Water System Water System Notes: Monthly Total Coliform All results absent for the month Deficiencies Well Control Issues Waiting for SCADA update Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in place. Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells Well Level/Flow 14 & 15 as there is a short in wiring between the plant and the wells Well 14 & 15 Project Waiting for well pump data to finalize VFD startup. Installation work complete. For Future Notes: ----- End of picture text -----
Village of Red Hook Water Treatment Facilities Monthly Report
November 1, 2023
System Flow
During the month of October, the water treatment facility treated 7,095,500 total gallons, which is an average of 228,900 gallons per day. See below for the Annual Daily Average Flow Chart:
All bacteriological samples for the month were collected and transported to Pace Analytical Services, Newburgh, New York. Please see below for sample locations and results:
| Location | Total Coliform | E. Coli | |||
|---|---|---|---|---|---|
| Traditions Mail Room | Absent | Absent | |||
| 2 W. Market | Absent | Absent | |||
| 7519 N. Broadway | Absent | Absent |
Chemical Usage
During the month of October, the water treatment plant used 75 gallons of sodium hypochlorite. The average daily use was 2.4 gallons per day.