One-time (complete)operationalone_timeAccept the bid from C.T. Male in the amount of $27,810.00 for a preliminary engineer's report on water department system and infrastructure upgrades, contingent upon the Village's receipt of grant funding.
First seen
2010-02-01
Latest event
2010-02-01
adopted
Expires

Resolution text

RESOLVED

  1. the bid of $27,810.00 from C.T. Male for a preliminary engineer's report for the water department system/infrastructure upgrades is accepted, contingent on grant funding

Lifecycle (1 event)

2010-02-01adoptedvote: unanimous
Accept the engineering bid of $27,810.00 from C.T. Male for a preliminary engineer's report on water department system/infrastructure upgrades, contingent on grant funding.
moved by Seymour · seconded by Blundell
Show text snapshot for this event
Resolved
  1. the bid of $27,810.00 from C.T. Male for a preliminary engineer's report for the water department system/infrastructure upgrades is accepted, contingent on grant funding
Subject key: water_system_engineering_study