Red Hook WatchIndependent Community Resource

Approve C3ND water and sewer operator contracts

Meetings/Resolutions/(operational)
ExpiredoperationalongoingThe Mayor is authorized to sign two water and sewer operator contracts with C3ND with an end date of May 31, 2022 instead of the originally submitted term, and with removal of the CPI-linked rate provision from the contracts.
First seen
2022-02-14
Latest event
2022-02-14
adopted
Expires
2022-05-31

Resolution text

RESOLVED

  1. The Mayor is authorized to sign the two C3ND operator contracts for water and sewer systems with modifications to establish an end date of May 31, 2022 to allow for renegotiation with new scope of work as the new sewer infrastructure is activated, and with deletion of the CPI-linked rate provision

Lifecycle (1 event)

2022-02-14adoptedvote: unanimous
Authorize the Mayor to sign two C3ND operator contracts for water and sewer systems with modifications to end May 31, 2022 and remove CPI-linked rate provisions.
moved by Kjarval · seconded by Laing
Show text snapshot for this event
Resolved
  1. The Mayor is authorized to sign the two C3ND operator contracts for water and sewer systems with modifications to establish an end date of May 31, 2022 to allow for renegotiation with new scope of work as the new sewer infrastructure is activated, and with deletion of the CPI-linked rate provision
Subject key: water_sewer_operator_agreement