RESOLUTION ADOPTING A SEQRA DETERMINATION OF NONSIGNIFICANCE FOR THE NYS DOT SAWKILL BRIDGE REPLACEMENT PROJECT
One-time (complete)formal_resolutionone_timeThe Town Board adopts a negative declaration determining that the proposed Sawkill Bridge replacement project will not have a significant adverse impact on the environment and directs the Town Clerk to distribute the resolution to all involved and interested agencies.
First seen
2024-08-28
Latest event
2024-08-28
adopted
Expires
—
Resolution text
RESOLVED
- The Town Board hereby adopts a negative declaration in the form attached and determines that the proposed action will not result in any significant adverse environmental impacts and that a Draft Environmental Impact Statement will not be prepared
- The Town Board authorizes and directs the Town Clerk to distribute a copy of this resolution to all involved and interested agencies, the Town Supervisor, and any person that has requested a copy and to make all other filings required by law.
Show preamble — 5 WHEREAS clauses
- WHEREAS, the Town Board of the Town of Red Hook is considering a project to replace the existing functionally deficient bridge that carries Saw Kill Road (also known as Aspinwall Road) over the Saw Kill Creek. The 29-foot span existing bridge was constructed in 1930 and is nearing the end of its service life. This project will include a full bridge replacement of the existing bridge with a new longer span which improves the hydraulic capacity and provides the load rating to meet the NYSDOT standards of HL-93. The proposed bridge would be a 42-foot span, 26-foot wide, three-sided precast concrete structure
- WHEREAS, on July 30, 2024, the Town Board classified this project as an unlisted action and declared themselves as lead agency in a coordinated review, to which no agency has objected
- WHEREAS, the Town Board has prepared a Short Environmental Assessment Form (EAF) for the proposed action
- WHEREAS, the Town Board has considered the criteria contained in 6 NYCRR 617.7 and thoroughly analyzed all identified relevant areas of environmental concerns disclosed in the EAF and any comments of involved or interested agencies
- WHEREAS, the Town Board has reviewed a draft Negative Declaration setting forth reasons supporting a determination that the proposed action will not have a significant adverse impact on the environment
Lifecycle (1 event)
2024-08-28adoptedvote: unanimous
Adopt a SEQRA determination of nonsignificance for the NYS DOT Sawkill Bridge Replacement Project.
moved by Hamel · seconded by Testa
Show text snapshot for this event
Resolved
- The Town Board hereby adopts a negative declaration in the form attached and determines that the proposed action will not result in any significant adverse environmental impacts and that a Draft Environmental Impact Statement will not be prepared
- The Town Board authorizes and directs the Town Clerk to distribute a copy of this resolution to all involved and interested agencies, the Town Supervisor, and any person that has requested a copy and to make all other filings required by law.
Whereas
- WHEREAS, the Town Board of the Town of Red Hook is considering a project to replace the existing functionally deficient bridge that carries Saw Kill Road (also known as Aspinwall Road) over the Saw Kill Creek. The 29-foot span existing bridge was constructed in 1930 and is nearing the end of its service life. This project will include a full bridge replacement of the existing bridge with a new longer span which improves the hydraulic capacity and provides the load rating to meet the NYSDOT standards of HL-93. The proposed bridge would be a 42-foot span, 26-foot wide, three-sided precast concrete structure
- WHEREAS, on July 30, 2024, the Town Board classified this project as an unlisted action and declared themselves as lead agency in a coordinated review, to which no agency has objected
- WHEREAS, the Town Board has prepared a Short Environmental Assessment Form (EAF) for the proposed action
- WHEREAS, the Town Board has considered the criteria contained in 6 NYCRR 617.7 and thoroughly analyzed all identified relevant areas of environmental concerns disclosed in the EAF and any comments of involved or interested agencies
- WHEREAS, the Town Board has reviewed a draft Negative Declaration setting forth reasons supporting a determination that the proposed action will not have a significant adverse impact on the environment
Subject key:
sawkill_bridge_replacement_seqra