NetDMR Submittal Notification — November 28, 2025

1 versions2025-10-01attached document

Versions

  1. 12025-10-01

Document

Jennifer Cavanaugh

From: netdmr-notification@epa.gov Sent: Friday, November 28, 2025 5:31 PM To: R3.NetDMR@dec.ny.gov; compliance@h2oinnovation.com; jcavanaugh@redhookvillage.gov; lcoon@jcoinc.org Subject: NetDMR DMR(s) Submittal Processed Successfully with Warnings for: NY0271420

The following signed 2 DMR(s) were submitted to EPA. All of the DMRs in the submission are listed. If a DMR had warnings, the details are included below.

CDX Transaction ID: _77612724-ddf1-41fe-8b73-77583dad1526 User ID: COONJ1974 Timestamp: 11/28/2025 16:10:12


Permitted Facility Name: VILLAGE OF REDHOOK WWTP Permit ID: NY0271420 Permitted Feature: 01A

Discharge: M - INTERNAL OUTFALL Monitoring Period End Date: 10/31/25

No errors or warnings found for this DMR.


Permitted Facility Name: VILLAGE OF REDHOOK WWTP Permit ID: NY0271420 Permitted Feature: 01B

Discharge: M - INTERNAL OUTFALL Monitoring Period End Date: 10/31/25

There are 1 warnings present and all are shown below:

  1. Warning - Warning: the following Numeric Condition Quantity(ies) has a Percent Exceedence of greater than 500%: C2 C3

Parameter: Coliform, fecal general (74055) Monitoring Location: Effluent Gross (1) Season: 0

Thank you.

This is a submission from the LIVE (Production) site.

1

Changes between versions

2025-06-092025-06-09
clerical+22

The document underwent minor formatting changes and a section header adjustment.

  • Title changed from 'Village of Red Hook Mayor’s Report May 2025' to 'Village of Red Hook ’ Mayor s Report May 2025'
  • Added header formatting to '## CLIMATE SMART COMMUNITY TASK FORCE:'
Show red-line diff
## **Village of Red Hook Mayor s Report May 2025** ## PERSONNEL Angela Dourdis, Payroll/Acct Clerk, is planning to retire in mid-August. The plan is to hire a replacement – still a Part Time position. With our new Treasurer, Marybeth De Filippis, now full-time, this position will report to the Treasurer going forward. ## WIIA – WATER PROJECTS: Financing **–** We have received confirmation of the additional financing. Closing date is set for June 26. We will finalize all projects after that. Only small punch list items remain outstanding. ## SEWER PROJECT I: The major outstanding item is the Single Audit. We are still waiting for the final audit from the audit firm. And there is still one final MWBE report from Carver Construction to be filed with EFC. The JanMar ’25 report was filed but Carver didn’t make it a final report so there will be at least one more. ## BENNER ROAD COALITION: Town Supervisor McKeon and I had a second meeting on May 23[rd] with a smaller group from the Benner Road Coalition – a group of local residents that live around the sub-tributary and the tributary to the Saw Kill River into which our WWTP discharge flows. The Coalition group invited Dr. Christopher Soloman, whose expertise is in aquatic & ecosystem ecology and the fish and other organisms that live in them. He indicated that sewage breaks down over time naturally so the noncompliant discharge from the WWTP, once corrected, will clear up with time. We discussed several grant possibilities for future applications to consider ways to study and enhance the health of the wetlands. ## SEWER PROJECT II: The Benner Road Coalition and subsequently several residents have requested that the Village rescind the resolution adopting a negative declaration after completing the Full Environmental Assessment Form on July 15, 2024. I have reviewed this with our Land Use Attorney and have forwarded it to the engineers for their review and response. I submitted a request to the NYSDEC for a freshwater wetlands jurisdictional determination on June 2[nd] . Estimated time for a response is 90 days. This is a formal assessment conducted by DEC to determine if an area meets the criteria for classification as a regulated freshwater wetland under the Freshwater Wetlands Act. ## SAWKILL WATERSHED COMMITTEE (SKWC): The Committee did not meet in May. ## RED HOOK LIBRARY (RHPL): The RHPL had their May board meeting on May 15[th] . They reviewed a Meeting Room Policy. Expenses through April are on target. Revenue is ahead, but that is due to the lopsided nature of receiving of funds from the Town & the School. The Director reported on many activities and actions on goals. For more information, you can find their board packet on the library’s website – redhooklibrary.org/board-oftrustees. Their next board meeting will be WEDNESDAY, June 18 at 6:30pm at the Library. ## PUBLIC SPACES/ABRAHAMS PARK: I met with Ash Rickard, Chair of the Public Spaces Initiative. We discussed the structure and charge of this committee. We have a first draft of a resolution creating the Public Spaces Committee. After further review with Ash, I will bring this resolution to the Board for review and discussion. ## CLIMATE SMART COMMUNITY TASK FORCE: There is a revised resolution based on all of our discussions on the agenda for review at this meeting. We have the next meeting scheduled for Thursday, June 12[th] at 4pm in the Village Hall Conference Room.

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

  • 2025-07-01NetDMR COR Submission Notification — August 19, 2025
    Both are status reports on the same NetDMR submission but separated by over 3 months (August to November 2025), indicating two distinct reporting instances rather than a revision of the same document.
  • 2025-10-01October 2025 Sewer Report
    Document A is a sewer department working report and Document B is a separate NetDMR submittal notification; they are distinct artifacts in different regulatory contexts, not revisions of the same instrument.
  • 2025-10-0110 2025
    Document B is a separate DMR report submittal notification that references or reports on wastewater operations covered in Document A, not a revision of the same instrument.
  • 2025-10-01DEC Monthly Operation Report — October 2025 (Facility 1)
    Two separate regulatory reports on the same facility in different reporting systems (SPEDES permit vs. NetDMR); one does not revise the other.
  • 2025-10-01DEC Monthly Operation Report — October 2025 (Facility 2)
    Two separate regulatory reports on the same facility in the same month—one a permit operation report and one a DMR submittal notification—each serving distinct compliance slots.
  • 2025-10-232025 10 23
    Document A is a working document on WWTP operations; Document B is a separate DMR report submittal notification—different artifacts and different slots (operations planning vs. regulatory reporting).
  • 2025-11-17Sewer & Water Department Report
    Document A is an operational status report on sewer and water activities; Document B is a regulatory compliance notification (NetDMR submittal) — separate documents serving different purposes within the department's work, not revisions of the same instrument.
  • 2025-11-232025 11 23
    Document A is a working document on WWTP operations; Document B is a separate DMR report submittal notification—different artifacts and different slots (operations planning vs. regulatory reporting).
  • 2025-12-08Wastewater Facility Operation Report for the Month of October 2025
    Document A is a monthly operational report for October 2025; Document B is a NetDMR submittal notification dated November 28, 2025—they are separate regulatory documents in different slots (operational reporting vs. submission confirmation), not revisions of the same instrument.