Village of Red Hook ~ Sewer Department 1 Monthly Report ’ ' June 2024

We continue to work with the village engineer on the planning of expansion phase II. Additionally, we are working to make the process as easy as possible for residents to understand the process involved in being added to the use area (space permitting) and if there are any intended use changes in existing lots.

As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain matters!

If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, option 8. Press the “Silence Alarm” button ONLY AFTER notifying the Sewer Operator. Please do not open the box or tamper with Village owned equipment.

Village of Red Hook LY Speed Limit Initiative ' Monthly Report ‘ 1 June 2024

Our engineers are looking over all the data for the second and third part of the study. We have also been informed that other local municipalities are aiming to lower their speed limits which should only aid in our efforts to do so with DOT.

Village of Red Hook ~ Town of Red Hook Greenway and Trails Committee ’ Monthly Report ‘ 1 June 2024

The Greenway and Trails Committee did not meet in the month of June.

References

This document cites or incorporates the following separate documents:

  • 2024-08-05NYS DEC Wastewater Facility Operation Report — June 2024
    — pinned to version dated 2024-08-05
    Document A is a village monthly report covering multiple departments; Document B is a NYS DEC regulatory compliance report for the wastewater facility—two separate documents serving different slots (internal reporting vs. state regulatory filing), though both address June 2024 operations.

Recurring pattern

These other chains use the same template but are separate decisions: