Red Hook WatchIndependent Community Resource

Building / Planning & Zoning Department Fees

1 versions2026-03-22working document

Document

Original file not available online (local: data/sources/village_docs/doc_2635.pdf)View version history →Meeting on 2026-03-22 →

Building / Planning & Zoning Department Fees

==> picture [559 x 462] intentionally omitted <==

----- Start of picture text -----

Type Fee a Residential - $50.00 Fee applies to all building Formatted: Underline Administration Commercial - $100.00 permits. [| = eee Bounced/Returned Check $25.00 p[——| Certificate of Occupancy or = J Compliance fees will be Construction - Residential $0.7 535 / sf; $2 10 0.00 minimum collected with Building Permit [| o[--A Application Certificate of Occupancy or Construction - Compliance fees will be $0.9 550 / sf; $3 20 0.00 minimum Commercial collected with Building Permit fT I= Application ES. Decks / Porches Open $0.7 535 / sf; $1 500 .00 minimum XN Residential (minor)(<500 sf <a excluding dwelling) - $100.00 Demolition Permit Residential (major)(>500 sf (when not associated with excluding dwelling) - $200.00 Valid for 6 months Formatted: Left construction) Garages/Barns - $150.00 _g Commercial - $200.00 e Residential - $0.75 35 / sf; Barns/Pole $ 21 00.00 minimum Barn/Shed/Detached Commercial - $0.95 / sf; Garage $300.00 minimum Solar Energy Collection Roof Mounted, building Systems (Photovoltaic permit only. $0.7 535 / sf; $1 500 .00 minimum Panels), Roof or Ground Ground Mounted by Planning Mounted Board Approval aN Fence Permits $100.00 / 1 2a [st] 100 linear feet Sketch, specifications, & proof Formatted: Left $0.35 / linear foot thereafter of DigSafeNY required.

  1. A Proof of Ag Exemption/Status Agricultural Structures N/A Required at time of submission. Formatted: Centered | EE Building without a Building Formatted: Font: +Body (Calibri), Not Bold Permit Double the Calculated Fee Formatted: Font: +Body (Calibri), Not Bold a (Post Built Permit) ee, P Formatted: Font: +Body (Calibri) o)o Eo) Formatted: Right ----- End of picture text -----

Page 1 of 8

==> picture [559 x 478] intentionally omitted <==

----- Start of picture text -----

Type Fee ee Stop Work Order Violation $500.00 per day ee Stop Work Order Lift $250.00 aeee ee $10 50 .00 Residential Collected with Building Permit Certificate of Occupancy $2 1 00.00 Commercial Application a Temporary Certificate of $250.00 Residential Valid for 3 months Occupancy $300.00 Commercial Abstract C/O / Residential - $1 500 .00 Municipal Search Commercial - $200.00 eee Driveway Permit $100.00 (Village Roads) Pr ee Generator $100 75. 00 ee... Ge Electrical Work / Upgrade $100.00 | [qyyv~n] Solid Fuel Permit: $100.00 Wood, Coal, Pellet DeN. As Operating Permits $100.00 Backflow preventer device In - G round = $25 00 .00 required. Reduced Pressure Swimming Pools: In- Zone (RPZ) backflow Above Ground = $150.00 ground, Above Ground preventers requires annual Spa/Hot Tubs = $100.00 inspection. Certification sent to Building Department. Hens/Honeybee Permit $25.00 a Vv (Zoning §200.18.1) = ee Formatted: Font: +Body (Calibri), Not Bold Formatted: Centered Sign Permit $12 500. 00 flat Formatted: Font: +Body (Calibri), Not Bold i es Formatted: Font: +Body (Calibri) CO Formatted: Right ----- End of picture text -----

Page 2 of 8

==> picture [559 x 503] intentionally omitted <==

----- Start of picture text -----

Type Fee es Residential - $100.00 Site Inspection Commercial - $150.00 | =— | i $150.00 per Unit up to 2,500 sf; **See note below regarding Fire Inspections 2,501 — 5,000 sf = $200.00 additional inspections 5,001 – 10,000 sf = $250.00 Additional Fire Inspections  If the Fire Inspector must inspect premises a second time to ensure compliance with the Code an additional fee of $50.00.  If the Fire Inspector must inspect premises a third time to ensure compliance with the Code an additional fee of $100.00.  If the Fire Inspector must inspect premises a fourth time to ensure compliance with the Code an additional fee of $150.00.  In the event of non-compliance with the Fire Inspector's recommendations after a fourth visit the property owner is subject to fines and expenses imposed by the Village Justice Court as per Village Code §95. $100.00 for Residential Roof Repair / Replacement See Attached Roofing Permit Fee Schedule For Commercial Structures Oil Tank Abandonment/ Replacement $100.00 (inside or underground) Planning Board: $2 50 0.00 w/SEAF; Receipts reviewed at meeting SITE PLAN REVIEW $ 30 50.00 w/FEAF for completeness k@\awai Planning Board: MINOR SUBDIVISION $300.00 w/SEAF or FEAF & See NYS Village Law §7-728 plus $150.00/lot Planning Board: MAJOR SUBDIVISION Planning Board: $200.00 w/SEAF LOT LINE ADJUSTMENT All required mailings are the Formatted: Font: +Body (Calibri), Not Bold Zoning Board: $2 500 .00 responsibility of the applicant. Formatted: Centered AREA VARIANCE Foot Receipts required. LCCO Formatted: Font: +Body (Calibri), Not Bold CC

  • | E Formatted: Font: +Body (Calibri) Eo Co Formatted: Right | Page 3 of 8 a! ----- End of picture text -----

==> picture [559 x 478] intentionally omitted <==

----- Start of picture text -----

Type Fee ee All required mailings are the Zoning Board: a USE VARIANCE $ 520 0.00 responsibility of the applicant. Receipts required. Zoning Board: $150 200.00 INTERPRETATION oeee ee SEQRA: SEAF $200.00 ee SEQRA: FEAF $300.00 a ESCROW MAY BE REQUESTED BY PLANNING & ZBA BOARDS PER 2 ae VILLAGE OF RED HOOK ZONING §200-54 aa ae Sewer Department (Village Code §145) Type Fee . Included in Utility Bill Sewer Capital Fee $179.00 per EDU per quarter Formatted Table 2 m, Gl (quarterly) ee Sewer Rent/Use Fee ee Included in Utility Bill EE, (Operation & $162.00 per EDU per quarter (quarterly) Maintenance) Resolution 5-2026 Sewerage Surcharge/ | Qy [Ys] Volume Charge TBD eXxX™S (§145-117) Capacity Charge TBD -N AN | Locate Water/Sewer Lines See below ‘Water Department’ fees PN) Locate Electric Service eee Lines beyond Utility See below ‘Water Department’ fees Responsibility a Sewer Lateral Permit Ae $100.00 application fee plus eee Application Equipment fees calculated by Paid to Building Department rr (§145-31) Village Engineer Formatted: Centered Sewer Connection Charge (Tap Fee) Equipment & Labor costs calculated Formatted: Font: +Body (Calibri), Not Bold by Village Engineer oo) (§145-51-52) Ee Formatted: Font: +Body (Calibri), Not Bold Formatted: Font: +Body (Calibri) CO Formatted: Right ----- End of picture text -----

Page 4 of 8

==> picture [536 x 495] intentionally omitted <==

----- Start of picture text -----

Dumping Fee TBD (§145-123) Wastewater Discharge Permit – Industrial Use TBD (§145-70) Pretreatment Program TBD (§145-122) Administrative Fine ≤ $1,000 per violation per day (§145-98) Abnormal Sewage Fee TBD (§145-117) Sewer O&M fee includes three (3) Excess Grease Trap Fee added to Utility Bill pump outs per calendar year. All Maintenance Fee (quarterly) additional $ 194.002 14.00/1,000 gal

Water Department (Village Code §195) See §195-26 and below Type Fee Damaged/Frozen Meter $50.00 inspection fee plus cost of (§195-5) replacement equipment Non-Metered Water Service $500.00 per quarter (§195-6) Construction or non- Hydrant Use Application $20.00 construction use $1,500.00 deposit, plus Hydrant Use: Meter Rental Deposit refundable upon $100.00 per day, plus & Use meter return. $0.012 per gallon used Request at least 5 business Final Service Read/Bill $50.00 days before the closing/move out date Fire Flow Evaluation $130.00 Formatted: Font: +Body (Calibri), Not Bold Fee waived in the case of a Formatted: Centered Locate Water/Sewer Lines $50.00 utility locating service request Formatted: Font: +Body (Calibri), Not Bold (e.g., DigSafe/UDig NY) Po Formatted: Font: +Body (Calibri) “Se P [Po] E Formatted: Right o) Page 5 of 8 ----- End of picture text -----

Locate Electric Service Lines beyond Utility $250.00 Responsibility $50.00 Service Turn on/off $100.00 (Emergency event [outside Fee for each event of business hours]) $2,6 50 0.00* (with road cutting/crossing involvem ent,+$500) (within sidewalk, +$500) Tapping Fee (within State road, +$1,000 per lane). Additional charge for water service lines >3/4 inc h $50.00 Service Turn on/off $100.00 (Emergency event [outside For each event of business hours]) ——- Police Department Type Fee Fingerprinting $25.00 Paid to Village Clerk Copy of Police Report $0.25 per page Paid to Village Clerk Village Clerk Type Fee 2b Copies $0.25 per page TN[AND] Ve Returned/Bounced Check $25.00 a eee Formatted: Font: (Default) +Body (Calibri)  Copies = $0.25 per page Formatted: Font: (Default) +Body (Calibri)  Storage device/media = $4.00 Formatted: List Paragraph, Left, Indent: Left: 0.02", each Hanging: 0.19", Bulleted + Level: 1 + Aligned at: 0.26"  - If preparation requires >2 hours, + Indent at: 0.51" FOIL Fees hourly salary attributed to the lowest paid agency employee CP Formatted: Font: (Default) +Body (Calibri) who has the necessary skill PO Formatted: Centered required to prepare a copy of the Po Formatted: Font: +Body (Calibri), Not Bold Rae requested record(s). —CP Formatted: Font: +Body (Calibri), Not Bold CO Formatted: Font: +Body (Calibri) (FO Formatted: Right Page 6 of 8

$10.00 per Certificate or Birth/Death Certificate No Record Certification Yard/Garage Sale Permit $5.00 (§119) EV Charging (ChargePoint Additional ChargePoint fees $0.12/kWh Station in Municipal Lot) may apply. Property Maintenance Type Fee $100.00 per hour, 1-hour minimum. Property Maintenance $200.00 per hour for second Fees billed to property owner. (lawn mowing, weed calendar year (CY) offense, All unpaid fees re-levied on trimming) $300.00 per hour for third CY Village property taxes in April. offense First offense in a season - $2.00/linear foot, sanding/salting $0.50/linear foot Fees billed to property owner. Sidewalk Snow/Ice Second offense - $3.00/linear foot, All unpaid fees re-levied on Removal sanding/salting $0.75/linear foot Village property taxes in April. Third and any subsequent offences - $4.00/linear foot, sanding/salting $1.00/linear foot Fees billed to property owner. $200.00 per hour, 1-hour minimum, Trash Removal All unpaid fees re-levied on per laborer plus tipping fees Village property taxes in April. Waste Management (Village Code §160) Type Fee —_ SQ Small = 13 gal, typically white kitchen bag Large = 30 gal, typically black trash bag Blue Tag (small bag), $3.5 00 * each Garbage Tags Tags available from Village Red Tag (large bag), $7 6. 00* each Clerk, Red Hook Public Library, and Taste Budd’s*. *additional convenience fee may apply Po) Formatted: Font: +Body (Calibri), Not Bold $75.00 for up to 25 bags or Bags in Bulk Pickup $125.00 for up to 50 bags Contact Village Clerk to set up Formatted: Centered (30 gal bags) and pay for service Po Formatted: Font: +Body (Calibri), Not Bold Po Formatted: Font: +Body (Calibri) Eo) Formatted: Right

