Water System SCADA Upgrades project bid acceptance
One-time (complete)operationalone_timeAccept the low bid from General Control Systems, Inc. for $320,219.00 (base bid $310,839.00 plus bid alternative $9,380.00) for the Water System SCADA Upgrades project.
First seen
2023-09-28
Latest event
2023-09-28
adopted
Expires
—
Resolution text
RESOLVED
- the Water System SCADA Upgrades project low bid submitted by General Control Systems, Inc. for $320,219.00 is accepted
Document references
Cites or incorporates
- 2023-10-10Award Water System SCADA Upgrades contract
- 2023-08-14Resolution Authorizing the Solicitation of Public Bids for Water System Scada Upgrades and Water Tank Rehabilitation
- 2023-12-11Accept Low Bid Cherry and Graves Street Water Upgrades
- 2025-08-11Water System SCADA Upgrades Change Order No. 2
- 2024-10-17Work Change Directive No. 3 — Village of Red Hook Water System SCADA Upgrades
- 2023-10-10Award Water Tank Rehabilitation contractTwo separate water infrastructure projects with different scopes, bidders, and contract amounts; one accepts a SCADA bid, the other awards a tank rehabilitation contract.
- 2023-10-06Water System SCADA Upgrades September 20th, 2023 Bid Revised Recommendation to AwardBoth documents address the same singular board decision slot (awarding the Water System SCADA Upgrades bid), with Document B revising the award from the original low bidder (General Control Systems, $320,219) to the next-lowest bidder (Avanti Control Systems, $416,700) due to the first bidder's withdrawal.
- 2023-10-06Notice of Award — Water System SCADA Upgrades Contract 1EDocument A accepts a bid from General Control Systems for $320,219; Document B is a Notice of Award to a different bidder (Avanti Control Systems) for $416,700 on the same project—these are separate board actions in different slots (bid acceptance vs. contract award notice) and involve different contractors.
Cited by
- 2022-10-03Pfoa/s Removal and Water System Resiliency Upgrades—seqr Type Ii ClassificationDocument A classifies a water system project for SEQR purposes; Document B accepts a bid for a different component (SCADA upgrades) of what may be the same overall initiative, but they occupy different slots (environmental classification vs. bid acceptance) and are separate board actions.
- 2023-10-10Resolution Authorizing the Solicitation of Public Bids for Cherry & Graves Streets Water UpgradesDocument A authorizes solicitation of bids for Cherry & Graves Streets Water Upgrades; Document B accepts a bid for a different project (Water System SCADA Upgrades), representing separate board actions on distinct artifacts.
Lifecycle (1 event)
2023-09-28adoptedvote: unanimous
Accept the low bid from General Control Systems, Inc. for the Water System SCADA Upgrades project at $320,219.00.
moved by Smythe · seconded by Kjarval
Show text snapshot for this event
Resolved
- the Water System SCADA Upgrades project low bid submitted by General Control Systems, Inc. for $320,219.00 is accepted
Subject key:
water_scada_upgrades