Red Hook WatchIndependent Community Resource

Water & Wastewater Treatment Monthly Report — January 2023

1 versions2023-03-13attached document

Document

|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571| |---|---|---| |03/06/2023 Water System Wastewater System||| |Water System Notes:||Wastewater System Notes: Sample results for January 2023, with reporting submitted on or before February 28, 2023.| | Monthly Total Coliform | All monthly coliform tests were completed with | January 2023 | | - | no presence of coliform or e. coli | Required Samples | | - | - | Result | | - | - | Compliance | | - | - | BOD | | - | - | <4.0 | | - | - | TSS | | - | - | 10 | | - | - | 10 mg/L | | - | - | NH3 | | - | - | 0.77 | | - | - | 1.81 mg/L | | - | - | Fecal Coliform | | - | - | <1.0 | | - | - | 200/100 mL | | Deficiencies | - | Deficiencies | | Well Control Issues | - | Anoxic Mixers | | Waiting for SCADA update | - | Currently a Medora mixer in place to keep Anoxic tank solids | | Town/Village Interconnect | - | moving. May need to consider this in future updates. | | 2020 test indicated this was not a viable option for Village | - | Sand Filter Rebuild | | flow in case of emergency. Engineering review currently in | - | Sand Filters have never been rebuilt or media replaced. Should | | place. | - | price and schedule for the near future. | | Well Level/Flow | - | Train Down for Review | | Well level monitors have been reviewed with a variety of | - | One process train is down for review of deficiencies. Review to | | repairs that were required. Currently looking at options for | - | be completed this week and sent for review. | | communication to wells 14 & 15 as there is a short in wiring | - | Blower System Maintenance | | between the plant and the wells | - | Belts,oils and filters were replaced. | | - | - | Pump Station | | - | - | Pump Station pumps clogging issues have been an issue for | | - | - | some time. Pump Station mixing should be implemented to | | - | - | help with pump failure and pump station pump outs. | | - | - | Backflow Prev. Replacement | | - | - | Facilities backflow Preventor in need of replacement. | |For Future Notes:|||

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

  • 2023-02-13Committee Reports — January 2023
    Document A is a broad committee reports summary covering multiple boards/committees for January 2023; Document B is a specialized water & wastewater treatment facility report for the same month—they reference the same subject area but occupy different slots (committee reporting vs. facility operations reporting) and are distinct board documents.

Recurring pattern

These other chains use the same template but are separate decisions: