Red Hook WatchIndependent Community Resource

Building / Planning & Zoning Department Fees

1 versions2022-06-13working document

Versions

  1. 12022-06-13

Document

Original file not available online (local: data/sources/village_docs/dc_789_buildingplanningzoning_fees.pdf)View version history →Meeting on 2022-06-13 →

Village of Red Hook

Building / Planning & Zoning Department Fees

Approved on June 13, 2022

Application / CertificateFee
Residential Construction$0.35 / sf; $100.00minimum
Commercial Construction$0.50 / sf; $200.00minimum
Decks / Porches Open$0.35 / sf; $100.00minimum
Demolition Permit
(when not associatedwith
construction)Residential - $100.00
Garages/Barns - $150.00
Commercial - $200.00
Barns/Pole
Barn/Shed/Detached
Garage$0.35 / sf; $100.00minimum
Solar Energy Collection
Systems (Photovoltaic
Panels), Roof or Ground
Mounted$0.35 / sf; $100.00minimum
Roof Mounted, building permit only.
Ground Mounted by
Planning BoardApproval
Fence Permits$100.00/ 1st100linearfeet
$0.35 thereafter
AgriculturalStructures
(Proof of Ag
Exemption/Status
Required at time of
Submission.N/A
Building without a
Building Permit
(Post Built Permit)Double the Calculated Fee
Certificate of OccupancyCollect with Building Permit Application
$50.00Residential
$100.00Commercial
Abstract C/O /
Municipal Search$100.00

Village of Red Hook

Building / Planning & Zoning Department Fees

Approved on June 13, 2022

|Driveway Permit

(Village Roads)$100.00
Generator$75.00
Electrical Work / Upgrade$100.00
Solid Fuel Permit:
Wood, Coal, Pellet$100.00
Operating Permits$100.00
Pools: In-ground, Above
GroundIn Ground $200.00
Above Ground $150.00
Spa/Hot Tubs$100.00
Sign Permit$100.00flat
Fire Inspections$100.00 PER UNIT up to 2,500 sf;
2,501—5,000 sf=$150.00
5,001–10,000 sf=$200.00
Roof Repair / Replacement$100.00 for Residential ONLY
SEE NEW SCHEDULE
ATTACHED FOR
COMMERICAL STRUCTURES
Oil Tank Abandonment/
Replacement
(inside or underground)$100.00
Planning Board:
SITE PLAN REVIEW$200.00 w/ SEAF; $300.00 w/ FEAF
Allmailingsto be donebyapplicantReceipts reviewed at
Meetingfor
completeness

Village of Red Hook

Building / Planning & Zoning Department Fees

Approved on June 13, 2022

Planning Board: MINOR SUBDIVISION & $300.00 plus $150.00/lot Planning Board: MAJOR SUBDIVSION Planning Board: LOT LINE $200.00 ADJUSTMENT Receipts reviewed at Zoning Board: $100.00 plus all mailings to be done by meeting for AREA VARIANCE Applicant completeness Receipts reviewed at Zoning Board: $100.00 plus all mailings to be done by meeting for USE VARIANCE Applicant completeness Zoning Board: $50.00 Interpretation SEQRA: SEAF $200.00 SEQRA: FEAF $300.00

ESCROW MAY BE REQUESTED BY PLANNING & ZBA BOARDS PER VILLAGE OF RED HOOK ZONING §200-54

FIRE INSPECTIONS:

In the event the Fire Inspector is required to inspect premises a third time to ensure compliance with the Code an additional fee of $100.00 is to be charged

In the event the Fire Inspector is required to inspect premises a fourth time to ensure compliance with the Code an additional fee of $125.00 is to be charged

In the event of non-compliance with the Fire Inspector's Recommendations after a fourth visit the property owner will be subject to fines and expenses imposed by the Village Justice Court per Village Code Chapter 95.

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: