g Village ofRed Hook Water & Wastewater Treatment oNE[al] 746708/03/2022 South Broadway, Red Hook, New York 12571 Consulting

==> picture [460 x 301] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collectedfrom each well |Wastewater System Notes: Sample results for June 2022, with reporting submitted on or with below regulatory limit results. We are currently working with Delaware Engineering | before July 28th 2022. to try and get reduced monitoring requirements. Monthly All monthly coliform tests were completed Required Samples Result Compliance Total Coliform with no presence of coliform or e. coli cBOD oh June 2022 TSS 7.2 10 me/L NH3 <0.50 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies WellWell 93 Vent Pressure Gauge ScheduledScheduled forfor week week of of 08/1208/11 Anoxic Mixers moving.CurrentlyfdMayMedora need merto considermnplore this to inKeepfutureAnon updates.tank solids Well 15 Number Placard information has been sentfor sign to be made. L [etieer][ etal] sand Filters have never been rebuilt or media replaced. Should Weil Control issues Well controls need to be evaluated as communication issues price and schedule for the nearfuture. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance parts have been ordered. Waiting for oll & belts. Town/Village interconnect 2020 test indicated this was not a viable option for Village flow in case ofemergency. Engineering review currently in | pump Station Pump Station pumps clogging issues have been an Issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to wells 14 & 15 as there is a shortin wiring between the plant and the wells Storage Tank Inspections All storage tanks have been inspected and are awaiting report. For Future Notes: ----- End of picture text -----

Recurring pattern

These other chains use the same template but are separate decisions: