Red Hook WatchIndependent Community Resource

Facility 1 — August 2025

1 versions2025-10-06attached document

Versions

  1. 12025-10-06
    attached document

Document

92-15-7 (11/95)-- 27c

Page 1 of 4

New York State Department of Environmental Conservation Division of Water

| SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | SPEDES PRMIT NO. | FACILITY L | FACILITY L | OCATION | OCATION | | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | FACILITY OWNER | - | - | Red Hook, NY | Red Hook, NY | | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | FACILITY NAME | - | - | - | - | | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | WASTEWATER FACILITY OPERATION REPORT FOR THE MONTH OF: August 2025 | - | - | - | - | | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | NY-0271420 | - | - | - | - | | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | Village of Red Hook | - | - | - | - | | same | same | same | same | same | same | same | same | same | same | same | same | - | - | - | - | |DAY|DATE|Daily Precip. in/day|VOLUME OF SEWAGE TREATED|||TEMPERATURE (°F)||pH (S.U.)||||Settleable Solids (ml/l)||B.O.D.5. (mg/l)||Suspended Solids(mg/l)|| ||||Inst.Max. MGD|Dly Average. MGD|Inst.Min. MGD|Influent (2)|Effluent (2)|Influent Minimum|Influent Maximum|Effluent Minimum|Effluent Maximum|Influent Maximum|Effluent Maximum|Influent Type|Effluent Type|Influent Type|Effluent Type| ||1|2.60||0.0314|||75.6|||7.71|7.71||<0.1||||| ||2|0.00||0.0354|||72.5|||7.48|7.48||<0.1||||| ||3|0.00||0.0290|||71.8|||7.31|7.31||<0.1||||| ||4|0.00||0.0430|||71.9|||7.41|7.41||<0.1||||| ||5|0.00||0.0256|||72|||7.71|7.71||<0.1||||| ||6|0.00||0.0450|||71|||7.48|7.48||<0.1||||| ||7|0.00||0.0366|||73|||7.67|7.67||<0.1||||| ||8|0.00||0.0248|||72.8|||7.50|7.50||<0.1||||| ||9|0.00||0.0379|||75.9|||7.80|7.80||<0.1||||| ||10|0.00||0.0310|||75.8|||7.40|7.40||<0.1||||| ||11|0.00||0.0286|||77.2|||7.50|7.50||<0.1||||| ||12|0.00||0.0316|||76.4|||7.20|7.20||<0.1||||| ||13|0.50||0.0311|||76.2|||7.37|7.37||<0.1|||64|1.4| ||14|0.00||0.0288|||76.1|||7.54|7.54||<0.1||||| ||15|0.00||0.0438|||76|||7.59|7.59||<0.1||||| ||16|0.00||0.0178|||77.5|||8.10|8.10||<0.1||||| ||17|0.00||0.0346|||77.8|||7.70|7.70||<0.1||||| ||18|0.00||0.0263|||77.1|||7.62|7.62||<0.1||||| ||19|0.00||0.0236|||72.4|||7.68|7.68||<0.1||||| ||20|0.30||0.0378|||73.4|||7.65|7.65||<0.1||||| ||21|0.70||0.0384|||75.5|||7.77|7.77||<0.1||||| ||22|0.00||0.0278|||76.4|||7.50|7.50||<0.1||||| ||23|0.00||0.0300|||76|||7.51|7.51||<0.1||||| ||24|0.00||0.0176|||75.9|||7.57|7.57||<0.1||||| ||25|0.00||0.0334|||73.8|||7.78|7.78||<0.1||||| ||26|0.00||0.0263|||75.2|||7.78|7.78||<0.1||||| ||27|0.00||0.0355|||72.1|||7.74|7.74||<0.1||||| ||28|0.00||0.0252|||73|||7.34|7.34||<0.1|||53|1.9| ||29|0.00||0.0206|||73.9|||7.46|7.46||<0.1||||| ||30|0.00||0.0247|||72.4|||7.49|7.49||<0.1||||| ||31|0.00||0.0365|||72|||7.50|7.50||<0.1||||| | Total | - | - | Influent | - | - | - | - | - | - | - | - | Monthly | - | inf.(mg/l) | - | inf.(mg/l) | | Precip. | - | - | Effluent | - | - | - | - | - | - | - | - | Monthly | - | eff.(mg/l) | - | eff.(mg/l) | | 4.10 | - | - | Minimum | - | - | - | - | - | - | - | - | Maximum | - | Daily Max | - | Daily Max | | - | - | - | Maximum | - | - | - | - | - | - | - | - | Maximum | - | - | - | - | | - | - | - | Minimum | - | - | - | - | - | - | - | - | 0.0 | - | - | - | - | | - | - | - | Maximum | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | 0.031 | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | 77.8 | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | 7.2 | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | 8.1 | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | Max: | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | 0.0450 | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | Monthly | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | Average | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | Monthly Maximum | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | - | - | Monthly | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||||||||||||0.0|||53|1.9| |||||||||||||||%Rem.->||%Rem.->|96| |||||||||||||30 Day Average Quantity Loading (1)||lbs/day||0.49 lbs/day||

  • (1) Refer to January 1994 edition of DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System (NPDES) for procedures to calculate loadings, arithmetic mean, geometric Mean, maximum, minimum, percent removal, etc

(2) If Temperature is measured more than once a day, report the average for the day

NOTE: Refer to current SPDES permit for specific monitoring requirements. Sample type for temperature, PH and settleable solids is grab

Page 2 of 4

|FACILI|TY MAIL|ING ADDRESS (Street, City, Zip Code)|ING ADDRESS (Street, City, Zip Code)|ING ADDRESS (Street, City, Zip Code)|ING ADDRESS (Street, City, Zip Code)|TELEPHONE NUMBER|TELEPHONE NUMBER|TELEPHONE NUMBER|Leslie A Coon Jr CHIEF OPERTATOR'S NAME|CERTIFICATION GRADE 3A| |---|---|---|---|---|---|---|---|---|---|---| |DAY|DATE|TOTAL PHOSPHORUS(mg/l)||Ultraviolet||FECAL COLIFORM||REMARKS Enter any other comments, observations, operating problems, equipment failures, etc.||| |||Influent Type|Effluent Type|Contact|Effluent|Effluent MF or MPN/100ml||||| |||||Minimum|Maximum|||||| ||1|||ON|ON|||||| ||2|||ON|ON|||||| ||3|||ON|ON|||||| ||4|||ON|ON|||||| ||5|||ON|ON|||||| ||6|||ON|ON|||||| ||7|||ON|ON|||||| ||8|||ON|ON|||||| ||9|||ON|ON|||||| ||10|||ON|ON|||||| ||11|||ON|ON|||||| ||12|||ON|ON|||||| ||13|||ON|ON||<10|||| ||14|||ON|ON|||||| ||15|||ON|ON|||||| ||16|||ON|ON|||||| ||17|||ON|ON|||||| ||18|||ON|ON|||||| ||19|||ON|ON|||||| ||20|||ON|ON|||||| ||21|||ON|ON|||||| ||22|||ON|ON|||||| ||23|||ON|ON|||||| ||24|||ON|ON|||||| ||25|||ON|ON|||Odor complaint called in, Post investigation the source was a contractor laying fresh asphalt||| ||26|||ON|ON|||||| ||27|||ON|ON|||||| ||28|||ON|ON||<10|||| ||29|||ON|ON|||||| ||30|||ON|ON|||||| ||31|||ON|ON|||||| |||Influent mg/l Effluent mg/l 30 day flow-weighted avg mean(1)||Minimum(1) Maximum(1) ON ON Monthly||<10 30 day geometric mean(1)||||| ||||Effluent mg/l|Minimum(1) ON||||||| |||||||||||| |||lbs/day||||||||| ||||||||||||

(1) Refer to January 1994 edition of DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System (NPDES) for procedures to calculate loadings, arithmetic mean, geometric Mean, maximum, minimum, percent removal, etc NOTE: Refer to current SPDES permit for specific monitoring requirements. Sample type for temperature, PH and settleable solids is grab

Page 3 of 4

|||||||||||Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control|Activated Sludge Process Control Fixed Media Process Control||| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Day | Date | Influent | - | Influent | - | Influent | - | Influent | - | Recirculation | Media effluent | Mixed Liquor | - | - | Return Act. | | - | 1 | Effluent | - | Effluent | - | Effluent | - | Effluent | - | Rate | settleable solids | S.S. (MLSS) | - | - | Waste Act. | | - | 2 | NH3 as N | - | DO | - | - | - | - | - | - | - | mg/l | - | - | Sludge (RAS) | | - | 3 | - | - | - | - | - | - | - | - | - | - | 5 Minutes | - | - | Sludge (WAS) | | - | 4 | - | - | - | - | - | - | - | - | - | - | 30 minutes | - | - | M.G.D. | | - | 5 | - | - | - | - | - | - | - | - | - | - | Settleable Sludge | - | - | lbs/day | | - | 6 | - | - | - | - | - | - | - | - | - | - | Volume (SSV) ml/l | - | - | - | | - | 7 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 8 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 9 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 10 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 11 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 12 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 13 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 14 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 15 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 16 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 17 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 18 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 19 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 20 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 21 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 22 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 23 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 24 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 25 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 26 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 27 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 28 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 29 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 30 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | | - | 31 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |||||||||||M.G.D|ml/l|||||| ||||||7.5|||||||||||| ||||||7.9|||||||||||| ||||||7.8|||||||||||| ||||||7.0|||||||||||| ||||||8.4|||||||||||| ||||||8.1|||||||||||| ||||||8.7|||||||||||| ||||||8.1|||||||||||| ||||||7.9|||||||||||| ||||||7.7|||||||||||| ||||||7.3|||||||||||| ||||||7.0|||||||||||| ||||0.096||7.0|||||||||||| ||||||7.2|||||||||||| ||||||7.4|||||||||||| ||||||7.8|||||||||||| ||||||7.5|||||||||||| ||||||7.9|||||||||||| ||||||7.3|||||||||||| ||||||7.2|||||||||||| ||||||7.4|||||||||||| ||||||7.3|||||||||||| ||||||7.3|||||||||||| ||||||7.6|||||||||||| ||||||7.8|||||||||||| ||||||8.0|||||||||||| ||||||7.6|||||||||||| ||||0.055||8.1|||||||||||| ||||||8.2|||||||||||| ||||||8.0|||||||||||| ||||||7.6|||||||||||| |||MAX:||MIN:||||||||||||| ||||0.096||7.0|||||||||||| |||||||||||||||||| |Quantity Loading (1) 30 Day Average||||||||||||||||| |||lbs/day||lbs/day||lbs/day||lbs/day|||||||||

(1) Refer to January 1994 edition of DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System (NPDES) for procedures to calculate loadings, arithmetic mean, geometric Mean, maximum, minimum, percent removal, etc

Page 4 of 4

Effect on Receiving Stream

Effect on Receiving StreamEffect on Receiving StreamEffect on Receiving StreamEffect on Receiving StreamEffect on Receiving StreamEffect on Receiving StreamEffect on Receiving Stream
Name of Receiving Stream
Shanty Hollow Creek
Date
Station
Parameter
Result

|Name and am during month: a.|ount of chemicals used in treatment process gallons| |---|---| |b.|gallons| |c.|Gallons| |d.|lbs.| |e.|Gallons| |f.|Gallons| | Amount of ece | ctrical power consumed: | | a. Commercial | kilowatt hours | | b. Stand-by | - | | Amount of fuel | - | | a. Natural Gas | - | | b. Oil | - | | c. Gasoline | - | | d. Coal. | - | | e. Digester Ga | - | | f. propane | - | ||kilowatt hours| ||consumed: cubic feet| ||gallons| ||gallons| ||tons| ||s cubic feet| ||gallons|

==> picture [188 x 47] intentionally omitted <==

----- Start of picture text -----

Sludge removal from plant: a. amount 10000 b. solid content c. Volitile Solids Content d. Disposal Site: Superior Sanitation ----- End of picture text -----

Other Solid Wastes:

a. Screenings b. Grit c. Ashes d. e. f. g. Disposal Site

Digester Gas Wasted

Labor expended:

TRUCKED WASTE RECEIVED THIS MONTH

==> picture [178 x 26] intentionally omitted <==

----- Start of picture text -----

1- Septage, holding tank waste and portable toilet waste Total Max day ----- End of picture text -----

==> picture [65 x 15] intentionally omitted <==

----- Start of picture text -----

Volume (Gal.) 2- All other wastes ----- End of picture text -----

==> picture [16 x 4] intentionally omitted <==

----- Start of picture text -----

Max day ----- End of picture text -----

==> picture [9 x 4] intentionally omitted <==

----- Start of picture text -----

Total ----- End of picture text -----

  • 3- Number of Part 364 haulers currently approved to transport wastes to this POTW

a.Septage,etc

b. All others

Labor expended:
POSITION NAMENUMBER FULL TIMENUMBER PART TIMETOTAL HOURS
Operator6262
Chief Operator3131

I hereby affirm under penalty of perjury that information provided on this form is true to the best of my knowledge and belief. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.

Leslie A Coon Jr.

Signature of Chief Operator or Designated Facility Representative

9/24/2025

Date

Changes between versions

2025-05-082025-05-12
substantive change+2222

The document title and scope have changed to include Speed Limit Initiative and Greenway/Trails Committee reports.

  • Title changed from 'Wastewater Facility Operation Report for the Month of March 2025' to 'Speed Limit Initiative & Town of Red Hook Greenway and Trails Committee Monthly Reports — April 2025'
  • Added introductory text regarding a compost program, sign renderings by Colin Packard, and logo work by Polina Malikin
  • Document date changed from 2025-05-08 to 2025-05-12
Show red-line diff
about the upcoming compost program. We even had a few people sign up for it – however, I think they’re town residents. But it is always great to engage with chat with the members of our community. The website page has been created and designed and waiting for final uploading to our site and Sign Painter Colin Packard has created a few renderings of the big sign for the shed which would also include the Village Logo as well as acknowledge the County for their financial sponsorship. I also want to thank Polina Malikin for her work on the program’s logo. Outfall 1A - New Plant ## 92-15-7 (7/91)-27c NEW YORK STATE DEPARTMENT OF ENVIROMENTAL CONSERVATION ## DIVISION OF WATER ||||||||||||||||DIVISION OF WATER|DIVISION OF WATER|DIVISION OF WATER|DIVISION OF WATER||||||||||||||||||||||||||Page 1 of 4|Page 1 of 4|| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**||||||||||||**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**||||||||March|||||||||2025|||||||||||||||||| |**NY--**<br>SPDES PERMIT<br>0271420||||FACILITY NAME<br>Village of Red Hook Sewer||||||||||FACILITY OWNER<br>Village of Red Hook|||||||7467 S Broadway Red Hook, NY12571|FACILITY LOCATION<br>7467 S Broadway Red Hook, NY12571|||||||7467 S Broadway Red Hook, NY12571|||||||||||||||||| |Day|Date||Daily<br>Precip<br>in/day|Inst.Max.<br>MGD<br>VOLUME OF SEWAGE TREATED||Inst.Max.<br>Daily<br>Average<br>MGD<br>VOLUME OF SEWAGE TREATED||Inst. Min<br>MGD<br>VOLUME OF SEWAGE TREATED||Influent<br>(2)<br>Effluent<br>(2)<br>TEMPERATURE (ºF.)|||||Influent<br>Minimum|Influent<br>Maximum<br>Effluent<br>Minimum<br>pH (S.U)|||||Effluent<br>Maximum||SETTLEABLE SOLIDS<br>Influent<br>Maximum<br>Effluent<br>Maximum|||||B.O.D.5<br>Influent<br>Type<br>Effluent<br>Type||||||||||SUSPENDED SOLIDS<br>Influent<br>Type<br>Effluent<br>Type||||||||| |Sat|01||0.01||||0.029||||49||48||||6.6||||7.6||<0.1||<0.1|||||||||||||||||||||| |Sun|02||T||||0.036||||47||49||||6.5||||7.4||<0.1||<0.1|||||||||||||||||||||| |Mon|03||0.00||||0.043||||52||47||||6.6||||7.6||80||<0.1|||||||||||||||||||||| |Tue|04||0.00||||0.044||||49||51||||7.2||||7.5||110||<0.1|||||||||||||||||||||| |Wed|05||0.01||||0.045||||47||50||||6.1||||7.5||5||<0.1|||||||||||||||||||||| |Thur|06||0.98||||0.048||||46||50||||6.8||||7.7||3||<0.1|||||||||||||||||||||| |Fri|07||0.09||||0.042||||48||49||||6.8||||7.5||3||<0.1|||||||||||||||||||||| |Sat|08||0.00||||0.036||||48||46||||6.7||||7.4||3||<0.1|||||||||||||||||||||| |Sun|09||0.00||||0.032||||49||46||||6.7||||7.2||<0.1||<0.1|||||||||||||||||||||| |Mon|10||0.00||||0.036||||48||48||||7.1||||7.4||60||<0.1|||||||||||||||||||||| |Tue|11||0.00||||0.040||||49||48||||6.7||||7.5||5||<0.1||||||||||82|||||||||104||| |Wed|12||0.00||||0.054||||47||46||||6.7||||7.6||4||<0.1|||||||||||||||||||||| |Thur|13||0.00||||0.037||||48||49||||6.7||||7.8||4||<0.1|||||||||||||||||||||| |Fri|14||0.00||||0.046||||49||49||||6.7||||7.9||3||<0.1|||||||||||||||||||||| |Sat|15||0.00||||0.036||||48||47||||6.9||||7.2||<0.0||<0.1|||||||||||||||||||||| |Sun|16||0.00||||0.052||||48||50||||7.4||||7.2||50||<0.1|||||||||||||||||||||| |Mon|17||0.85||||0.047||||48||49||||6.6||||7.3||3||<0.1|||||||||||||||||||||| |Tue|18||0.05||||0.038||||50||50||||6.6||||8.4||3||<0.1|||||||||||||||||||||| |Wed|19||0.00||||0.044||||48||49||||6.7||||7.9||2||<0.1|||||||||||||||||||||| |Thur|20||0.00||||0.002||||50||51||||6.7||||7.9||2||<0.1|||||||||||||||||||||| |Fri|21||0.81||||0.051||||51||52||||6.7||||8.0||0||<0.1|||||||||||||||||||||| |Sat|22||0.00||||0.035||||55||51||||7.2||||7.8||3||<0.1|||||||||||||||||||||| |Sun|23||0.00||||0.035||||58||53||||7.3||||7.6||4||<0.1|||||||||||||||||||||| |Mon|24||T||||0.035||||56||51||||7.0||||7.7||2||<0.1|||||||||||||||||||||| |Tue|25||0.13||||0.042||||51||50||||6.9||||7.7||2||<0.1|||||||||||||||||||||| |Wed|26||0.00||||0.034||||50||51||||6.8||||7.8||0||<0.1|||||||||||||||||||||| |Thur|27||0.09||||0.059||||49||50||||7.8||||7.9||0||<0.1|||||||||||||||||||||| |Fri|28||0.00||||0.045||||51||51||||6.8||||7.9||0||<0.1|||||||||||||||||||||| |Sat|29||0.01||||0.039||||48||50||||7.2||||7.9||4||<0.1|||||||||||||||||||||| |Sun|30||0.06||||0.029||||49||50||||7.1||||7.9||3.0||<0.1|||||||||||||||||||||| |Mon|31||0.17||||0.038||||46||50||||6.8||||8.4||<0.1||<0.1|||||||||||||||||||||| ||||Total<br>Precip.||||Monthly<br>Average|||Average<br>Influent||Average|Average<br>Effluent|Average|Minimum|Maximum||Minimum|||Maximum||Monthly<br>Maximum|Monthly<br>Maximum|||30 day flow-weighted avg (1)<br>Inf.(mg/l) Eff.(mg/l) Rem.%|||||||||||30 day flow-weighted avg<br>(1) Inf.(mg/l) Eff.(mg/l)<br>Rem.%||||||||| ||||3.26||||0.040||||49||49||6.1||7.8||7.2||8.4||110.0||<0.1|||||82||||||####||||||104|||####|| ||||||||||||||||||||||||30 Day Quanity|30 Day Quanity||||27.11|||||||lbs/day||||34.39||||||lbs/day|| **==> picture [564 x 462] intentionally omitted <==** **----- Start of picture text -----**<br> FACILITY MAILING ADDRESS (Street, City, State, Zip code) TELEPHONE NUMBER CHIEF OPERATOR'S NAME CERTIFICATION GRADE<br>14 Old Route 199 Red Hook, NY 12571 845-244-0129 C3ND ENVIRONMENTAL 2A<br>TOTAL PHOSPHORUS(mg/l) Ultra Violet FECAL COLIFORM<br>MW/CM2 Effluent REMARKS<br>Influent Effluent MF or MPN/100ml Enter any other comments, observations, operating problems, equipment failure, etc<br>#1 #2<br>Day Date Type Type<br>Sat 01 100% 0% Red Hook Commons UV'S not currently working & in need of replacement of Bulb's.<br>There has been customer complaints referencing odor from wastewater treatment plant, intial<br>investigation found that some odors are coming from odoris wastewater discharge, while other<br>investigations have found that the odor seems to be coming from the facilities EQ tank vent. The<br>Sun 02 100% 0% village is aware & are working on a remdiation for the odors from the EQ vent line.<br>Mon 03 100% 0%<br>Tue 04 100% 0%<br>Wed 05 100% 0%<br>Thur 06 100% 0%<br>Fri 07 100% 0%<br>Sat 08 100% 0%<br>Sun 09 100% 0%<br>Mon 10 100% 0%<br>Tue 11 100% 0% 24196<br>Wed 12 100% 0%<br>Thur 13 100% 0%<br>Fri 14 100% 0%<br>Sat 15 100% 0%<br>Sun 16 100% 0%<br>Mon 17 100% 0%<br>Tue 18 100% 0%<br>Wed 19 100% 0%<br>Thur 20 100% 0%<br>Fri 21 100% 0%<br>Sat 22 100% 0%<br>Sun 23 100% 0%<br>Mon 24 100% 0%<br>Tue 25 100% 0%<br>Wed 26 100% 0%<br>Thur 27 100% 0%<br>Fri 28 100% 0%<br>Sat 29 100% 0%<br>Sun 30 100% 0%<br>Mon 31 100% 0%<br>30 day flow-weighted avg.(1) Monthly 30 day Geometric Mean (<br>Influent(mg/ Effluent(mg/l Minimum(1)Maximum<br>0 1 24196<br>lbs/day<br>**----- End of picture text -----**<br> - (1) Refer to current edition of "Notice to SPDES Permitees Regarding Use of the National Pollutant Discharge Elimination System (NPDES) Discharge Monitoring Report Form" for procedures to calculate loadings, flow-weighted average, geometric mean, maximum minimum, percent removal, etc. Note: Refer to current SPDES permit for specific monitoring requirements. Sample type for chlorine residual and fecal coliforms is grab. 58.2 **==> picture [635 x 489] intentionally omitted <==** **----- Start of picture text -----**<br> FIXED MEDIA ACTIVATION SLUDGE<br>PROCESS CONTROL PROCESS CONTROL<br>Media<br>Dissolved Ammonia as Effluent Mixed Return Act. Waste Act.<br>TKN as Nitrogen [Ulimate Oxygen ] Recirculation Settleable Liquor Settleable Sludge Sludge Sludge<br>Oxygen Nitrogen Demand Rate Solids S.S. (MLSS) Volume (SSV) ml/l (RAS) (WAS)<br>Day Date Effluent Effluent Effluent Effluent M.G.D ml/l mg/l 30Min 60 Min M.G.D Gallons<br>Sat 01 7.8<br>Sun 02 7.5<br>Mon 03 7.4<br>Tue 04 7.4<br>Wed 05 7.2<br>Thur 06 7.1<br>Fri 07 7.2<br>Sat 08 7.1<br>Sun 09 7.3<br>Mon 10 7.2<br>Tue 11 7.4 42.4 50.5 350.25<br>Wed 12 7.7<br>Thur 13 7.2<br>Fri 14 7.9<br>Sat 15 8.1<br>Sun 16 7.3<br>Mon 17 7.6<br>Tue 18 7.7<br>Wed 19 7.8<br>Thur 20 8.2<br>Fri 21 7.6<br>Sat 22 7.7<br>Sun 23 5.6<br>Mon 24 6.8<br>Tue 25 7.1<br>Wed 26 8.0<br>Thur 27 5.3<br>Fri 28 7.0<br>Sat 29 5.0<br>Sun 30 7.0<br>Mon 31 6.1<br>7.2<br>lbs/day lbs/day 0.000 lbs/day<br>**----- End of picture text -----**<br> |**Effect on Receiving Stream**|**Effect on Receiving Stream**|**Effect on Receiving Stream**|||Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Name and amount of chemicals used in treatment process|Sludge Removal from Plant:|Sludge Removal from Plant:|Sludge Removal from Plant:|Sludge Removal from Plant:||||| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |NAME OF RECEIVING STREAM|NAME OF RECEIVING STREAM||||during month.|||||||a.|Amount|||||gallons|| ||||||a. Chlorine|a. Chlorine||||lbs.||b.|Solid Content|||||%|| |DATE|STATION|PARAMETER RESULT|||b.|Sodium Hypochlorite||||gal.||c.|Volatile Solids Content|||||%|| ||||||c.|soda Ash||||lbs.||d.|Disposal Site||Superior Sanitation|Superior Sanitation|||| ||||||d.|||||lbs.|||||||||| ||||||e.|||||lbs.|||||||||| ||||||f.|||||lbs.|||||||||| ||||||Amount of electrical power consumed||||||||Other Solid Waters:||||||| ||||||a.|Commercial|||kilowatt hours|||a.|Screening|||||cubic feet|| ||||||b.|Stand-by|||kilowatt hours|||b.|Grit|||||cubic feet|| |||||||||||||c.|Ashes|||||tons|| ||||||Amount of fuel consumed||Amount of fuel consumed|||||d.|||||||| ||||||a.|Natural Gas||||cubic feet||e.|||||||| ||||||b.|Oil||||gallons||f.|||||||| ||||||c.|Gasoline||||gallons||g.|Disposal Site Private hauler||||||| ||||||d.|Coal||||tons|||||||||| ||||||e.|Digester Gas||||cubic feet|||||||||| ||||||f.|Propane||||gallons||Digester Gas Wasted||||||cubic feet|| ||||||Labor expended:||||||||||||||| |||||||||POSITION NAME|||NUMBER FULL TIME<br>NUMBER PART TIME||||NUMBER PART TIME||TOTAL HOURS||| ||||||||Supervisor||||||||||||| ||||||||Chief Operator||||||||||||| ||||||||Operator||||||||||||| ||||||||Mechanic||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||I hereby affirm under penality of perjury that information proided on this form is true to the best of my knowledge and belief. False statements made|||||||I hereby affirm under penality of perjury that information proided on this form is true to the best of my knowledge and belief. False statements made|||||I hereby affirm under penality of perjury that information proided on this form is true to the best of my knowledge and belief. False statements made||| ||||||herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.||||||||herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.||||||| ||||||||||||||||||||| ||||||||||||||||||||| ||||||Signature of Chief Operator or Designated Facility Representative|||||||Signature of Chief Operator or Designated Facility Representative|||||||| Outfall 1B - Red Hook Commons Plant |**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025|**WASTEWATER FACILITY OPERATION REPORT FOR THE MONT**<br>March<br>2025| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |**NY--**<br>SPDES PERMIT<br>FACILITY NAME<br>FACILITY OWNER<br>FACILITY LOCATION<br>0271420<br>7467 S BroadwayRed Hook,NY12571<br>Village of Red Hook Sewer<br>Village of Red Hook|||||||||||||||||| |Day|Date|Daily<br>Precip<br>in/day|VOLUME OF SEWAGE TREATED|||TEMPERATURE(ºF.)||~~Influent~~<br>pH(S.U)||||SETTLEABLE SOLIDS||B.O.D.5||SUSPENDED SOLIDS|| ||||Inst.Max.<br>MGD|Inst.Max.<br>Daily<br>Average<br>MGD|Inst. Min<br>MGD|Influent<br>(2)|Influent<br>Effluent<br>(2)|Influent<br>Minimum|~~Influent~~<br>Maximu<br>m|Effluent<br>Minimum|Effluent<br>Maximum|Influent<br>Maximum|Effluent<br>Maximum|Influent<br>Type|Effluent<br>Type|Influent<br>Type|Effluent<br>Type| |Sat|01|0.01||0.010||58|50||7.8||7.7|24.0|<0.1||||| |Sun|02|T||0.015||52|50||7.9||7.5|25.0|<0.1||||| |Mon|03|0.00||0.011||51|50||7.7||7.5|28.0|<0.1||||| |Tue|04|0.00||0.004||51|47||7.7||7.4|32.0|<0.1||||| |Wed|05|0.01||0.001||52|49||7.8||7.5|39.0|<0.1||||| |Thu|06|0.98||0.009||47|50||7.7||7.6|60.0|<0.1||||| |Fri|07|0.09||0.002||54|51||7.8||7.7|25.0|<0.1||||| |Sat|08|0.00||0.007||52|54||7.7||7.6|43.0|<0.1||||| |Sun|09|0.00||0.004||56|51||7.8||7.9|40.0|<0.1||||| |Mon|10|0.00||0.015||52|52||7.6||7.6|110.0|<0.1||||| |Tue|11|0.00||0.005||55|55||7.7||7.5|30.0|<0.1||28||44| |Wed|12|0.00||0.002||54|52||7.8||7.5|35.0|<0.1||||| |Thu|13|0.00||0.001||55|51||7.6||7.8|22.0|<0.1||||| |Fri|14|0.00||0.003||53|52||7.8||7.9|28.0|<0.1||||| |Sat|15|0.00||0.005||56|52||7.9||7.4|32.0|<0.1||||| |Sun|16|0.00||0.005||58|56||7.8||7.7|32.0|<0.1||||| |Mon|17|0.85||0.001||49|48||7.8||7.6|28.0|<0.1||||| |Tue|18|0.05||0.009||47|51||7.8||8.0|35.0|<0.1||||| |Wed|19|0.00||0.010||50|52||7.9||7.8|31.0|<0.1||||| |Thu|20|0.00||0.043||52|49||7.9||7.6|34.0|<0.1||||| |Fri|21|0.81||0.001||57|50||7.9||7.8|30.0|<0.1||||| |Sat|22|0.00||0.004||57|53||7.2||8.3|42.0|<0.1||||| |Sun|23|0.00||0.005||56|52||7.1||8.1|50.0|<0.1||||| |Mon|24|T||0.005||56|51||7.4||7.7|30.0|<0.1||||| |Tue|25|0.13||0.003||55|53||7.3||7.8|38.0|<0.1||||| |Wed|26|0.00||0.009||57|55||7.3||8.0|24.0|<0.1||||| |Thu|27|0.09||0.008||55|54||8.0||8.2|25.0|<0.1||||| |Fri|28|0.00||0.000||56|53||8.0||8.3|45.0|<0.1||||| |Sat|29|0.01||0.003||58|55||7.9||7.9|40.0|<0.1||||| |Sun|30|0.06||0.002||57|55||7.9||7.9|51.0|<0.1||||| |Mon|31|0.17||0.002||56|56||8.1||8.1|35.0|<0.1||||| |Total<br>Precip.<br>Monthly<br>Average<br>Average<br>Influent<br>Average<br>Effluent<br>Minimum<br>Maximu<br>m<br>Minimum Maximum<br>3.26<br>0.007<br>54<br>52<br>7.1<br>8.1<br>7.4<br>8.3||Total<br>Precip.<br>3.26||Monthly<br>Average<br>0.007||Average<br>Influent<br>Average<br>Effluent<br>54<br>52||Average<br>Minimum<br>Maximu<br>m<br>Minimum Maximum<br>7.1<br>8.1<br>7.4<br>8.3||||Monthly<br>Maximum<br>110.0|Monthly<br>Maximum<br><0.1|####<br>30 day flow-weighted avg<br>(1) Inf.(mg/l) Eff.(mg/l)<br>Rem.%<br>28||####<br>30 day flow-weighted avg<br>(1) Inf.(mg/l) Eff.(mg/l)<br>Rem.%<br>44|| |||||||||||||30 DayQuanity||lbs/day<br>1.57||lbs/day<br>2.47|| 2 |2|2|2|2|2|2||||| |---|---|---|---|---|---|---|---|---|---| |FACILITY MAILING ADDRESS (Street, City, State, Zip code)<br>14 Old Route 199 Red Hook,NY 12571||||||TELEPHONE NUMBER<br>845-244-0129||CHIEF OPERATOR'S NAME<br>C3ND ENVIRONMENTAL|CERTIFICATION GRADE<br>2A| |||TOTAL PHOSPHORUS(mg/l)||Ultra Violet||FECAL COLIFORM|<br>Enter any other comments, observations, operating problems, equipment failure, etc<br>REMARKS||| |Day|Date|Influent<br>Type|Effluent<br>Type|#1<br>#2<br>MW/CM2||Effluent<br>MF or MPN/100ml|||| |Sat|01|||25%|0%||Red Hook Commons UV'S not currentlyworking& in need of replacement of Bulb's.||| |Sun|02|||25%|0%||There has been customer complaints referencing odor from wastewater treatment plant, intial<br>investigation found that some odors are coming from odoris wastewater discharge, while other<br>investigations have found that the odor seems to be coming from the facilities EQ tank vent. The<br>village is aware & are workingon a remdiation for the odors from the EQ vent line.||| |Mon|03|||25%|0%||||| |Tue|04|||25%|0%||||| |Wed|05|||25%|0%||||| |Thu|06|||25%|0%||||| |Fri|07|||25%|0%||||| |Sat|08|||25%|0%||||| |Sun|09|||25%|0%||||| |Mon|10|||25%|0%||||| |Tue|11|||25%|0%|2|||| |Wed|12|||25%|0%||||| |Thu|13|||25%|0%||||| |Fri|14|||25%|0%||||| |Sat|15|||25%|0%||||| |Sun|16|||25%|0%||||| |Mon|17|||25%|0%||||| |Tue|18|||25%|0%||||| |Wed|19|||25%|0%||||| |Thu|20|||25%|0%||||| |Fri|21|||25%|0%||||| |Sat|22|||25%|0%||||| |Sun|23|||25%|0%||||| |Mon|24|||25%|0%||||| |Tue|25|||25%|0%||||| |Wed|26|||25%|0%||||| |Thu|27|||25%|0%||||| |Fri|28|||25%|0%||||| |Sat|29|||25%|0%||||| |Sun|30|||25%|0%||||| |Mon|31|||25%|0%||||| |||30 day flow-weighted avg.(1)<br>Influent(mg/l Effluent(mg/||l Minimum(1)Maximum<br>0<br>0<br>Monthly||30 day Geometric Mean (<br>2|||| |||lbs/day|||||||| - (1) Refer to current edition of "Notice to SPDES Permitees Regarding Use of the National Pollutant Discharge Elimination System (NPDES) Discharge Monitoring Report Form" for procedures to calculate loadings, flow-weighted average, geometric mean, maximum minimum, percent removal, etc. Note: Refer to current SPDES permit for specific monitoring requirements. Sample type for chlorine residual and fecal coliforms is grab. |||||||||||FIXED MEDIA<br>PROCESS CONTROL|FIXED MEDIA<br>PROCESS CONTROL|PROCESS CONTROL<br>ACTIVATION SLUDGE|PROCESS CONTROL<br>ACTIVATION SLUDGE|PROCESS CONTROL<br>ACTIVATION SLUDGE|PROCESS CONTROL<br>ACTIVATION SLUDGE|PROCESS CONTROL<br>ACTIVATION SLUDGE| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |||Dissolved<br>Oxygen||<br>Ammonia as<br>Nitrogen||TKN as Nitrogen||Ulimate Oxygen<br>Demand||Recirculation<br>Rate|Media Effluent<br>Settleable<br>Solids|<br>Mixed<br>Liquor<br>S.S.(MLSS)|Volume(SSV)ml/l<br>Settleable Sludge||Return Act.<br>Sludge<br>(RAS)|<br>Waste Act.<br>Sludge<br>(WAS)| |Day|Date||Effluent||Effluent||Effluent||Effluent|M.G.D|ml/l|mg/l|30Min|60 Min|M.G.D|Gallons| |Sat|01||7.8|||||||||||||| |Sun|02||7.5|||||||||||||| |Mon|03||7.4|||||||||||||| |Tue|04||7.9|||||||||||||| |Wed|05||7.2|||||||||||||| |Thu|06||7.1|||||||||||||| |Fri|07||7.2|||||||||||||| |Sat|08||7.1|||||||||||||| |Sun|09||7.3|||||||||||||| |Mon|10||7.2|||||||||||||| |Tue|11||7.4||12.7||13.8||104.1|||||||| |Wed|12||7.7|||||||||||||| |Thu|13||7.2|||||||||||||| |Fri|14||7.9|||||||||||||| |Sat|15||8.1|||||||||||||| |Sun|16||7.3|||||||||||||| |Mon|17||7.6|||||||||||||| |Tue|18||7.7|||||||||||||| |Wed|19||7.8|||||||||||||| |Thu|20||8.2|||||||||||||| |Fri|21||7.6|||||||||||||| |Sat|22||7.7|||||||||||||| |Sun|23||5.6|||||||||||||| |Mon|24||6.8|||||||||||||| |Tue|25||7.1|||||||||||||| |Wed|26||8.0|||||||||||||| |Thu|27||5.3|||||||||||||| |Fri|28||7.0|||||||||||||| |Sat|29||5.0|||||||||||||| |Sun|30||7.0|||||||||||||| |Mon|31||6.1|||||||||||||| |||||||||||||||||| |||||lbs/day||lbs/day||0.000<br>lbs/day||||||||| |**Effect on Receiving Stream**<br>NAME OF RECEIVING STREAM<br>DATE<br>STATION<br>PARAMETER RESULT|**Effect on Receiving Stream**<br>NAME OF RECEIVING STREAM<br>DATE<br>STATION<br>PARAMETER RESULT|**Effect on Receiving Stream**<br>NAME OF RECEIVING STREAM<br>DATE<br>STATION<br>PARAMETER RESULT|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite|Name and amount of chemicals used in treatment process<br>Sludge Removal from Plant:<br>during month.<br>a. Amount<br>gallons<br>a. Chlorine<br>lbs.<br>b. Solid Content<br>%<br>b.<br>gal.<br>c. Volatile Solids Content<br>%<br>c.<br>lbs.<br>d. Disposal Site<br>d.<br>lbs.<br>e.<br>lbs.<br>f.<br>lbs.<br>Amount of electrical power consumed<br>Other Solid Waters:<br>a. Commercial<br>kilowatt hours<br>a. Screening<br>cubic feet<br>b. Stand-by<br>kilowatt hours<br>b. Grit<br>cubic feet<br>c. Ashes<br>tons<br>Amount of fuel consumed<br>d.<br>a. Natural Gas<br>cubic feet<br>e.<br>b. Oil<br>gallons<br>f.<br>c. Gasoline<br>gallons<br>g. Disposal Site Private hauler<br>d. Coal<br>tons<br>e. Digester Gas<br>cubic feet<br>f. Propane<br>gallons<br>Digester Gas Wasted<br>cubic feet<br>Labor expended:<br>Superior Sanitation<br>soda Ash<br>Sodium Hypochlorite| |---|---|---|---|---|---|---|---|---|---| |NAME OF RECEIVING STREAM|||||||||| |DATE<br>STATION|PARAMETER|RESULT|||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||Other Solid Waters:<br> Screening<br> Grit<br> Ashes|||cubic feet<br>cubic feet<br>tons|| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||Disposal Site Private hauler||||| ||||||||||| ||||||||||| |||||||||cubic feet|| ||||||||||| ||||POSITION NAME|NUMBER FULL TIME|||NUMBER PART TIME||<br>TOTAL HOURS| ||||Supervisor||||||| ||||Chief Operator||||||| ||||Operator||||||| ||||Mechanic||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||I hereby affirm under penality of perjury that information proided on this form is true to the best of my knowledge and belief. False statements made<br>herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.<br>Signature of Chief Operator or Designated Facility Representative||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| ||||||||||| |||||||||||

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

  • 2025-08-012025 08 01 Date of Noncompliance Report 2025 09 28
    — pins a specific version of this chain
    Document A is a noncompliance report dated August 2025; Document B is a separate facility report for August 2025 that Document A likely references or cites as supporting evidence.
  • 2025-08-01EPA Discharge Monitoring Report (DMR) — August 2025
    — pins a specific version of this chain
    Both are separate attached monitoring/facility reports for the same August 2025 period; one is an EPA DMR and the other is a facility report—different document types serving different regulatory purposes, not revisions of the same instrument.
  • 2025-08-018 2025
    Document A is a working document on WWTP operations from January 2020; Document B is an August 2025 facility report—separate artifacts from different time periods that may be cited together but occupy different slots in the board's work.
  • 2025-09-08Sewer Department Report — August 2025
    Both documents report on the same sewer/wastewater operations for August 2025, with Document B appearing to be a revised or more complete version of Document A covering the same operational period and decisions.
  • 2025-10-06WWTP Discharge Monitoring Report and Noncompliance Report — August 2025
    Both documents report the same WWTP facility's discharge monitoring data for August 2025, with Document B appearing to be a revised or reformatted version of the same monthly compliance report.
  • 2025-10-06SPEDES Permit Operation Report — Plant 2 — September 2025
    Both are separate monthly wastewater facility reports for different facilities (Plant 2 vs. Facility 1) filed on the same date; they are distinct regulatory documents, not revisions of the same instrument.
  • 2025-10-06EPA Discharge Monitoring Report — September 2025
    Document A is a regulatory noncompliance report filed with DEC; Document B is a separate facility operational report—they reference the same facility but serve different documentary purposes and slots (regulatory filing vs. internal facility reporting).

Recurring pattern

These other chains use the same template but are separate decisions: