Fixed MediaActivated Sludge
Process ControlProcess Control
RecirculationMedia effluentMixedLiquorSettleable SludgeReturn Act.WasteAct.
NH3DOTKNUODRatesettleable solidsS.S. (MLSS)Volume (SSV) ml/lSludge (RAS)Sludge (WAS)
DayDateInfluentEffluentInfluentEffluentInfluentEffluentInfluentEffluentM.G.Dml/lmg/l5 Minutes30 minutesM.G.D.lbs/day
19.9
20.210.0
310.2
410.5
59.8
610.2
79.9
810.1
910.7
109.1
119.9
129.6
139.1
149.2
159.3
16<0.19.03.826.64
178.9
188.8
198.3
208.5
219.0
228.5
239.0
248.8
2511.5
268.3
278.5
289.1
298.8
308.3
31
Min:
8.33.826.64
30 Day Average
Quantity<0.1
Loading (1)lbs/daylbs/daylbs/daylbs/day
(1)Refer to January1994 edition of_DMR Manual for completing the Discharge Monitoring Report for the national Pollutant Discharge Elimination System(NPDES) _forprocedures to calculate loadings,arithmetic mean, geometric Mean,maximum,
minimum, percent removal,etc
Page 4 of 4
Effect on Receiving StreamName and amount of chemicals used in treatment processSludge removal from plant:
Name of Receiving Streamduring month:a. amount6500
Subtrib of Saw Killa.gallonsb. solid content
b.gallonsc. Volitile Solids Content
DateStationParameterResultc.Gallonsd. Disposal Site:Superior Sanitation
d.lbs.
e.Gallons
f.Gallons
Amount of ecectricalpower consumed:Other Solid Wastes:
a. Commercialkilowatt hoursa. Screenings
b. Stand-bykilowatt hoursb. Grit
c. Ashes
Amount of fuelconsumed:d.
a. Natural Gascubic feete.
b. Oilgallonsf.
c. Gasolinegallonsg. Disposal Site
d. Coal.tons
e. Digester Gascubic feet
f.propanegallonsDigester Gas Wasted
Labor expended:
TRUCKED WASTE RECEIVED THIS MONTHPOSITION NAMENUMBERFULL TIMENUMBER PART TIMETOTAL HOURS
Operator120120
1-Septage, holding tank waste and
portable toilet waste
TotalMax day
Volume(Gal.)
2-All other wastes
TotalMax day
3-Number of Part 364 haulers currently
approved to transport wastes to this
POTW
a.Septage,etc
I herebyaffirm underpenaltyofperjurythat informationprovided on this form is true to the best of myknowledge andbelief. False statements
b. All othersmade herein arepunishable as a Class A misdemeanorpursuant to Section 210.45 of the PenalLaw.
Leslie A Coon Jr.
5/20/2026
Signature of Chief Operator or Designated FacilityRepresentativeDate