Hire VRI as Full Water Operator
Expiredoperationalone_timeThe Village Board authorizes hiring VRI as the full water operator at an increased rate of $1,680 per month (from the current $600 per month) for the period January 14 through May 31, 2019, to address meter repairs and other water system needs.
First seen
2019-01-14
Latest event
2019-01-14
adopted
Expires
2019-05-31
Resolution text
RESOLVED
- Hire VRI as full water operator for $1,680 (current is $600) from January 14th through May 31st to perform meter repairs and other required water system maintenance
Lifecycle (1 event)
2019-01-14adoptedvote: unanimous
Hire VRI as full-time water operator at $1,680 monthly from January 14 through May 31, 2019.
moved by Blundell · seconded by Trapp
Show text snapshot for this event
Resolved
- Hire VRI as full water operator for $1,680 (current is $600) from January 14th through May 31st to perform meter repairs and other required water system maintenance
Subject key:
vri_water_operator_contract