Red Hook WatchIndependent Community Resource

Resolution in Support of Installation of School Speed Zones for the Red Hook Linden Avenue Middle School & Red Hook High School

1 versions2025-10-06working document

Document

RESOLUTION # - 2025 DATED: October 6, 2025

A meeting of the Village of Red Hook Board of Trustees was convened in public session at the Village Hall, 7467 South Broadway, Red Hook, NY on October 6, 2025. The meeting was called to order by Mayor Smythe.

RESOLUTION IN SUPPORT OF INSTALLATION OF SCHOOL SPEED ZONES FOR THE RED HOOK LINDEN AVENUE MIDDLE SCHOOL & RED HOOK HIGH SCHOOL

WHEREAS, Red Hook Linden Avenue Middle School has entrances on both County-owned Linden Avenue and State-owned West Market Street, and

WHEREAS, Red Hook High School has an entrance on State-owned West Market Street, and

WHEREAS, NYS law allows for the establishment of a school speed zone when there are students who walk or bike to school, and

WHEREAS, the safety of our school community is of utmost importance.

NOW THEREFORE BE IT RESOLVED that the Village Board of Trustees is in support of establishing school speed zones in the Village of Red Hook.

Motion by: Seconded by:

Vote:

Vote:
Mayor Smythe☐Aye☐Nay☐Abstain☐Recuse☐Absent/Excused
DeputyMayorKjarval☐Aye☐Nay☐Abstain☐Recuse☐Absent/Excused
Trustee Uku☐Aye☐Nay☐Abstain☐Recuse☐Absent/Excused
Trustee Smith☐Aye☐Nay☐Abstain☐Recuse☐Absent/Excused
Trustee Maccarini☐Aye☐Nay☐Abstain☐Recuse☐Absent/Excused
Vote Total
ResultMotion:

I hereby attest that the above Resolution was approved by the Board of Trustees at its October 6, 2025 meeting, and that I have been authorized to sign this Resolution by decision of the Board of Trustees

______________________ ____________________ Jennifer Cavanaugh, Clerk Date

Changes between versions

2025-09-082025-09-08
clerical+00

The document remains substantively unchanged.

  • Header metadata changed from '2025-09-08 — Water Department Report — Trustee Amy Smith — August 2025' to '2025-09-08 — Water Department Report — August 2025' (removal of Trustee Amy Smith)
Show red-line diff
## Village of Red Hook WATER DEPARTMENT REPORT ## August 2025 H2O Innovation Operation & Maintenance LLC has completed their first full month as our Water Operator. We had an operational meeting on August 20[th] where we reviewed water operations. We discussed the transfer to H2O for the water reports. H2O will be confirming with Dutchess County Department of Health what information they would like to have in our monthly water reports. There have been some low chlorine residuals at certain end points in our water system. We discussed the possibility of adding automatic flushing to the hydrants in those locations. Rich from Rural Water came to the Village to aid in finding possible leaks in the system. He is due to return to confirm certain locations. We reviewed the sampling plan which we have but not in a clear written form. H2O will be aiding in the development of this formal plan. At the Water Treatment Plant, a check valve is scheduled to be installed. There are check valves at each of the Wells, but there is not one in the Plant itself. All the parts are here. The work should be completed in September.
2025-09-082025-09-08
clerical+00

The document remains unchanged.

Show red-line diff
## Village of Red Hook WATER DEPARTMENT REPORT ## August 2025 H2O Innovation Operation & Maintenance LLC has completed their first full month as our Water Operator. We had an operational meeting on August 20[th] where we reviewed water operations. We discussed the transfer to H2O for the water reports. H2O will be confirming with Dutchess County Department of Health what information they would like to have in our monthly water reports. There have been some low chlorine residuals at certain end points in our water system. We discussed the possibility of adding automatic flushing to the hydrants in those locations. Rich from Rural Water came to the Village to aid in finding possible leaks in the system. He is due to return to confirm certain locations. We reviewed the sampling plan which we have but not in a clear written form. H2O will be aiding in the development of this formal plan. At the Water Treatment Plant, a check valve is scheduled to be installed. There are check valves at each of the Wells, but there is not one in the Plant itself. All the parts are here. The work should be completed in September.

References

This document cites or incorporates the following separate documents:

Referenced by

These other documents cite or incorporate this one:

Recurring pattern

These other chains use the same template but are separate decisions: