Water & Wastewater Treatment Monthly Report — January 2023

Meetings/Documents/att::2023-03-13_minutes_378__b09
Attached document2023-03-13

|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571|Village of Red Hook Water & Wastewater Treatment 7467 South Broadway, Red Hook, New York 12571| |---|---|---| |03/06/2023 Water System Wastewater System||| |Water System Notes:||Wastewater System Notes: Sample results for January 2023, with reporting submitted on or before February 28, 2023.| | Monthly Total Coliform | All monthly coliform tests were completed with | January 2023 | | - | no presence of coliform or e. coli | Required Samples | | - | - | Result | | - | - | Compliance | | - | - | BOD | | - | - | <4.0 | | - | - | TSS | | - | - | 10 | | - | - | 10 mg/L | | - | - | NH3 | | - | - | 0.77 | | - | - | 1.81 mg/L | | - | - | Fecal Coliform | | - | - | <1.0 | | - | - | 200/100 mL | | Deficiencies | - | Deficiencies | | Well Control Issues | - | Anoxic Mixers | | Waiting for SCADA update | - | Currently a Medora mixer in place to keep Anoxic tank solids | | Town/Village Interconnect | - | moving. May need to consider this in future updates. | | 2020 test indicated this was not a viable option for Village | - | Sand Filter Rebuild | | flow in case of emergency. Engineering review currently in | - | Sand Filters have never been rebuilt or media replaced. Should | | place. | - | price and schedule for the near future. | | Well Level/Flow | - | Train Down for Review | | Well level monitors have been reviewed with a variety of | - | One process train is down for review of deficiencies. Review to | | repairs that were required. Currently looking at options for | - | be completed this week and sent for review. | | communication to wells 14 & 15 as there is a short in wiring | - | Blower System Maintenance | | between the plant and the wells | - | Belts,oils and filters were replaced. | | - | - | Pump Station | | - | - | Pump Station pumps clogging issues have been an issue for | | - | - | some time. Pump Station mixing should be implemented to | | - | - | help with pump failure and pump station pump outs. | | - | - | Backflow Prev. Replacement | | - | - | Facilities backflow Preventor in need of replacement. | |For Future Notes:|||