CHIPS 2015 Catch Basin Repair and Replacement Project

Meetings/Resolutions/(operational)
Expiredoperationalone_timeAwards the bid for repair and replacement of catch basins, frames, grates and site restoration at eight locations throughout the Village to Frank Vosburgh and Sons, Inc. for $18,280.00, to be funded from the FY2014-2015 CHIPS allocation and NYSDOT Extreme Winter Recovery Appropriation.
First seen
2014-08-11
Latest event
2014-08-11
adopted
Expires
2014-09-26

Resolution text

RESOLVED

  1. Frank Vosburgh and Sons, Inc. is awarded the bid for catch basin restoration repair and replacement for $18,280.00. Work includes eight projects at various Village locations: West Market Street/Middle School Exit, #43, 53, 62 and Red Hook Electric on East Market Street, 5 Cambridge Drive, 20 Cambridge Drive, 10 and 15 Kent Road, Catholic Rectory, 15 Thompson Street, and Kent Road/Cambridge Drive intersection. All work includes replacing blacktop and/or topsoil, with materials supplied by the Village, all prevailing wage work, to be completed by September 26, 2014. Funding from FY2014-2015 CHIPS Allocation (#5110.3) and FY2014-2015 NYSDOT Extreme Winter Recovery Appropriation.

Lifecycle (1 event)

2014-08-11adoptedvote: unanimous
Award the bid for catch basin restoration repair and replacement to Frank Vosburgh and Sons, Inc. for $18,280.00.
moved by Kovalchik · seconded by Norris
Show text snapshot for this event
Resolved
  1. Frank Vosburgh and Sons, Inc. is awarded the bid for catch basin restoration repair and replacement for $18,280.00. Work includes eight projects at various Village locations: West Market Street/Middle School Exit, #43, 53, 62 and Red Hook Electric on East Market Street, 5 Cambridge Drive, 20 Cambridge Drive, 10 and 15 Kent Road, Catholic Rectory, 15 Thompson Street, and Kent Road/Cambridge Drive intersection. All work includes replacing blacktop and/or topsoil, with materials supplied by the Village, all prevailing wage work, to be completed by September 26, 2014. Funding from FY2014-2015 CHIPS Allocation (#5110.3) and FY2014-2015 NYSDOT Extreme Winter Recovery Appropriation.
Subject key: chips_2015_catch_basin_project