Red Hook WatchIndependent Community Resource

Authorize moratorium law draft for natural resource protection

Meetings/Resolutions/(operational)
Expiredoperationalone_timeAuthorize the Town Attorney and Town Planner to draft a moratorium law protecting natural resources (water and soil mining) for up to one year to allow time for zoning code updates, with existing construction and business operations to continue uninterrupted.
First seen
2017-08-04
Latest event
2017-08-04
adopted
Expires
2018-08-04

Resolution text

RESOLVED

  1. the Town Attorney and Town Planner are authorized to prepare a moratorium law to protect natural resources up to one (1) year to allow for necessary protection measures, with normal construction and existing business operations to continue at current levels during the moratorium term

Lifecycle (1 event)

2017-08-04adoptedvote: 3-0
Authorize the Town Attorney and Town Planner to prepare a moratorium law to protect natural resources for up to one year.
moved by Colgan · seconded by Imboden
Show text snapshot for this event
Resolved
  1. the Town Attorney and Town Planner are authorized to prepare a moratorium law to protect natural resources up to one (1) year to allow for necessary protection measures, with normal construction and existing business operations to continue at current levels during the moratorium term
Subject key: natural_resources_moratorium