Red Hook WatchIndependent Community Resource

2026 02 24

Meetings/Documents/wwtp::2691_2026-02-24
Working document2026-02-24

©Copyright 1992-95, WindowChem Software, Inc., All Rights Reserved., (707) 864-0845, Revision 3.0

SECTION 1

New York State Department of Enviromental Conservation Division of Water Report Noncompliance Event To: DEC Water Contact Report Type: Permit Violation Order Violation Anticipated Noncompliance X Bypass/Overflow SECTION 2 SPDES #:NY-0271420 Facility: Village of Red Hook Date of noncompliance: 2/24/2026 Location (Outfall, Treatment Unit, or Pump Station): Outfall Description of noncompliance(s) and cause(s): 1B both lost solids through the clarifier due to hydraulic overload caused by the tertiary filters blinding and then overflowing into the clearwe Has event ceased? Yes If so, when? 2/24/2026 Was event due to plant upset? Yes SPDES limits violation YES Start date, time of event: 2/24/2026 , (AM)(PM) End date, time of event: 2/24/2026 est 7:30AM (AM)(PM) Date email notification made to DEC? 2/20/26 , (AM)(PM) DEC Official contacted: Vijay Gandhi Immediate corrective actions: Stop influent flow, shut off blowers to retain solids, clean reaeration tank, clearwell and UV systems before putting plant back online Preventive (long term) corrective actions: Install alarm systems to notify operator of high level events SECTION 3 Complete this section if event was a bypass: Bypass amount: Was proir DEC authorization received for this event? (Yes)(No) DEC Official contacted: Date of DEC approval: Describe event in "Description of noncompliance and cause" area in Section 2. Detail the start and end dates and times in Section 2 also Forms by EnviroWin (312-244-1900) SECTION 4 Facility Representative Leslie A Coon Jr Title: Sr. Area Manager Date: 2/25/2026 Phone #: 845-544-3151 Fax #:

3506-101 (12/93)