Water Connection Requirements for Town Highway Garage
One-time (complete)operationalone_timeThe Town of Red Hook must use copper piping from the water main tap to the curb stop, then STR21 piping from curb stop to their facility. The Village water operator will perform the physical tap connection and the Village will be reimbursed by the Town for the operator's labor costs charged to the construction project budget.
First seen
2011-09-12
Latest event
2011-09-12
adopted
Expires
—
Resolution text
RESOLVED
- The Town must use copper from the tap on the main to curb stop and then STR21 from the curb stop to their facility, which will be the Town's responsibility in the future
- Village water operator must make the actual physical tap
- The Village be reimbursed for the construction project for the operator's actual accrued time
Lifecycle (1 event)
2011-09-12adoptedvote: unanimous
Town must use copper from tap on main to curb stop and STR21 from curb stop to their facility; Village water operator will make actual physical tap and Village will be reimbursed for construction project for actual accrued time
moved by Blundell · seconded by Trapp
Show text snapshot for this event
Resolved
- The Town must use copper from the tap on the main to curb stop and then STR21 from the curb stop to their facility, which will be the Town's responsibility in the future
- Village water operator must make the actual physical tap
- The Village be reimbursed for the construction project for the operator's actual accrued time
Subject key:
town_water_connection_highway_garage