Maizeland Road Water Service Installation

Meetings/Resolutions/(operational)
One-time (complete)operationalone_timeApprove Option 1 to provide water service to the new building lot on Maizeland Road by tapping the existing 6-inch water main and extending a 1-inch copper water service line at a cost of $1,800.00.
First seen
2012-12-20
Latest event
2012-12-20
adopted
Expires

Resolution text

RESOLVED

  1. Option 1 is approved for water service installation on Maizeland Road at a cost of $1,800.00, which includes tapping the existing 6-inch water main and extending a 1-inch copper water service line to the new building lot.

Lifecycle (1 event)

2012-12-20adoptedvote: unanimous
Approve Option 1 to provide water service to Maizeland Road building lot at a cost of $1,800.00.
moved by Blundell · seconded by Trapp
Show text snapshot for this event
Resolved
  1. Option 1 is approved for water service installation on Maizeland Road at a cost of $1,800.00, which includes tapping the existing 6-inch water main and extending a 1-inch copper water service line to the new building lot.
Subject key: maizeland_road_water