Red Hook WatchIndependent Community Resource

9 2022

Meetings/Documents/wwtp::1821_9-2022
Working document2022-09-01

Village of Red Hook Water & Wastewater Treatment

7467 South Broadway, Red Hook, New York 12571

11/07/2022

Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane annual samples were collected for Wastewater System Notes: Sample results for September 2022, with reporting submitted 2022 from each well with below regulatory limit results. on or before October 28th 2022.

Water SystemWater SystemWastewater System
Water System Notes:The PFOA/PFOS, 1,4 Dioxane annual samples were collected for
2022 from each well with below regulatory limit results.Wastewater System Notes: Sample results for September 2022, with reporting submitted
on or before October 28th 2022.
Monthly Total Coliform

All monthly coliform tests were completed with no presence of coliform or e. coli

September 2022 Required Samples Result Compliance BOD <4.0 TSS 3.7 10 mg/L NH3 <0.50 1.81 mg/L Fecal Coliform <1.0 200/100 mL

Deficiencies Well 9 Vent Completed on 10/10 Well 3 Pressure Gauge Completed on 10/31 Well 15 Number Placard Completed on 10/31 Well Control Issues Well controls need to be evaluated as communication issues have occurred. Delaware Engineering is presenting to new Mayor. Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in place. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells 14 & 15 as there is a short in wiring between the plant and the wells Storage Tank Inspections All storage tanks have been inspected and are awaiting report.

Deficiencies Anoxic Mixers Currently a Medora mixer in place to keep Anoxic tank solids moving. May need to consider this in future updates. Sand Filter Rebuild Sand Filters have never been rebuilt or media replaced. Should price and schedule for the near future. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sent for review. Blower System Maintenance Parts have been ordered. Waiting for oil & belts. Pump Station Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Backflow Prev. Replacement Facilities backflow Preventor in need of replacement.

|For Future Notes:|||