Red Hook WatchIndependent Community Resource

NetDMR Submittal Confirmation Email — March 29, 2026

1 versions2026-02-01attached document

Versions

  1. 12026-02-01

Document

Jennifer Cavanaugh

From: netdmr-notification@epa.gov Sent: Sunday, March 29, 2026 11:34 AM To: R3.NetDMR@dec.ny.gov; compliance@h2oinnovation.com; jcavanaugh@redhookvillage.gov; lcoon@jcoinc.org Subject: NetDMR DMR(s) Submittal Passed for: NY0271420 Follow Up Flag: Follow up Flag Status: Flagged

The following signed 2 DMR(s) were submitted to EPA and were successfully processed:

CDX Transaction ID: _a057cc3c-887a-4ac3-b5a6-b1f1f8de9eb3 User ID: COONJ1974 Timestamp: 03/27/2026 16:57:56


Permitted Facility Name: VILLAGE OF REDHOOK WWTP Permit ID: NY0271420 Permitted Feature: 01A

Discharge: M - INTERNAL OUTFALL Monitoring Period End Date: 02/28/26


Permitted Facility Name: VILLAGE OF REDHOOK WWTP Permit ID: NY0271420 Permitted Feature: 01B

Discharge: M - INTERNAL OUTFALL Monitoring Period End Date: 02/28/26

Thank you.

This is a submission from the LIVE (Production) site.

1

Referenced by

These other documents cite or incorporate this one:

  • 2026-02-01EPA DMR — February 2026
    — pins a specific version of this chain
    Document B is a confirmation email acknowledging submission of Document A; they are separate artifacts in a submission workflow, not revisions of the same instrument.
  • 2026-04-09Report Noncompliance Event — SPDES Permit Violation
    — pins a specific version of this chain
    Document A is a noncompliance report filed with DEC; Document B is a separate NetDMR submittal confirmation—two distinct regulatory filings about the same permit, not revisions of the same instrument.
  • 2026-04-13NYS DEC SPDES Wastewater Facility Report — Plant 1 (March 2026)
    — pins a specific version of this chain
    Document A is a regulatory wastewater facility report submitted to NYS DEC; Document B is a confirmation email of that submission—two separate artifacts in a compliance workflow, not a revision of the same instrument.
  • 2026-04-13NYS DEC SPDES Wastewater Facility Report — Plant 2 (March 2026)
    — pins a specific version of this chain
    Document A is a regulatory wastewater facility report (March 2026 data); Document B is a NetDMR submittal confirmation email (March 29, 2026) acknowledging receipt of that report to the state—they are separate artifacts in a compliance workflow, not revisions of the same document.
  • 2026-02-01SPEDES Monthly Operation Report — Facility 1
    Document B is a confirmation email referencing submission of Document A (the monthly operation report) to a regulatory system; they are separate artifacts with different purposes.
  • 2026-02-012 2026
    Document B is a confirmation email of a NetDMR submittal, referencing a separate regulatory filing action distinct from Document A's working document on WWTP operations.
  • 2026-02-202026 02 20
    Document A is a working document on WWTP operations dated February 2026; Document B is a NetDMR submittal confirmation email from March 2026—two separate artifacts in different formats addressing different slots (operations planning vs. regulatory filing confirmation).
  • 2026-02-262026 02 26
    Document A is a working document on WWTP operations dated February 2026; Document B is a NetDMR submittal confirmation email dated March 29, 2026—two separate artifacts in different formats addressing different aspects of wastewater operations, with B referencing or confirming submission of a regulatory document rather than revising A.
  • 2026-03-09Sewer Operations Report — Late January/February 2026
    Document B is a separate administrative confirmation of a regulatory filing, while Document A is an operational report; they share a topic (sewer compliance) but are distinct documents serving different purposes.
  • 2026-03-09March 9 2026 SEWER OPERATIONS REPORT
    Document B is a confirmation email referencing submission of a separate NetDMR report, not a revision of Document A's sewer operations report.
  • 2026-04-09Report Noncompliance Event — Village of Red Hook SPDES Permit Violation
    Document A is a noncompliance report filed with DEC; Document B is a separate NetDMR submittal confirmation—two distinct regulatory filings about the same facility but different submission processes and slots.
  • 2026-04-09Report Noncompliance Event – WWTP Plants 1A & 1B Solids Loss
    Document A is a noncompliance report filed with DEC; Document B is a separate NetDMR submittal confirmation—two distinct regulatory filings related to the same facility but serving different slots (report violation vs. confirm submission).
  • 2026-04-09DEC Noncompliance Report Forms
    Document A is a monthly operational report for February 2026; Document B is a NetDMR submittal confirmation email dated March 29, 2026 — they are separate documents in different slots (operational reporting vs. regulatory submission confirmation), not revisions of the same instrument.
  • 2026-04-13EPA Discharge Monitoring Report (DMR) — February 2026
    Document B is a confirmation email acknowledging receipt of Document A; they are separate artifacts in a submission workflow, not revisions of the same instrument.

Recurring pattern

These other chains use the same template but are separate decisions: