TOWN OF RED HOOK WATER DISTRICT NO. 1 Public Water System ID: NY 1302788 September 15, 2022 Work Session Summary August 2022 Monthly Reports
Attendees:
Hank Van Parys, Chairman, Doreen Buono, Secretary, Fernando Dongo, C3ND Services, Gerry Gilnack, Co- Chairman, Bill Hamel, Town Board Liaison
Monthly Items
Normal
August 2022
Water Pumped Some usage by Bard College
70 Kgpd
82 Kgpd
- Well levels:
Well 1 – Well 2 –
Well 1 Well 2 -
50 Resting 35 Resting
- Pump Volumes: Well # 1 Pumping @ Well # 2 Pumping @ Well #2: New Pump & Motor are installed – All is secure !!
92 GPM** 94 GPM**
- Coliform Report
none detected
-
Turbidity (NTU)
-
Chlorine Residual
Page 1 of 3
40
Running Running
none detected
<1.0 required .05 NTU* *(Nepthalometric Turbitdity Units) <1.0 goal
0.7 PPM* *(parts per Million)
Ongoing items:
- 2022 Water Test Requirements: PFOS - yearly PFOA - yearly DIOXANE - yearly Asbestos - every 9 Yrs. Lead, Copper - every 3 years (10 Sites between 6/3 & 9/3) Nitrate - yearly POC & MTBE - yearly Disinfection by-products: THMS - yearly HAA5 - yearly
STATUS done 8/2022 * done 8/2022 * due by 12/01/2022 due by 12/31/2030 due by 09/30/2024 due 12/31/2022 due 12/31/2022
Done - 8/2022 * Done - 8/2022 *
- PFOA/OS and Disinfection by products were done this summer. The were done along with the THMS and HAA5 Tests.
Current Inventory: We have 1 - 5 Micron filter cartridges in stock. – changed 5. We have 1 - 1 Micron filter cartridges in stock. – changed 5. Top-seals in stock = 2.
Ordering 5 Ordering 5 Ordering 5
SODIUM HYPOCHLORITE (chlorine) current supply: IN 5 GALLON CONTAINERS: Empty = 46 / Full = 16 - ordering
Page 2 of 3
Ongoing Items: 4. Tank Inspection: Tank inspection report indicates that the tank is in good condition. But it should be rehabilitated, (painted) or replaced. We will work with Tighe and Bond to produce an RFP for repainting. We have a cost sizing for replacing. We are seeking grant for tank replacement. 5. Fences: Poison Ivy on fences: Done. Will need to do again. 6. Pump and Motor for Well #2 The new pump and motor are operating satisfactorily! 7. Ross Valve: Is due for overhaul. 8. Valve Installation: Fernando will look into installation of a valve in the water main In the Manor/Colonial area. 9. Lead Service Line Inventory: Fernando will send information for required online inventory
Page 3 of 3