WORK CHANGE DIRECTIVE NO. 3
PROJECT: Village of Red Hook Water System SCADA Upgrades Project
DATE OF ISSUANCE: 10/11/24 EFFECTIVE DATE: 10/11/24
OWNER: Village of Red Hook OWNER’s Contract No.: Contract #1E ENGINEER: Delaware Engineering ENG Project No.: 21-2337 CONTRACTOR: Avanti Control Systems, Inc. Contract Date: 10/17/23
You are hereby directed to proceed promptly with the following change(s):
Description(s):
Item #1: Furnish and install the Chlorine analyzer.
Attachement(s):
Item #1: Avanti Allowance #3 Proposal – dated 10/4/24.
Payment(s):
These items will be paid out of the Contract #1E Allowance:
Item #1: A not to exceed cost of $ 9,056.54 as provided in Avanti Control Systems proposal dated 10/4/24.
Contract Time:
Item #1: Estimated increase (decrease) in Contract Time: Substantial Completion 0 days Final Completion 0 days
Changes in work requests and associated costs shall comply with Articles 11 and 13 of the General Conditions. If a claim is made that the above change(s) have affected Contract Price or Contract Times any such claims shall be processed in accordance with Article 13 of the General Conditions.
When signed by the Owner, Engineer/Architect and received by the Contractor, this document becomes effective IMMEDIATELY as a Work Change Directive (WCD), and the Contractor shall proceed with the change(s) described above.
| above. | |
|---|---|
| Recommended for Approval by ENGINEER: | Date: |
| 10/11/24 | |
| Authorized for OWNER by: | Date: |
| Accepted for CONTRACTOR by: | Date: |
WORK CHANGE DIRECTIVE
PAGE 1 OF 1
Mayfield Commerce Park 204 Co. Hwy 157 Gloversville, NY 12078 Ph: (518) 921 4368
==> picture [156 x 53] intentionally omitted <==
PROJECT ALLOWANCE
CONTRACTOR: Avanti Control Systems, Inc. 204 Co. Hwy. 154 Gloversville, NY 12078
ALLOWNCE # 3
DATE 10/4/2024
PROJECT:
The material and labor listed below have been added to the project under contract allowance monies.
Village of Red Hook Contract 1E Water Systems SCADA Upgrades SRF Number 18-787 (Engineer Pin 21-2337)
| QTY | UNIT | DESCRIPTION | PRICE | AMOUNT |
|---|---|---|---|---|
| 1 | Lot | Avanti Control Systems - HACH Analyzer | $ 9,056.54 | $ 9,056.54 |
| Proposal 24Q112 | ||||
| Note: HACH Chlorine Analyzer | ||||
| TimothyTesiero VP | - | - | - | 9,056.54 |
| 10/4/2024 | - | - | - | $ |
| Your Name, Title | - | - | - | - |
| Date | - | - | - | - |
| Signature | - | - | - | - |
| Date of Acceptance | - | - | - | - |
| Remaining Allowance Balance | - | - | - | - |
| Accepted- The above prices and specifications of this | - | - | - | - |
| change are satisfactory and are hereby accepted. All work | - | - | - | - |
| to be performed under same terms and conditions as | - | - | - | - |
| WE AGREE hereby to make the change(s) specified above at this price | - | - | - | - |
| Contract Allowance Amount | - | - | - | - |
| Previous Allowance Balance | - | - | - | - |
| 25,000.00 | ||||
| $ | ||||
| $15,787.50 | ||||
| $ 6,730.96 | ||||
Accepted - The above prices and specifications of this change are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated.