Red Hook WatchIndependent Community Resource

Water Supply and Service Agreements

2026last touched · 20 source resolutions
Village/Rules/Policies/Adopted/water_supply_agreements
Resolutions authorizing individual water service connection agreements, supply contracts with outside parties, consecutive water system agreements, and agreements with DCWWA for water and sewer service.
In force, by year of last update
2026this year
Water Supply Agreement — 65 Willow Brook Lane
The Mayor is authorized to execute a Water Supply Agreement with 65 Willow Brook Lane in the Town of Red Hook.[20]
2025
Water Connection Authorization — 14 Blue Echo Road
14 Blue Echo Road (located outside Village bounds) is authorized to connect to the Village's water system, pending execution of a service contract and payment of a tapping fee. The Mayor is authorized to sign the water service contract, which was corrected to remove the word 'average' from consumption limits and to add language establishing that Village Code controls in case of conflict.[16][18]
Water Service Agreement — 32 Hewlett Road
The Mayor is authorized to sign a Water Service Agreement with 32 Hewlett Road in the Town of Red Hook to provide Village water service to that town property.[19]
2024
DCWWA Consecutive Water System Agreement — Traditions at Red Hook
The Village and DCWWA operate the Traditions at Red Hook water system as a consecutive system with the Village Water System. The Mayor is authorized to sign the DCWWA Consecutive Water System Agreement and Addendum; DCWWA is responsible for repairs, a certified Operator-In-Responsible-Charge, cross-connection control, public notifications, flushing, leak detection, meter reading, accounts payable, and customer service.[9][10][14]
Intermunicipal Sewer Agreement Amendment — Town of Red Hook
The Mayor is authorized to sign an amendment to the Intermunicipal Sewer Agreement with the Town of Red Hook.[15]
2023
Bell Jar LLC (Mighty Donuts) Water Service Agreement
The Village provides water service to Bell Jar LLC (a.k.a. Mighty Donuts) at 7268 South Broadway, connected from the Old Farm Road water main. The Mayor is authorized to sign the water service agreement; the applicant is responsible for easements and the service line after the Village curb stop.[8][11]
Water Interconnect IMA — Town and Village of Red Hook
The Mayor is authorized to sign the Extension/1st Amendment to the Water Interconnect Inter-Municipal Agreement between the Town and Village of Red Hook, originally dated November 1, 1991.[12][13]
2022
LIHWAP Water Assistance Program Authorization
The Mayor is authorized to sign the NYS forms required to accept and distribute water assistance payments to eligible low-income households through the Low Income Household Water Assistance Program (LIHWAP).[7]
2020
RT 9 / Old Farm Road Water Main Extension — TGS Associates & Red Hook Land Corp
The Mayor is authorized to execute easements and water supply contracts with T.G.S. Associates Inc. and Red Hook Land Corp. for a water loop and main extension on Route 9 to Old Farm Road. The two private parties supply easements and bear all labor and material costs for construction; the Village applies for the NYS DOT permit for the directional drill crossing below Route 9.[5]
2018
Hoffman Farms Water Sale Rate
The Village sells water to the Dutchess County Water and Wastewater Authority (DCWWA) for the Hoffman Farms project at a rate of 1.525 times the then-current Village water rate, rising as the base Village rate increases over time. The DCWWA serves as the Village's water customer for the project and is responsible for maintenance, billing, and collection.[3][4]
Hoffman Farms Infrastructure Conditions
The Hoffman Farms water supply agreement is conditioned on: creation by the Dutchess County Legislature of a Zone of Assessment encompassing the project; construction at the developer's expense of required water infrastructure with an offer of cession to convey infrastructure and easements to the Village for $1.00; establishment of a developer escrow account for legal and engineering expenses; and Village Engineer review and approval of design and construction.[3][4]
2009
DCWWA Sewer Service Consent
The Village consents to the provision of sewer service by the Dutchess County Water and Wastewater Authority to individual consumers within a specified area of the Town, contingent upon Village Attorney approval.[1]
History · superseded or expired
2025
Water Service Contract — 35 Blue Echo Road
Resolution to authorize the Mayor to sign a water service contract with 35 Blue Echo Road (Town of Red Hook) was withdrawn at the March 27, 2025 meeting.[17]
2020
DCWWA Consecutive Water System Agreement — Initial Term 2021
Tabled at the December 14, 2020 meeting; the agreement covered a one-year term commencing January 1, 2021 and ending December 31, 2021. Superseded by subsequent annual renewals and the 2024 agreement.[6]
2014
Letter of Intent — Water Supply to TND Hoffman Farms
Superseded by the formal Water Supply Agreement authorized in 2016 and 2018. The Village issued a letter of intent to supply water to the TND Hoffman Farms residential project, contingent on formal district creation, capacity availability, pricing agreements, and escrow payment of engineering and legal costs.[2]
Source resolutions
  1. [1]2009-02-02DCWWWA—A resolution consenting to the provision of sewer service by the Dutchess County Water and Wastewater Authority to individual consumers within a specified area of the Town
  2. [2]2014-11-10Letter of Intent – Water Supply to TND Hoffman Residential Project
  3. [3]2016-09-12Water Supply Agreement for Hoffman Farms Project
  4. [4]2018-07-09Agreement between DCWWA and Village of Red Hook - Hoffman Farms Water Sale
  5. [5]2020-06-18RESOLUTION TO AUTHORIZE MAYOR TO EXECUTE EASEMENTS AND CONTRACTS - WATER SUPPLY AND WATER MAIN EXTENSION – RT 9 TO OLD FARM ROAD
  6. [6]2020-12-14DCWWA Consecutive Water System Agreement
  7. [7]2022-03-14LIHWAP Program Authorization
  8. [8]2022-04-11Mighty Donuts water service connection
  9. [9]2022-04-11Dutchess County Water & Wastewater Authority agreement renewal
  10. [10]2022-12-12DCWWA Water System Agreement Acceptance
  11. [11]2023-01-26Water Agreement with Bell Jar LLC
  12. [12]2023-05-08Water Interconnect IMA Extension Authorization
  13. [13]2023-05-25Water Interconnect IMA Agreement Extension/1st Amendment
  14. [14]2024-03-28DCWWA Consecutive Water System Agreement Authorization
  15. [15]2024-12-09Amendment to Intermunicipal Sewer Agreement
  16. [16]2025-02-27Water System Connection for 14 Blue Echo Road
  17. [17]2025-03-27Water Service Contract 35 Blue Echo Road
  18. [18]2025-04-24Water Service Contract with 14 Blue Echo Road
  19. [19]2025-08-11Water Service Agreement with 32 Hewlett Road
  20. [20]2026-02-23Water Supply Agreement with 65 Willow Brook Lane

Synthesized from the chronological history of these resolutions. Each clause shows the year it was last established or amended. The text is a reading aid — for legal force, consult the source resolutions and the Village Code.