||||||||||| ||||||10.2|||||||||||| ||||||12.8|||||||||||| ||||||14.0|||||||||||| ||||||10.4|||||||||||| ||||7.3||9.6||10.2||52.2|||||||| ||||||9.2|||||||||||| ||||||9.4|||||||||||| ||||0.05||9.1||1.06||7.77|||||||| ||||||11.2|||||||||||| ||||||9.9|||||||||||| ||||||9.2|||||||||||| ||||||9.8|||||||||||| ||||||11.3|||||||||||| ||||||10.7|||||||||||| ||||||10.6|||||||||||| ||||||10.5|||||||||||| ||||||9.2|||||||||||| |Min:||||||||||||||||| ||||||8.2|||||||||||| |||||||||||||||||| |||MAX:||||MAX:||MAX:||||||||| ||||7.3||||10.2||52.2|||||||| |||lbs/day||lbs/day||lbs/day||lbs/day|||||||||

(1) Refer to January 1994 edition of DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System (NPDES) for procedures to calculate loadings, arithmetic mean, geometric Mean, maximum, minimum, percent removal, etc

Page 4 of 4

Effect on Receiving Stream

==> picture [240 x 182] intentionally omitted <==

----- Start of picture text -----

Name of Receiving Stream Shanty Hollow Creek Date Station Parameter Result ----- End of picture text -----

TRUCKED WASTE RECEIVED THIS MONTH

==> picture [171 x 70] intentionally omitted <==

----- Start of picture text -----

1- Septage, holding tank waste and portable toilet waste Total Max day Volume (Gal.) 2- All other wastes Total Max day ----- End of picture text -----

  • 3- Number of Part 364 haulers currently approved to transport wastes to this POTW

a.Septage,etc

b. All others

|Name and am during month: a.|ount of chemicals used in treatment process gallons| |---|---| |b.|gallons| |c.|Gallons| |d.|lbs.| |e.|Gallons| |f.|Gallons| | Amount of ece | ctrical power consumed: | | a. Commercial | - | | b. Stand-by | kilowatt hours | | Amount of fuel | - | | a. Natural Gas | - | | b. Oil | - | | c. Gasoline | - | | d. Coal. | - | | e. Digester Ga | - | | f. propane | - | ||kilowatt hours| ||consumed:

cubic feet| ||gallons| ||gallons| ||tons| ||s cubic feet| ||gallons|

==> picture [174 x 152] intentionally omitted <==

----- Start of picture text -----

Sludge removal from plant: a. amount #REF! b. solid content c. Volitile Solids Content d. Disposal Site: Superior Sanitation Other Solid Wastes: a. Screenings b. Grit c. Ashes d. e. f. g. Disposal Site ----- End of picture text -----

Digester Gas Wasted

Labor expended:

==> picture [405 x 182] intentionally omitted <==

----- Start of picture text -----

POSITION NAME NUMBER FULL TIME NUMBER PART TIME TOTAL HOURS Operator I hereby affirm under penalty of perjury that information provided on this form is true to the best of my knowledge and belief. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law. ----- End of picture text -----

Leslie A Coon Jr.

Signature of Chief Operator or Designated Facility Representative

Date

Changes between versions

2026-03-092026-03-09
clerical+00

The document remains substantively unchanged.

Show red-line diff
Trustee Uku DPW Report for February 2026 Mar 9, 2026 ## **Highway Department:** ## Materials Management Here are this month’s costs and expenses. Please refer to the attached Resource Recovery Data Report. Trash & Recycling Pickup Trash & recycling must be out before 5am on Monday mornings. 1. Cardboard bundles should be bound together with string or tape. 2. Paper recycling should be placed loose within a lidded tub or bin. Recycling pickup alternates between **Yellow (paper & cardboard)** & **Blue (metal, plastic & glass).** Bulk Waste disposal (of mattresses, large furniture, etc.) is available to Village residents and businesses at a very affordable rate. Please contact the Clerk to purchase tags for any Village disposal services: (845) 758-1081 – info@redhookvillage.gov - or in person M-F, 11AM- 4PM **The Dual-Stream Recycling Calendar and Guide** is available at Village Hall, and at redhookvillage.org/recycle Food Waste Dropof Residents are welcome to join the Village’s **Food Waste Collection Program** , made possible in part by a composting grant from Dutchess County. To sign up, contact the Clerk or visit redhookvillage.gov/compost ## Brush / Yard Waste Pickup Concluded for the season. Commence the countdown to spring! ## **Scrap Metal Program:** |Revenue received since the last report (1/31/26) was|**$478.50**| |---|---| |Total revenue for this Fiscal Year (Jun 2025- May 2026) to date is|**$3955.60**| |Since the Program’s inception, in Sep 2007, donations have yielded a total of|<br>**$59472.84**| |Proceeds from the program go towards the purchase of tools & equipment for the Public Works<br>Dept. Residents & businesses interested in donating metal may contact the Village Clerk’s ofce to<br>schedule a pickup.|| [francesuku@redhookvillage.gov] Trustee Uku DPW Report for February 2026 Mar 9, 2026 ## **Snow Removal & Seasonal Parking Rules:** No all-night street parking is permitted in the Village from **November 1st - March 31st.** Vehicles parked on the streets between 11 PM - 6 AM may be ticketed and towed at the owner's expense. Property owners are reminded to remove athletic equipment, garbage receptacles and/or any other temporary obstacles from the side of streets to prevent their damage during snow removal operations. The owner and/or occupant of every building/lot in the village with an adjoining sidewalk, is required to remove snow and ice **within 24 hrs of the end of a snowstorm.** The Village Highway Department may remove uncleared snow/ice , at cost to the property owner. ## **Foreman Appreciation, or,** _**“Giving Jake his Flowers”**_ **:** Always grateful to Jake and Team DPW for all their hard work keeping our roads clear and safe throughout this punishing winter. Also, thank you for this thrilling photo. **==> picture [481 x 364] intentionally omitted <==** [francesuku@redhookvillage.gov] Trustee Uku DPW Report for February 2026 Mar 9, 2026 ## **Street Light Complaints:** If you notice a street light out in the Village: You may notify Central Hudson directly by going to: cenhud.com/en/outages, selecting ‘ _Report a Street Light_ ’ and filling out their online form. ## **Potholes:** Y ou can notify the Village of potholes on Village roads by calling the Village Clerk’s office or filling out the ‘ _Report a Concern_ ’ form at: redhookvillage.org/concern. You can also submit your complaint directly to the NYS DOT by calling 1.800.POTHOLE (1.800.768.4653). [francesuku@redhookvillage.gov]

Recurring pattern

These other chains use the same template but are separate decisions: