Water & Wastewater Treatment Monthly Report — January 2023

Meetings/Documents/att::2023-03-13_minutes_378__b09
Attached document2023-03-13

Village of Red Hook Water & Wastewater Treatment

7467 South Broadway, Red Hook, New York 12571

03/06/2023

Water SystemWater SystemWastewater System
Water System Notes:Wastewater System Notes: Sample results for January 2023, with reporting submitted on or
before February 28, 2023.
Monthly Total ColiformAll monthly coliform tests were completed withJanuary 2023
-no presence of coliform or e. coliRequired Samples
--Result
--Compliance
--BOD
--<4.0
--TSS
--10
--10 mg/L
--NH3
--0.77
--1.81 mg/L
--Fecal Coliform
--<1.0
--200/100 mL
Deficiencies-Deficiencies
Well Control Issues-Anoxic Mixers
Waiting for SCADA update-Currently a Medora mixer in place to keep Anoxic tank solids
Town/Village Interconnect-moving. May need to consider this in future updates.
2020 test indicated this was not a viable option for Village-Sand Filter Rebuild
flow in case of emergency. Engineering review currently in-Sand Filters have never been rebuilt or media replaced. Should
place.-price and schedule for the near future.
Well Level/Flow-Train Down for Review
Well level monitors have been reviewed with a variety of-One process train is down for review of deficiencies. Review to
repairs that were required. Currently looking at options for-be completed this week and sent for review.
communication to wells 14 & 15 as there is a short in wiring-Blower System Maintenance
between the plant and the wells-Belts,oils and filters were replaced.
--Pump Station
--Pump Station pumps clogging issues have been an issue for
--some time. Pump Station mixing should be implemented to
--help with pump failure and pump station pump outs.
--Backflow Prev. Replacement
--Facilities backflow Preventor in need of replacement.