Page 7 of 8

==> picture [331 x 49] intentionally omitted <==

----- Start of picture text -----

Oversized Items (e.g., $25.00 (additional $10.00 for Tags available from Village mattress, furniture, table, mattresses & box springs) Clerk chair, rug) Contact Village Clerk or DPW Scrap Metal Collection Free to schedule. ----- End of picture text -----

==> picture [381 x 89] intentionally omitted <==

----- Start of picture text -----

Co Formatted: Font: +Body (Calibri), Not Bold Formatted: Centered Formatted: Font: +Body (Calibri), Not Bold Formatted: Font: +Body (Calibri) Formatted: Right Page 8 of 8 nn, ----- End of picture text -----

Changes between versions

2025-10-062025-10-06
clerical+00

No substantive changes were made to the document.

Show red-line diff
October, 6th, 2025 Deputy Mayor Melkorka Kjarval’s Monthly Reports **Red Hook Together** meets every first Thursday of the month. This month's meeting was moved to October 9th in order to not conflict with the Yom Kippur holiday. ## **Village of Red Hook Indigenous History Project:** Historian Heather Bruegl has updated us that she plans on emailing the essay narrative (as referenced in the project proposal 12/9/24 minutes page 19) to the Village in the first week of October. **Town of Red Hook Comprehensive Plan:** The Town committee meets monthly from 7:30pm to 9pm on the fourth Tuesday at Town Hall. The Town of Red Hook Comprehensive Plan Steering Committee met on Tuesday, September 23, 2025. In attendance were the committee members and Committee chair Julia Solomon & consultants Eric Pierson from Patterns for Progress. The September meeting was focused on upcoming community outreach. The Town is hosting an upcoming Comprehensive Plan Public Workshop, which will be on **Tuesday, October 21st, from 7:00-9:00pm at the High School Cafeteria** . The public is encouraged to pre-register here: https://www.pattern-for-progress.org/portfolio/visioningtownofredhookcompplan/ and attend to participate in this process which seeks to determine what issues should be addressed in the plan. Consultants from both Patterns for Progress and Pace Land Use Law Center will help facilitate breakout group sessions with community members. ## **Village of Red Hook Communications:** I have been working on updating the Village Website Menus to make it easier and more intuitive to reach information. I have also been working to split up long pages of information and group information under subheadings when possible. The website now has a “Contact” tab in the main menu which links directly to the many ways you can communicate with the Village. Whenever possible I have tried to remove duplicate information in order to reduce the chance of missing a version of the content when it is updated. I am also trying to replicate formatting and organization when possible, and I have taken time to write explanation summaries of pages that show up in sub menus and search engine results. The hope is that these improvements will seem invisible - but will help you find what you need faster and more easily. Websites are constantly evolving, and the feedback that I have received since the last update 4 years ago is shaping many of the changes reflected now. As always, please feel free to share any feedback, and/or observations of your experience as a Village website user to me directly via email at mkjarval@redhookvillage.gov, or through one of the website contact forms. **Village and Zoning Review:** There will be an Information Session regarding the Gateway North Zoning Amendment draft law on October 13th at 4pm. The goal of the information session will be to explain the law's intent and the ways in which the zoning changes attempt to do that. If you are interested in these proposed changes please attend the session, this will be one of the final informal conversations before we move into the formal public hearing format. A Link to the draft law is available on the homepage of the Village website, Click “Gateway North Zoning Amendment Info Session, 10/13, 4PM” under Government & Committee News to reach the link: https://www.redhookvillage.gov/DocumentCenter/View/2203/VORH_GN_LocalLawDraft_250924 ## **Planning/Zoning & Building Department:** See attached Reports.

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: