==> picture [243 x 46] intentionally omitted <==
----- Start of picture text -----
i3ND%a 7467Date:Village 11/02/2021South ofRedHookBroadway, WaterRed Hook, & WastewaterNew York 12571 Treatment ----- End of picture text -----
Consulting
==> picture [490 x 318] intentionally omitted <==
----- Start of picture text -----
Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collectedfrom each well |Wastewater System Notes: 4th Quarter samples due by December 3ist. with below regulatory limit results. We are currently working with Delaware Engineering to try and get reduced monitoring requirements. All monthly coliform tests were completed, Required Samples Result Compliance Monthly Total Coliform along with a 4th sample collected from BOD Due 5 mg/L Traditions, with na ppresencedt off califormcalifo or e. 4th QuarterSamples Required. NH3TSS Decby 2.210 mg/L mg/L ; Special Samples 3rd quarterTesting completedPFOA/PFOS, and are1,4awaiting Dioxane Fecal Coliform 34st 200/100 mt results. Deficiencies Deficiencies WellWell 3 PressureVent Gauge DownwardWell 3 Pressurefacing Gauge vent needs required to beper replacedDOH. per DOH Anoxic Mixers Solidscurrently moving. omearMaya needeed [to] to consider [ place] io “er this ftunure tom upcates.it Well 15 Number Placard Well 15 needs a new number placard per DOH Scind Fitiér Rebull Sand Filters have never been rebuilt or media replaced. Well Control Issues Weill contrals need to be evaluated as communication issues Should price and schedule for the nearfuture. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance Process blowers ore long overdue for maintenance. Belts Town/Village Interconnect 2020 test indicated this was not a viable option for Village and oils should be purchased [for][ preventative] [maintenance.] flow in case of emergency. Engineering review currently in |pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Weil Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to wells 14 & 15 as there is a short in wiring P Station Purp Failure between the plant and the wells ump ofan P Pump Station pump and check valve have been replaced. Storage Tank inspections All storage tanks have been inspected and are awaiting Pump Station Lawn care Pump station in Need of weedwhacking. Does Village report. request C3ND to complete or Village personnel ----- End of picture text -----