Red Hook WatchIndependent Community Resource

Cannabis Storage Use Site Plan Approval

1 versions2023-08-10#op-_08102023-410-03inline resolution

Document

Cannabis Storage Use Site Plan Approval

RESOLVED

  • Approve the proposed site plan for storage use at 7536 North Broadway listed under Tax Parcel ID 6272-06-470753 with the following condition: The Planning Board is hereby granted the right to require adjustments to the exterior lighting up to a maximum of 60 days after the issuance of a Certificate of Occupancy, but limited to the adjustment, dimming and /or shielding of the lighting fixtures only.

Changes between versions

2023-08-142023-09-11
substantive change+224

The document expanded from a single committee report to a combined report including the Sewer Department and Speed Limit Initiative.

  • Title changed from 'Village Green Committee Monthly Report August 2023' to 'Village Green Committee & Speed Limit Initiative Monthly Reports August 2023'
  • Budget account balance date changed from 'Aug. 1, 2023' to 'Sept. 7'
  • Village Green Committee Checking Account Balance increased from '$7,674.32' to '$11,476.32'
  • Village Green Committee meeting status updated from 'no... Mee�ngs held during the month of July, 2023' to 'no formal... Mee�ngs held during the month of August, 2023'
  • Added 'Village of Red Hook Sewer Department Monthly Report August 2023' section
  • Added 'Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023' section
Show red-line diff
Village of Red Hook Village Green Commi�ee Monthly Report August 2023 The Current balances of the Village Green Commi�ee’s related budget accounts, as of AugSept. 1, 20237 are as follows: 1. Community Beau�fica�on – contractual expenses (#8510.4) ----- (-) 2. Shade Tree – contractual expenses (#8560.4) ------------------------- (-) 3. Village Green Commi�ee Checking Account Balance -------------------$711,674476.32-- There were no formal Village Green Commi�ee Mee�ngs held during the month of JulyAugust, 2023. However, Dave and I met to coordinate for the upcoming Fall Plan�ng which will take place in November and for future grant opportuni�es. Part of the role of the Village Green Commi�ee is to promote access to the green spaces in our village and part of that is fulfilling Bench requests/dona�ons. The bench dona�ons from the VFW are in design mode and are moving forward and hopefully will be solidified this month. Residents and businesses interested in having a tree(s) planted on their adjacent Village street or NYS highway right-of-ways, volunteering for plan�ng days, or sponsoring a VGC beau�fica�on project, may contact David Pearson, myself, Kym Bradley-Rickard, or the Jen Cavanaugh- Village Clerk. The upcoming mee�ng will be to discuss the Fall Plan�ng that happens in November. Feel free to join to see what is happening and to prepare for the fall plan�ng in November. Village of Red Hook Sewer Department Monthly Report August 2023 This last month we took a trip to the Waste Water Treatment Plant (WWTP) to familiarize ourselves with the layout poten�al maintenance issues and spur ideas for the future of the sewer. During the month of July the average daily flow was 9 Million Gallons Per day at Plant B (old Red Hook Commons Plant) and 40 Million gallons per day at Plant A (New plant). There were samples sent out for tes�ng and all came back normal. There are a few items needed for repair/maintenance. There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project. As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain ma�ers! If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, op�on 8. Press the “Silence Alarm” bu�on ONLY AFTER no�fying the Sewer Operator. Please do not open the box or tamper with Village owned equipment. Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023 As summer is rounding the corner, I reached back out to our contact at the engineer firm and the next steps are for them to prepare a proposal which will be reviewed by the Board. The proposed traffic study will cover at least one to two streets per quadrant focusing on high traffic roads and neighborhoods. We will take considera�on from exis�ng studies to inform areas of interest and what would be best for the Village businesses and residents.
2023-09-112023-10-10
substantive change+68

The document was consolidated to focus solely on the Village Green Committee and saw a reduction in the Committee checking account balance.

  • Title changed from 'Village Green Committee and Speed Limit Initiative Monthly Reports — August 2023' to 'Village Green Committee Monthly Report — August 2023'
  • Document date advanced from 2023-09-11 to 2023-10-10
  • Village Green Committee Checking Account Balance decreased from $11,476.32 to $10,261.20
  • Removed the 'Village of Red Hook Speed Limit Initiative Monthly Report August 2023' section
  • Removed specific Sewer Department flow data regarding '9 Million Gallons Per day at Plant B' and '40 Million gallons per day at Plant A'
  • Added information regarding a newly established quarterly meeting schedule and a grant submission
Show red-line diff
Village of Red Hook Village Green Commi�ee Monthly Report August 2023 The Current balances of the Village Green Commi�ee’s related budget accounts, as of Sept. 7 are as follows: 1. Community Beau�fica�on – contractual expenses (#8510.4) ----- (-) 2. Shade Tree – contractual expenses (#8560.4) ------------------------- (-) 3. Village Green Commi�ee Checking Account Balance -------------------$1110,476261.3220-- There were no formalThe Village Green Commi�ee Meemet last month as part of the newly established quarterly mee�ng schedule. There was a discussion about the history of the VGC, tree plan�ngs heldand during the month of August, 2023recruitment. However,They Davealso andused Ithis metmee�ng tofor coordinatepreliminary planning for the upcoming Fall Planplan�ng which will takehappen placeearly into mid-November. Addi�onally, we discussed the grant applica�on and forprocess. futureThe grant opportuniwas submies.ed Partat the end of the rolemonth. Word should come middle to end of theOctober Villageabout Greenany Commi�ee is to promote access to the green spaces in our village and part of that is fulfilling Bench requests/dona�ons. The bench dona�ons from the VFW are in design mode and are moving forward and hopefully will be solidified this monthaward. Residents and businesses interested in having a tree(s) planted on their adjacent Village street or NYS highway right-of-ways, volunteering for plan�ng days, or sponsoring a VGC beau�fica�on project, may contact David Pearson, myself, Kym Bradley-Rickard, or the Jen Cavanaugh- Village Clerk. The upcomingnext regularly scheduled mee�ng will be to discuss the FallSecond Plan�ngSunday thatof happensDecember inat November6 p. Feel free to join to see what is happening and to prepare for the fall plan�ng in Novemberm. Village of Red Hook Sewer Department Monthly Report August 2023 ThisWe lastcon�nue monthto meet regularly to discuss the final steps for the sewer project. We met on 29[th] to discuss the need for some bigger plans and to address the requests and future requests to connect. Currently we tookare aworking tripon edits to the Wastecode Waterand Treatmentensuring Plantall (WWTP)documenta�on is up to familiarize ourselves with the layout poten�al maintenance issuesdate and spur ideas for the future of the sewer. During the month of July the average daily flow was 9 Million Gallons Per day at Plant B (old Red Hook Commons Plant) and 40 Million gallons per day at Plant A (New plant). There were samples sent out for tes�ng and all came back normal. There are a few items needed for repair/maintenanceaccurate. There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project. As a reminder to all residents whether you are in the Sewer Use Area or not be kind to your pipes! Please put only 3 P’s in the toilet: Pee, Poop and (Toilet) Paper and while in the kitchen (or near other drains) no Fats, Oils, or Grease “FOG” – they clog up the pipes and make the system stressed. What goes down the drain ma�ers! If you are in the sewer use area and the emergency alarm goes off, call the Village Sewer Operator (845) 758-1081, op�on 8. Press the “Silence Alarm” bu�on ONLY AFTER no�fying the Sewer Operator. Please do not open the box or tamper with Village owned equipment. Village of Red Hook Speed Limit Ini�a�ve Monthly Report August 2023 AsWe summerhave isreconnected rounding the corner, I reached back out to our contact atwith the engineer firm and the next steps are for them to prepare a proposal which will be reviewed by the Board. The proposed traffic study will cover at least one to two streets per quadrant focusing on high traffic roads and neighborhoods. We will take considera�on from exis�ng studies to inform areas of interest and what would be best for the Village businesses and residents.

Recurring pattern

These other chains use the same template but are separate decisions: