Red Hook WatchIndependent Community Resource

Water Board — 2023-08-03

1 versions2023-08-03meeting minutes

Versions

  1. 12023-08-03

Document

TOWN OF RED HOOK WATER DISTRICT NO. 1 Public Water System ID: NY 1302788 August 3, 2023 Work Session Summary June 2023 Monthly Reports

Attendees: Hank Van Parys, Chairman, Doreen Buono, Secretary Ferando Dongo, C3ND, Bill Hamel, Liason

Monthly Items

Normal

June 2023

Water Pumped

64.55 Kgpd

81.5 Kgpd

  1. Well levels:

Well 1 – Well 2 –

38.2 Running 30.3 Running

Well 1 Well 2 -

49.2 Resting 35.3 Resting

Note: Well Levels are the number of feet of water above the pump. Pumps are at different levels 2. Pump Volumes: Well # 1 Well # 2

Pumping @ Pumping @

91 GPM 98 GPM

  1. Coliform Report

none detected

  1. Turbidity (NTU)

<1.0 required .05 NTU* *(Nepthalometric Turbitdity Units)

  1. Chlorine Residual

<1.0 goal

Page 1 of 3

NONE

0.7 PPM* *(parts per Million)

Ongoing Items: 

2023 Water Test Requirements: PFOS - yearly due by 12/31/23 PFOA - yearly due by 12/31/23 DIOXANE - yearly due by 12/31/23 Asbestos - every 9 Yrs. due in 12/2030 Lead, Copper - every 3 years due by 9/30/24 (10 Sites between 6/3 & 9/3) Nitrate - yearly due by 12/31/23 POC & MTBE - yearly due by 12/31/23 Inorganics - yearly due by 12/21/2023 Radiological every 9 years due by 12/31/2030 Disinfection by-products: THMS - yearly HAA5 - yearly

due by 7/1/23 – 9/30/23 due by 12/31/23

Current Inventory: We have 6 5 Micron filter cartridges in stock. We have 6 1 Micron filter cartridges in stock. Top-seals in stock = 3 -- reorder Filters replaced week of 5/22/23 SODIUM HYPOCHLORITE (chlorine) current supply: IN 5 GALLON CONTAINERS: Empty = 18/ Full = 14

Page 2 of 3

Status:

Ongoing items continued”:

Storage Tank: At the January Water Board Meeting, the board decided the best approach is to rebuild vs. Rehab.

Biofilm Build Up in the Tank: Fernando and Bryan have overflowed the tank twice. Both times the chlorine residual was adequate. The long-range solution is to purchase and install tank-to-pump communication, either radio or cellular. Dan Valentine will prepare an RFP. We will have the tank inspected in 2025 to ascertain if/when we should purchase a new tank.

Valve Installation: Fernando will look into installation of a valve in the water main in the Manor/Colonial area. He will also think about how to locate galvanized pipe on south side of Aspinwall. This pipe is no longer used but, is still connected to the water main on the north side. This pipe has leaked in the past, se we should find and disconnect it.

New Connection: A new connection at Victory Lane off of North Drive requires a special meter pit. Long lead times for these! Fernando proposed a temporary solution with a meter in the house. When we get a meter pit we will convert to the meter pit.

Mapping: Fernando will give us a proposal.

Page 3 of 3