Authorize the Mayor to sign Sewer Easements

1 versions2018-04-09#9-2018inline resolution

Document

Original file not available onlineView version history →Meeting on 2018-04-09 →

Authorize the Mayor to sign Sewer Easements

Resolution #9-2018 — 2018-04-09

WHEREAS

  • In accord with the sewer project there will be sewer mains and a septic tank installed on village property at village hall and sewer mains running through the village parking lot
  • Easement documents, related documents and site maps are in possession of the village and required signature by the Mayor

RESOLVED

  • The Village Board authorizes the Mayor to sign the required easements documents and related filing forms.

Changes between versions

2025-07-142025-07-14
clerical+00

No substantive changes between versions.

  • Minor formatting change in title: added em-dash between 'Report' and 'Water/Sewer Department'
Show red-line diff
## Utility Billing Report Water/Sewer Department June 2025 |Utility Billing Report<br>Water/Sewer Department<br>June 2025|| |---|---| |Utility Bills Issued|$415.00| |Penalties/Finance Charges Issued|$390.19| |Utility Payments Received|$5,627.84| |Accounts Receivable Outstanding to the Village as of 7/1/2025|$7,720.12| Bill Adjustments[1] - None Submitted by, Jennifer Cavanaugh, Water/Sewer Clerk > 1 All adjustments must be approved by Water Department and Mayor and reviewed by Board of Trustees. One adjustment allowed per 5‐year period.

Referenced by

These other documents cite or incorporate this one:

  • 2018-06-11Authorization for Mayor to Sign Sewer Easements
    Both documents authorize the Mayor to sign sewer easements for the same project, but Document B (April 9) is an earlier, general authorization while Document A (June 11) is a specific authorization for particular numbered easements after they have been reviewed and partially executed; they are separate board actions in sequence, not revisions of the same singular decision.
  • 2018-09-10Authorizing the Mayor to sign easements
    Both documents authorize the Mayor to sign easements for the same sewer project, but Document B (April 2018) is an earlier, general authorization while Document A (September 2018) is a specific authorization for particular numbered easements after they have been reviewed and partially executed; they are separate board actions on the same topic, not revisions of the same singular decision.