Price Quote: Paving Various Roads — Red Hook, New York

1 versions2025-04-07working document

Versions

  1. 12025-04-07

Document

Callanan Industries, Inc.

P.O. Box 15097 Albany, NY 12212-5097 Phone: (518) 374-2222 e Fax: (518) 381-6779

PRICE QUOTE Red Hook, New York To: Village of Red Hook Phone: 845-444-0866 Fax: E-Mail: highway @redhooknyvillage.org Attn: Mr. Jake Smith Date: April 7, 2025 We propose to complete the following scope of work: Paving Various Roads — OGS Pricing att’d + 2,125 TON

e Sweep existing pavement prior to paving e Furnish and install tack coat, as required e Furnish and Install approx. 2.25-2.5" 12.5MM Superpave Top Course

Callanan Industries, Inc. can supply the paving material and installation services based upon the NYSOGS Contract Group #31502 Bituminous Concrete bid. Our contract was awarded on April 1°, 2025 under Award #23371 Callanan Industries would supply all labor, equipment, material and trucking to complete this project.

The Village of Red Hook would be responsible for the maintenance and protection of traffic, prep work prior to paving, and a water source for rollers.

If you have any questions or wish to schedule this work, please contact me at your earliest convenience at (518) 374-2222 ext. 72027.

Nick Duncan, Construction Manager

CC: Todd Anson, Cll

Qualifications:

==> picture [546 x 306] intentionally omitted <==

----- Start of picture text -----

° Prices based on one (1) move in(s). Any additional moves will be charged at $2,500.00 each. e Price based on completion in 2025 paving season. ° Excludes Bond, Survey, M&PT, Testing, Pavement Cleaning, Saw Cutting, Rebates or Prime Coat. ° All cold weather paving (after November 15"" and prior to April 1%) will require an additional charge. e Water for rollers to be supplied by General Contractor ° Taxes excluded If you have any questions, please contact the Estimating Department. nnna General Conditions: Unless otherwise stated above, prices Net monthly payments are for those portions of work This offer, including the performance of labor and quoted are firm only if this offer is accepted which have been completed and are based on installed __ the furnishing of materials, shall be subject to strikes, within 30 days of the above date. Additionally quantity. Final payment is due within 30 days of the labor disputes or other causes beyond the control of . Pail ¢ completion of our work. Cll. paving work not completed within 60 days of Cll will not be responsible, unless agreed to in The terms of this offer are binding and notsubject signed Proposal may be subject to asphalt writing, for paving completed in what Cll determines to to modification unless in writing and signed by both price escalation in accordance with NYSDOT _ be unfavorable conditions. parties. asphalt price adjustment formulas. Failure to provide a capital improvement certificate Finance charges will be collected on all accounts Work subject to Asphalt Plant opening and or a tax exempt certificate within 60 days will result in over 30 days old at 1%% per month, as well as closing schedule. taxes being applied to this offer. Cll reserves the right reasonable collection fees and attorney fees to rescind this offer and/or demand adequate necessary to collect any amounts past due assurances of suitable credit rating. A completed credit application must accompany the return of this Agreement, Owner: The above prices, specs, notes and conditions are Callanan Industries, Inc satisfactory and are hereby accepted. Se Et —————EEEEE ES Name & Title Name & Title Signature Date Signature Date ----- End of picture text -----

U:\Construction\Callanan\CONSTRUCTION\Quotes\2023 Quotes\Village of Red Hook - 2023 In Place.doc

Village of Red Hook 2025 Paving Prices 4/7/2025

Site1Cambridge Drivet550 Ton
Approx 2.25" Compacted 12.5MMTop &T&LCourse
12.5MMTop550Tons@s77.00S42,350.00
AsphaltTrucking550Tons@$s5.00S2,750.00
Tack Coat265Gal@Ss5.00S1,325.00
Paverw/Screedman & Operator1Days@S$5,250.00S5,250.00
Rollerw/Operator2Days@S$2,250.00S4,500.00
Laborers3Days@Ss1,250.0053,750.00
Equip Mobilizations3EA@S$1,000.0053,000.00
Total Paving$62,925.00
Site2Maizeland Road+905 Ton
Approx 2.5" Compacted 12.5MMTop&T&LCourse
25.0MM Binder45Tons@$s72.0053,240.00
12.5MM Top860Tons@S$77.00S$66,220.00
AsphaltTrucking905Tons@S$5.00S4,525.00
Tack Coat310Gal@$s5.00S1,550.00
Paverw/Screedman & Operator1Days@S$5,250.00S6,562.50
Rollerw/Operator2.5Days@$2,250.00S5,625.00
Laborers
Equip Mobilizations3.75
3Days
EA@
@S$ S$1,250.00
1,000.00S
S4,687.50
3,000.00
Total Paving§95,410.00
Site3Margaret Streett320 Ton
Approx 2.5" Compacted 12.5MM Top &T&LCourse
12.5MM Top320Tons@S$77.00S24,640.00
AsphaltTrucking320Tons@S$5.00S1,600.00
TackCoat135Gal@s5.005675.00
Paverw/Screedman &Operator1Days@S$5,250.00S5,250.00
Rollerw/Operator2Days@$2,250.00§4,500.00
Laborers
Equip Mobilizations3
3Days
EA@
@§ =
S$1,250.00
1,000.00S
53,750.00
3,000.00
TotalPaving543,415.00

Site 4 Tower Drive

350 Ton

Approx 2.5" Compacted 12.5MM Top & T&L Course

25.0MM Binder40Tons@Ss72.00S2,880.00
12.5MM Top310Tons@$77.00S23,870.00
AsphaltTrucking350Tons@$5.00S1,750.00
Tack Coat135Gal@§$5.00S675.00
Paverw/Screedman & Operator1Days@S_5,250.00S5,250.00
Rollerw/Operator2Days@2,250.00S4,500.00
Laborers3Days@S$1,250.00S3,750.00
Equip Mobilizations3EA@S$1,000.0053,000.00
TotalPaving§45,675.00